Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
4 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer SMD PHE Dte
CHETLA
Making temporary illumination arrangement including construction of temporary structure at Ganga Sagar Main Mela Ground in connection with Ganga Sagar Mela 2027
2026_PHED_5087297_3
WBPHE/EE/SMD/NIeT-28 of 2026-27
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Ganga Sagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.9 L
19 Nov 2026
19 Nov 2026
7 Dec 2026
19 Nov 2026
4 Dec 2026
19 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C. | 23,000 | Mtr | - | - |
| 2 | Carrying of departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC. | 1 | Unit | - | - |
| 3 | Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 01.01.2027 including proper earthing arrangement complete as per direction of EIC. | 35 | Sets | - | - |
| 4 | Installation of following main switches and changeover switches as per direction of EIC (Main switches and change over switch will be supplied departmentally).
a) 100 Amps. 415 volt TPN (Main switch)
b) 100 Amps. 415 volt (change over switch)
c) 63 Amps. 415 volt (do)
d) 63 Amps. 415 volt TPN (Main switch)
e) 32 Amps. 415 volt TPN (Main switch) | 40 | Nos | - | - |
| 5 | Maintenance of controlling station by engaging skilled labour for operation of the controlling switch from 01.01.2027 to 17.01.2027 as per direction. | 1 | Item | - | - |
| 6 | Drawing the power line from substation to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. Accessories of the temporary Controlling station. | 40 | Nos | - | - |
| 7 | Supply on hire bases 4.88 M long 100 mm. Dia (AV) bottom and 50 mm. Dia (AV) top salbollah post and erecting the same at different places as per direction of EIC including excavation of earth and grouting the post as per I.E. rules average distance from post to post is 18 M. | 1,125 | Nos | - | - |
| 8 | Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.) | 2,100 | Nos | - | - |
| 9 | Providing Rotary signal lamp on hire basis (colour of lamp should be as per choice of the EIC) & to be fixed on 25 ft long salbollah / bamboo post (materials to be supplied by the agency) & making interconnection all complete as per direction of EIC & taken out the same after completion of Mela. From 05.01.2027 to 16.01.2027 i.e 12 days x 40 nos | 480 | Nos | - | - |
| 10 | Fixing of 18W/21W/36W CFL lamp at different places from the different feeder line to mela ground as per direction of EIC with supplying on hire basis 7/20 PVC insulated aluminum wire and plastic flexible wire for looping and all other necessary materials required to complete the work[damaged materials will have to be replaced by the agency at their own cost] as per direction of EIC from 06.01.2027 to 17.01.2027 = 12 days x 2,500 Pts | 30,000 | Pts | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.25 MB
BOQ_5215279.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .