| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC LUDHIANA CANAL CIRCLE LUDHIANA | LUDHIANA | PUNJAB | 141001 | ₹1.8 Cr | 1 | Accepted-AOC LOWEST BID |
| 2 | 2₹1.9 Cr+₹10.7 L (6.01%)Rejected-AOC | ₹1.9 Cr+₹10.7 L (6.01%) | 2 | Rejected-AOC HIGHER BID |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
7 Nov 2023, 5:00 pmClosed
XEN BML CANAL AND GROUND WATER DIV PTA
XEN BML CANAL AND GROUND WATER DIV PTA
Rehabilitation of Khanna Disty Rd 72728-79700 By concrete lining including pucca structure
2023_WR_111486_1
54/23-24
Open Tender
Civil Works - Canal
Item Rate
60 days
LUDHIANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹3.6 L
XEN BML CANAL AND GROUND WATER DIV PTA
20 Feb 2024
24 Oct 2023
8 Nov 2023
24 Oct 2023
7 Nov 2023
24 Oct 2023
2 Nov 2023
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge exceeding 1.5 cumecs but upto 4.5 cumecs
Earthwork Excavation from canal using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m (As per CSR item no. 6.19) (Cutting)
Excavation of soil using hydralic Excavator and hydralic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and Leads (lead=9 km )
Extra for laying earth/fly ash as per specifications for compaction in 20 cm layers and dressing,watering, rolling as per specifications for compaction.
Dressingof new Earth work
Excavating conglomerate for drains and bed sleepers under the lining
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :(a ) 0 to 1.5m depth
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :(b) 1.5m to 3.0m depth
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick- Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Dressing of side slopes and preparation of sub grade for linning complete in all respects as per PWD specification
Dressing of bed and preparation of sub grade for linning complete in all respects as per PWD specification
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Cement concrete lining 100 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15 with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For vertical height upto 2.0 m) (For Lining)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For coping)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Sleeper)
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction Joint with special impervious hot pour 12.5mm wide.
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
providing and fixing distance marks
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Laying Reinforced cement concrete (M-20) in super structure.
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary soil, Manual Means, Depth up to 3 m
Plain/Reinforced cement concrete M25 in sub-structure With Batching Plant, Transit Mixer and Concrete Pump complete as per drawing and Technical Specifications Height up to 5m
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRT&H Specifications
Dismantling of brick work in cement sand mortar / lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
Dismantling of PCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
Cement concrete 1:4:8 with brick balast 40mm guage mixing by mechanical means using concrete mixer volumetric type
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete RCC grade M20 With Batching Plant, Transit Mixer and Concrete Pump in sub-structure complete as per drawing and Technical Specifications height upto 5m
JASWINDER SINGH CHAHAL GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .