| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹36.5 LAccepted-Finance F NO 312 3RD FLOOR HERITAGE PRINCESS OPP ALMEIDA SCHOOL PONDA GOA 403 401 | SOUTH GOA | GOA | 403401 | 1 | Accepted-Finance L1 Bidder | |
| 2 | 2₹36.9 L+₹46,126.20 (1.26%)Rejected-Finance | 2 | Rejected-Finance L2 Bider |
Tender Value
₹35.4 L
EMD Value
₹70,760
Closing Date
29 Dec 2023, 4:00 pmClosed
EE III
EE , WD III, WRD, Ponda Goa
Construction of protection wall to the land on left bank of Kapileshwari nallah under survey No.7 of Ponda Village near old bus stand in Ponda Taluka.
2023_WRD_12951_1
10/23-24/ACT/WDIII/WRD/543/s1
Open Tender
Miscellaneous Works
Item Rate
45 days
Ponda
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹70,760
12 Nov 2024
15 Dec 2023
2 Jan 2024
15 Dec 2023
29 Dec 2023
15 Dec 2023
Amount
Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all verietes shingles.pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as describe under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling , wedging etc . excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of Side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc.complete
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete and dewatering the trenches and bailing out water including removal of slush, mud etc. for any depth and disposal of pumped mud, water, slush to suitable point not forming circuit of return of pumped water to the very trench, by employing method as suggested bu Engineer in charge.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 15kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level (v) M-30grade of concrete
Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.
b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge. A) 110 mm dia
Providing construction joints with 20mm thick thermacol sheets including cutting and placing in position etc. Complete as per direction of Engineer in charge.
Noorudeen C. K.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .