| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹1.7 CrRejected-Finance | ₹1.7 Cr | L2 | Rejected-Finance Highest Bid |
| Sl No | Description | Qty | Unit | M/s Naney Enterprises L1 | Ms MK Enterprises L2 |
|---|---|---|---|---|---|
| 1.00Earth Work | |||||
| 1.01 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 4,597.64 | Cum | 412 ₹18.9 L | 410.61 ₹18.9 L |
| 1.02 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 769.79 | Cum | 184.41 ₹1.4 L | 186.09 ₹1.4 L |
| 1.03 | Filling in plinth with sand under floors including watering, ramming, consoledating and dressing complete. | 614.4 | Cum | 992.43 ₹6.1 L | 1,001.44 ₹6.2 L |
| 2.00Concrete work | |||||
| 2.01 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 309.18 | Cum | 588.76 ₹1.8 L | 594.11 ₹1.8 L |
| 2.02 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level. | 489.22 | Cum | 7,758.97 ₹38.0 L | 7,774.63 ₹38.0 L |
| 2.03 | Centring and shuttering including strutting proping etc. and removal of form work for: a) Walls including attached buttresses, pilasters etc.
b) Wall any (thickness) | 1,124.64 | Sqm | 664.96 ₹7.5 L | 666.3 ₹7.5 L |
| 2.04 | c) Lintels,beams,post and struts etc. | 45 | Sqm | 454.98 ₹20,474.10 | 455.9 ₹20,515.50 |
| 2.05 | d) Columns,Pillars,Posts and struts etc | 40.32 | Sqm | 454.97 ₹18,344.39 | 455.89 ₹18,381.48 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
30 Mar 2026, 9:00 amClosed
Executive Engineer, Nari
O/O Executive Engineer, PWD Nari Division
1.Academic Block 2.Septic Clock
2026_PWDAP_3272_1
ND/CONT/6/NIT/BE/2025-2026/667 dated 18/03/2026
Open Tender
Civil Works - Building
712 days
Nari
Refer Tender Documents
5 documents required · 5 mandatory
₹5,000
EE PWD Nari Division
₹1.7 L
31 Mar 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth Work | |||||
| 1.01 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | - | Cum | - | - |
| 1.02 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | - | Cum | - | - |
| 1.03 | Filling in plinth with sand under floors including watering, ramming, consoledating and dressing complete. | - | Cum | - | - |
| 2Concrete work | |||||
| 2.01 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | - | Cum | - | - |
| 2.02 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level. | - | Cum | - | - |
| 2.03 | Centring and shuttering including strutting proping etc. and removal of form work for: a) Walls including attached buttresses, pilasters etc.
b) Wall any (thickness) | - | Sqm | - | - |
| 2.04 | c) Lintels,beams,post and struts etc. | - | Sqm | - | - |
| 2.05 | d) Columns,Pillars,Posts and struts etc | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3467.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_3467.xls
BOQ • 0.36 MB
NIT.pdf
Tender Documents • 1.46 MB
Download all tender documents and submit your bid