| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81,600Accepted-Finance GANGYAL JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹84,000+₹2,400 (2.94%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹84,280+₹2,680 (3.28%)Accepted-Finance | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
19 Dec 2022, 2:00 pmClosed
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Repair / Replacement of various damaged components of Electro-mechanical machinery installed at L.I.S Langar.
2022_IFC_199290_1
MID/AN/144
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
20 days
Rajal
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
7 Jan 2023
12 Dec 2022
20 Dec 2022
12 Dec 2022
19 Dec 2022
14 Dec 2022
13 Dec 2022
Repair / Overhauling 93 mtrs. head, 0.70 cusec discharge, Pump no 01 at L.I.S Langer by way of Dismantling of pump and motor from the base plate . Dismantling the pump. Replacement of gland sleeve, Chuck nut, Neck ring, locking, cotter, gland bracket, bearings etc. as per sample. Rebuilding / reconditioning of impeller and impeller shaft by metalling with high class rod at all worn out portions and then machining turning, finishing to true size along with repairs reconditioning of key ways of impeller and impeller shaft, also necessary repairs to bearing housing and gland . P/F of gland packing and sheet joints. Job includes Dismantling the 50 H.P motor by separating side covers, extraction the rotor from the stator. Cutting of damaged coils of stator and extracting out of slots, complete cleaning of slots and fixation of simulation material in slots, complete rewinding of the coils of stator with high class material inserting then into the slots of stator. Complete varnishing of motor and then heating the stator with the help of oven etc. Complete cleaning of Rotor of the motor . P/F of new sleeves on the side covers with turning, making to bearing size and P/F of new bearings and then assembling the motor. Providing & fitting of new star coupling of L-190 along with its bush. Assembling the complete unit on the base plate & fitting the suction and delivery side pipe after P/F of nuts, bolts,washers & gasket in place of worn out /damaged after then testing the pump on load. It includes charges for testing, commissioning, disengaging and refitting, installation of pump. Complete Job.
Providing & fitting of 4 inches Dia. foot valve by way of extraction of suction pipe & cutting of approx 2 feet length 4 inches dia. damaged pipe and welding the same length piece of pipe with one end having threads for installation of Foot valve on it . Again installing the suction pipe to the pump after P/F of nuts, bolts,washers & gasket in place of worn out /damaged . job includes the cost of material , labour charges for skilled and semi-skilled workers for execution of job /handling the components with hire charges for deployment of tools and tackles at site etc. Complete Job
To & fro shifting the damaged pump & motor manually from L.I.S. Langer through head load to road side at a distance of Approx. 0.5 km & then to work shop through mech. transportation & then from workshop to L.I.S Langer. Complete Job.
TARSAIM ELECTRICAL WORKS
KHALSA ENGG. WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .