Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹35.4 L
EMD Value
₹35,390
Closing Date
5 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Officer, Notified Area, GIDC, Por Ramangamdi
Construction of rigid pavement flooring at plot no. 395-1 of solid waste dumping at GIDC, Por-Ramangamdi industrial estate
270647
11/2025-26
Open
Civil Works
Works
Vadodara
3 documents required · 3 mandatory
₹1,770
Chief Officer, Notified Area Por Ramangamdi
₹35,390
29 Jan 2026
29 Jan 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
Name of work : Construction of rigid pavement flooring at plot no. 395-1 of solid waste
dumping at GIDC, Por-ramangamdi industrial estate.
VOLUME -I: TECHNICAL AND PRICE BID
ONLINE TENDER PAPERS
1 Estimated cost : Rs.
2 Tender fee Basic + 18 % GST : Rs.1,770.00
4 Last date on (or before) which the tender along- : From 29th January 2026 to 05th February
with DD / FDR for Tender fees& EMD (by 2026 up to 18.00 hours
scanning) and other required documents must
upload on the web site of www.nprocure.com &
www.statetenders.gujarat.gov.in
5 Date on (or before) which DD/FDR in original : From 6th February 2026 to 07th February
for Tender fee& EMD and other required 2026 up to 18.00 hours during working days
documents must reach by RPAD/Speed only.
Post/Hand to Hand Delivery in the office of the
Chief Officer Notified Area Authority, Plot No.
136, Near Water tank G.I.D.C. Estate, Por-
Ramangamdi.391243 Phone No. (0265)
6 Pre-Bid Meeting : NA
7 Eligible class of Registered : “E-1 class & above”
OFFICE OF THE CHIEF OFFICER, NOTIFIED AREA, GIDC, POR RAMANGAMDI
Plot No.136, Nr. Water Tank, GIDC ,Por Ramangamdi.Pin -391243
E-Mail:- [email protected]
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Name of work : Construction of rigid pavement flooring at plot.no.395-1of solid waste
dumping at GIDC,Por-ramangamdi industrial estate.
SR.NO. PARTICULAR PAGE NO.
02 TENDER NOTICE 3–6
03 MEMORANDUM OF WORK IN BRIEF 7–9
04 INSTRUCTIONS FOR ONLINE TENDER TO 10 –
05 PRE-QUALIFICATION CRITERIA 12 –
06 INFORMATION & INSTRUCTION TO BIDDER 23 –
07 SPECIAL CONDITION 28 –
08 GENERAL CONDITION 30 –
09 SPECIFICATION OF MATERIALS 33–
10 ITEMWISE DETAILSPECIFICATION 111 –
11 SCHEDULE B 135 –
12 B1 AGREEMENT (Page 1 to 48) Attached Seperately
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(NOT FOR PUBLICATION)
Por-Ramangamdi Notified Area Authority
Office of the Chief Officer
Por-Ramangamdi Industrial Estate
E-TENDER NOTICE NO. 11 OF 2025-26
E-tender for the following works of Notified Area waghodia are publically invited from the intending bidders
registered in appropriate class with state Govt. of Gujarat R&BD / W.R.D / GIDC and other State Governments
equivalent, by the Chief officer Por-Ramangamdi Notified Area Authority, Por-Ramangamdi Industrial
Estate, by E-tendering on web site https://www.nprocure.com, www.statetenders.com
The tenders under are invited percentage (%) above / below - B1 Agreement . The bids will be opened on
schedule date and thereafter on evaluation thereof, the price bid of the pre-qualified bidders, will only opened.
GENERAL DETAILS OF WORKS:
(1) Estimated cost
(2) Earnest Money
Sr. Name of work (3) Non-refundable Class of registration
(Inclusive of 18%
Construction of rigid pavement flooring at (1)Rs. 35,38,917.38 E-1" class and above
1 plot.no.395-1of solid waste dumping at (2) Rs.
GIDC,Por-ramangamdi industrial estate.
(A) SCHEDULE OF E-TENDERING
(i) Downloading of Tender Documents from Web site of From 29th January 2026 to 05th
www.nprocure.com. February 2026 up to 18.00 hours
(The tender document for these work are available only
in Electronic format which Bidder can download at free
SUBMISSION OF TENDER From 29th January 2026 to 05th
(ii) (A) Online submission February 2026 up to 18.00 hours
I) Online submission of bid documents.
II) Scanned copies of DD for tender fee & EMD in
electronic format only through online
a) Other Documents required to be submitted by From 06th February 2026 to 07th
scanning in electronic format only through online February 2026 up to 18.00 hours
1) Required Class of registration during working days only.
2) Valid Bank Solvency and also as per para
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(B) Submission in physical form From 06th February 2026 to 07th
I) D.D. / FDR in original ( for Tender fee & EMD) February 2026 up to 18.00 hours
Other documents mentioned in para C, Sr. No. 5 for during working days only.
the purpose of verification only (in physical form) by
personally i.e. by Speed Post / Currier / Hand
delivery. ( Kindly refer C-1,2 &3)
(iii) Opening of Technical Bid documents. In the Office of Chief Officer
waghodia Notified Area Authority
as under: - Preferably
On dtd. 10th February 2026 at
(B) DETAILS TO BE FURNISHED ALONG WITH APPLICATION:
Interested Bidders can view these tender documents on line, but bidders who are interested in
bidding these tenders can download tender documents from web site as mentioned above and
bidder who wish to submit their offer shall pay non-refundable tender fee in the form of
Account payee Demand Draft payable at Waghodia drawn on any Nationalized / Scheduled
bank in favour of Chief Officer, Notified Area POr-Ramangamdi & EMD in the form of
Account Payee Demand Draft payable at Por-Ramangamdi drawn on any Scheduled /
Nationalized Bank in favour of Chief Officer, Notified Area Por-Ramangamdi.
The intending bidders have to submit the following documents also, along with the tender fee &
EMD (in physical form) by personally i.e., by speed post/currier/hand delivery.
1. Registration certificate of Approved contractor in respective category for the work.
2. Fresh Bank Solvency Certificate (2025-26) (20% value of Estimated cost put to tender)
3. Latest Income Tax Return filed & Pan card details.
4. GST Registration & RPFC Registration certificate.
5. For the purpose of verification, the original documents submitted in electronic format should be
submitted in physical form for the works in the manner set out below by personally i.e. by hand
delivery during office hours.
a) Original tender fee in form of DD and EMD in form of DD/ FDR.
Notified Area Por-Ramangamdi Plot No.136, GIDC Estate,
Near Water Tank, por ramangamdi-391243 ( Ph. 02635-2830145)
Any documents in supporting of tender bid shall be submitted in electronic format only through
online (by Scanning etc.) and hard copy will not be accepted separately.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
1. Intending bidders or their representative who wish to remain present at the time of tender
opening can do so.
2. Tenderer shall submit their offer in electronic format online only, after digitally signing the
3. Offers which are not digitally signed will not be accepted.
4. No Offer in physical form except specified documents will be accepted.
5. Conditional tender shall not be accepted.
6. Scanned copied of DD for tender fee & EMD shall submit in electronic format through online
(by Scanning) while uploading bid.
7. Rules of GIDC as well as committee of Board of Management Notified Area, POr-Ramangamdi
are binding to the tenderer.
8. Tenders without tender fee, Earnest Money Deposit (EMD) and other required documents
specified above which do not fulfill all or any of the condition or submitted incomplete in any
respect will be rejected.
9. The internet site address for e-tendering is http://www.nprocure.com and that corporate web site
is www.nprocure.com. If any clarification / query regarding these tenders is required, do not
hesitate to contact our concern Executive engineers through mobile. Shri D.A.Patel - Chief
Officer, NA Por-Ramangamdi - Mo. 0265-2830145
10. Rates quoted by the agency is excluding of GST will be paid separately
11. Chief Officer, Notified Area, Por-Ramangamdi reserves the rights to reject any or all tenders
without assigning any reason thereof.
Notified Area Por-Ramangamdi
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
માટહતી ખાતાની www.statetenders.comમાાં અને િે ન્ડર
www.nproucre.com ઉપર તા : ૦૫/૦૨/૨૦૨૬ ના ૧૮:૦૦ કલાક સુધી જોવા
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
MEMORANDUM OF WORK IN BRIEF
Name of work: Construction of rigid pavement flooring at plot.no.395-1of solid waste
dumping at GIDC,Por-ramangamdi industrial estate.
VOLUME -I: TECHNICAL AND PRICE.
1) Name of work Construction of rigid pavement flooring at
plot.no.395-1of solid waste dumping at GIDC,Por-
ramangamdi industrial estate.
2) Estimated cost Rs.
3) Joint Venture (J.V) ➢ Joint Venture (J.V) is not allowed.
4) Earnest Money Deposit ➢ Rs. 35,390.00 in the form of DD/FDR for more than
(EMD) 180 days of Nationalized Bank/ Scheduled bank or
. ICICI / HDFC/ IDBI & Axis bank Only. In favor of
" Chief Officer, Notified Area Por-ramangamdi”
5) Validity period of tender offer. 120 days from the stipulated date of receiving of the tender
but no modification shall be allowed after handing over
tender to postal authorities.
6) Security Deposit &
Performance Bond (10%)
(i) In the form of Small Saving Rs. 88,473.00 (2.50%) – Submitted before enter in to
Scheme or Security of Agreement
SardarSarovar Nigam of
minimum 18 (Eighteen) months
(ii) To be deducted from Rs. 88,473.00 (2.50%)
Current R.A. bills.
(iii) Performance Bond of Rs. 1,76,946.00 (5%) – Submitted before enter in to
Nationalized Bank / scheduled Agreement
bank only as B.G. or N.S.C. /
F.D. / S.S.N.N.L. in favour to "
Chief Officer, Notified Area
Waghodia” for validity period of
18 (Eighteen) months which
effect from date of Work order
7) Liquidated Damages As per clause No. 2 of B-1 Form attached herewith.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
8) Defect liability period – Refer The defect liability period shall be One Year from the
modified clause-17A for certified date of completion of work or three monsoon
building work as per R&B whichever is later.
Circlular No. PRCH/102008 /
9) Free Maintenance guarantee 1 (One) Year--Free Maintenance Guarantee with effect
period under clause no.17B of from the certified date of completion.
10) Workers Welfare Cess Under 1% of the value of work done shall be deducted from
the Building & Other the all bills payable to the contractor.
Construction Workers Cess
Act 1996 (Labour Cess)
11) Time limit for completion of 06 (Six) Months
work from the date of written
order to commence.
12) Testing Charges GIDC will deduct 1% of the Estimated Cost from each
Running Account Bill against the testing charges of
13) Submission date & time of
tender documents
i) a) Date on (or before) which From 29th January 2026 to 05th February 2026 up to
the tender with DD / FDR 18.00 hours
for Tender fee & EMD (by
scanning) except required
documents must upload on
the web site of
www.nprocure.com,
www.statetenders.gujarat.gov.in
b) Date on (or before) which From 06th February 2026 to 07th February 2026 up to
DD/FDR in original for 18.00 hours during working days only R.P.A.D or Speed
Tender fee & EMD and Post or Hand Delivery
required documents must reach Physical submission of documents prior to this date will not
in the office of the Office of
the Chief Officer, Notified be considered and bids of the agency will be considered as
Area of GIDC, Plot No. 136, nonresponsive.
Near Water tank, G.I.D.C.
Estate, Por-ramangamdi
(Hand Delivery)
ii) Mode of sending the tender
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
a) The tender with DD / FDR By Online through e – tendering process
for Tender fee & EMD (by
scanning) except required
b) DD/FDR in original for Personally i.e., Hand Delivery to In Office of the Chief
Tender fee & EMD and Officer, Notified Area of GIDC, Plot No. 136, Near
required documents Water tank, G.I.D.C. Estate, Por-ramangamdi
14) Opening of Technical bid Preferably On dtd. 10th February 2026 at 12.00 noon
15) Tender to be opened by In the Office of the Chief Officer, Notified Area of
GIDC, Plot No. 136, Near Water tank, G.I.D.C. Estate,
Por-Ramangamdi-391243.
16) Description essential to be (1) Name of work: Construction of Compound wall
made on sealed cover for around the plot no.136 in por- ramangamdi
documents to be submitted by Industrial Estate under por-ramangamdi notified
personally i.e., Hand area.
(2) Date of receiving the documents
From 06th February 2026 to 07th February 2026 up
17) Important Note: ❖ For any technical discrepancy, the latest version of
MORT&H / IRC shall be applicable.
❖ Prospective bidders are requested to join the site visit.
❖ NAO reserves the right, without any obligation or liability,
to accept or reject any or all the bid at any stage of the
process, to cancel or modify the process or any part thereof
or to vary any of the terms and conditions at any time,
without assigning any reason whatsoever.
❖ Registration required “E1 Class and Above”
❖ GST registration certificate required mandatory
❖ Required Documents mentioned in as under (a), (b), (c)&
(d) are mandatory for submitting scanned copies through
ONLINE. Otherwise, tender offer shall be treated as NON-
RESPONSIVE, without any further intimation.
a) Scanned copy of tender fee and EMD
b) Required Class of registration, Latest Income Tax return
filed, RPFC registration certificate with latest challan,
Service Tax Registration & Pan Card.
c) Fresh Valid Bank Solvency- (20% value of the estimated
cost put to tender)
d) GST registration certificate
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
❖ Submit the required documents online duly named and
page numbered in proper manner for simplicity.
❖ Agencies based in the Vadodara district will be given
first preference during the evaluation process, subject
to meeting all eligibility and qualification criteria.
The agency shall mandatorily possess and operate its own
functional Ready Mix Plant located within a radius of 20 to
km from the project site, along with all necessary equipment
required for the execution of Rigid road works.
1) Site Visit Contact Person:
1. Smt D.A.Patel
Notified Area, Por ramangamdi.
2. Shree C H pathak
AE,NA GIDC,Por ramangamdi
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
INSTRUCTIONS FOR ONLINE TENDER TO BIDDER
1. Down loading of Tender Document :
1.1) Tender documents for downloading will be available on Web site of www.nprocure.com.
1.2) Bidders wishes to participate in this tender will have to register on web site of
www.nprocure.com.
2. Digital Certificate :
2.1) Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate (Class III) as per Information Technology Act - 2000 using
which they can sign their electronic bids. Bidders can procure the same from any of the
license certifying Authority of India or can be contact (n) Code Solution, G.N.F.C. Ltd.,
who are licensed Certifying Authority by the Government of India.
2.2) All bids should be digitally signed, for details regarding Digital signature certificate &
related training involved the below mentioned address should be contacted :
(n) Code Solutions
A Division of G.N.F.C.
301, G.N.F.C. Infotower, Boadkdev, Ahmedabad- 380054 (India)
Note:- Representation of prospective bidders on Delay / Non-submission of ONLINE Offer in
time on account of technical fault or any on the part of service provider – website:
www.nprocure.com shall not be considered.
2.3) Bidders who already have a valid Digital certificate need not procure a new Digital
3. Online Submission of tender with DD / FDR for Tender fee & EMD (by scanning) :
3.1) Bidders can prepare and edit their offers numbers of time before tender submission date &
time. After tender submission date & time, tenderer cannot edit their submitted offer in any
case. No written or online request in this regard shall be granted.
3.2) Tenderer shall submit their offer in Electronic format on above-mentioned web site on or
before submission date & time of online tender shown above after digitally signing the same.
3.3) Scanned copies of DD for tender fee & EMD shall be submit in electronic format through
online (By scanning) while uploading the bid. This submission shall mean that tender fee &
EMD are received.
3.4) Offers submitted without digitally signed will not be accepted.
3.5) Offers in physical form will not be accepted in any case.
3.6) The Bidder shall have to submit unconditional offer without differing from any of the tender
3.7) The BID and all communications in relation to or concerning the Bidding Documents and
the BID shall be in English language.
3.8) Offers submitted without tender fee, EMD & other required documents will not be accepted.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
4. Submission of Tender fee, EMD, (DD/FDR in original) and other required documents by
Personally i.e. Hand Delivery / Speed post / Currier Service:
4.1) Non refundable tender fee of as per Memorandum shall be paid in the form of Account
Payee Demand Draft payable at Bharuch, drawn on any Nationalized Bank in favour of
Chief Officer, Notified Area Waghodia, DD issued after the last date of submission of
tender will not be considered as valid or accepted in any case.
4.2) Earnest Money Deposit (EMD) as mentioned in the Memorandum of work in brief.
4.3) Other required documents as per PQ document.
4.4) The documents received before or after the time specified in the tender notice shall not be
accepted in any case and the bid of that bidder shall be considered non-responsive. All
documents should be submitted without any conditions.
5. Opening of Tender :
5.1) Opening of bid documents will be held on date & time shown above in the office of the
Chief Officer, Notified Area of GIDC, Plot No. 136, Near Water tank, G.I.D.C. Estate,
5.2) Intending bidders or their representative who wish to remain present at the time of tender
opening can do so.
6. General Instructions :
6.1) Tender documents with all schedules & annexure should be digitally signed by the tenderer.
6.2) Offers which are not digitally signed will not be accepted
6.3) No offer in physical form except specified documents will be accepted.
6.4) The tender fee will not be refunded under any circumstances.
6.5) EMD in the form specified in tender document shall only be accepted.
6.6) Tenders without tender fee, Earnest Money Deposit (EMD) and other required documents
specified in tender documents which do not fulfill all or any of the condition or submitted
incomplete in any respect will be rejected.
6.7) Conditional tender shall not be accepted.
6.8) The Internet site address for e-tendering is http:// gidc.nprocure.com. and that corporate web
site is www.nprocure.com.
6.9) GIDC reserves the rights to reject any or all tenders without assigning any reason thereof.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
VOLUME -I: TECHNICAL AND PRICE.
QUALIFICATION CRITERIA FOR PRE - QUALIFICATION
Name of work: Construction of rigid pavement flooring at plot no. 395-1of solid waste
dumping at GIDC,Por-ramangamdi industrial estate.
The pre-qualification application received under this bid shall be assessed and evaluated based on the
qualification criteria and evaluation procedure prescribed hereunder:
(1) Following constitution of Pre-Qualification evaluation committees is inalized.
Sr. Constitution of Committee
1 The pre‐qualification application received under this bid shall be assessed and evaluated based
on the qualification criteria and evaluation procedure prescribed here under. An evaluation of
Pre‐Qualification Application will be placed constitution of Pre-Qualification evaluation
committees is Board of Management of Notified Area GIDC Por-Ramangamdi.
(2) Prequalification criteria for the Civil / Mechanical / Electrical works.
(2.1) Eligibility: E-1 Class & Above
(2.1.1) Bidder’s registration: -
(2.1.1.1) Only those bidders shall bid whose names are borne on the approval list of registered
contractors in the required class & category with Gujarat state R&BD / W.R.D. / GIDC.
(2.1.1.2) If the Contractor’s registration in the required class & category with Gujarat state R&BD
/ W.R.D. / GIDC is expired on or before the last date of online bidding period of the
tender, the bidder must submit through online in electronic form the application for
renewal of the same with the concerned department along with receipt of fees paid for it.
In such cases, the bidder at his own responsibility must produce valid renewed
registration certificate in the required class & category with Gujarat state R&BD /
W.R.D. / GIDC before the date of opening of Technical Bid. Failing to which the bidder
shall be disqualified for opening of his price bid. Bidder will solely be responsible for
obtaining the required registration.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(2.1.1.3) In context to above Para (2.1.1.2), it is clarified that the bidder who is having registration
in class & category below than the minimum required class & category and the bidder
has applied for up-gradation in required class and category with Gujarat state R&BD /
W.R.D. / GIDC shall not be considered valid. In such cases the bidder shall not be
considered eligible for bidding.
(2.1.1.4) The bidder, who is registered in appropriate category of C.P.W.D., M.E.S., Railways and
Indian state government, can also bid provided the bidder produce such registration
certificate at the time of bidding and obtain registration in required class & category
from the Gujarat state R&BD / W.R.D. / GIDC before issuing work order. Bidder will
solely be responsible for obtaining the required registration.
Note: - Joint Venture (JV) is not allowed.
(2.2) Successful experience:
(2.2.1) Bidder must have experience of successfully completed similar works during last seven years
ending last day of month previous to one in which applications are invited.
For arriving at update value, final amount of the work, completed in any one financial year
shall be multiplied by the enhancement factor corresponding to that financial year. Following
enhancement factors will be applied to final amount of work, completed in any one financial
year and to bring them to the base year. The current financial year in which bid is invited shall
be considered as the base year.
Year Financial year Enhancement
Base 2025 to 2026
(Year of inviting tender)
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(2.2.2) A work would qualify as similar work only if it meets with definitions given in below
Definition of Similar work :‐
The bidder must have completed at least one PQC work having updated completion cost not less than Rs.
(2.3) Litigation history: -
(2.3.1) The applicant should provide accurate information on litigation and/or arbitration
resulting from contracts completed or under execution by him over the last five
financial years. A consistent history of arbitration awards/judgements against the
applicant or any partner of a joint venture may result in disqualification for proposed
work. If the details of litigation history is hidden by the applicant and later on it
comes to knowledge of the employer the bidder shall be disqualified for the proposed
work and other appropriate action shall be taken against the bidder.
(2.3.2) Information of litigation history in following statement to be submitted, if any other
wise Nil / Not Applicable statement to be submitted.
LITIGATION HISTORY
Name of applicant:
Sr. Name Work Financi Brief Departme Whether Details of Whether
No. of completed al year Detail of nt in awards / Result of Judgemen
Contra or under the opposition judgement arbitration t in favour
ct execution arbitration s is / or in
/ litigation pending Judgemen against
matter or made? t
(Signature of bidder)
(2.4) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance. :-
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
2.4.1 The bidders shall be disqualified for opening of his price bid if he is under blacklist and / or
under ban and /or his registration is under abeyance by any Central / State Government
Department, Board, Corporation, Municipal Corporation, Municipality, Government Local
Bodies, University etc.
2.4.2 The bidder shall have to submit prescribed notarized affidavit on appropriate stamp paper
as under, failing to which the bidder shall be disqualified for opening of his price bid.
Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance.
(To be submitted on stamp paper of appropriate value & duly notarized.)
Name of work: -
______________ in the capacity of _________________Do hereby solemnly affirm and declare as
We are not under blacklist and / or under ban and /or our registration has not been
kept under abeyance by any Central / State Government Department, Board, Corporation,
Municipal Corporation, Municipality, Government Local Bodies, University etc. as on date of
participating for this bid.
Date: - Authorised signatory
(2.5) Machinery / Equipment: -
Bidder shall have to submit a prescribed notarized undertaking on appropriate stamp paper
for deploying machinery/equipment for the work under tender as per below.
Undertaking for deploying Machineries/Equipments/Tools & Plants
(To be submitted on stamp paper of appropriate value & duly notarized.)
(Authority holding the digital key)
Name of Work: - Construction of Compound wall around the plot no.136 in por -
ramangamdi Industrial Estate under por-ramangamdi notified area.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
List of minimum Machineries/ Equipments/ Tools & Plants to be deployed on contract work.
Sr. Type of Equipment Minimum No. of equipment
1 Ready mix Concrete
3 Needle Vibrator
4 Concrete Pump
I/We hereby undertake that if I/we awarded the above said work then i/we shall deploy all
Machineries/Equipments/Tools & Plants etc. as shown in the Appendix-B in fully working condition and
utilize the same while execution of the work.
We also undertake that i/we shall deploy other Machineries/Equipments/Tools & Plants etc. over & above
shown in Appendix-B in working condition and utilize the same as per instruction of Engineer-In-Charge.
Failing to above we shall not object any action taken to us within the tender provision. In case of any
dispute, Superintendent Engineer’s decision shall be final.
Date :- Authorised signatory
(2.6) SITE VISIT CERTIFICATE. :-
Before quoted the rate, it is mandatory to carry out a survey of the functioning area of the Notified,
Waghodia and after the survey, it is mandatory to attach a certificate of Site Visit which is provided
by the Notifed after the visit and survey of the area.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
SITE VISIT CERTIFICATE
Hence, the certificate is given. Today, on......../......../2026, With the
President / Vice President Chief officer,
Por-Ramangamdi Industries Association Por-Ramangamdi NOTIFIED AREA
Note: The agency will have to get the signature of the Chief Officer and submit the same
(2.7) bidding in E-tendering: -
Submission of documents must be through e-tendering i.e., electronic form, unless specified in
All of the online submitted documents must be clearly readable, failing to which the same shall be
considered as void.
Bids of those bidders who have submitted all information, statistical details as required in the bid
documents through E-Tendering will only be considered. If the employer desires any clarification,
for verification/clarification, ambiguity of difference found in the documents/statistical details
submitted online (by e-tendering) by the bidder the same shall be furnished within stipulated time
otherwise further processing will be carried out in absence of above and the bidders shall be liable
for any consequence.
No bidder can participate in more than one bid for proposed work. GIDC,
(2.8) The agency shall mandatorily own and operate a functional RMC plant located within a
radius of 20 to 30 km from the project site, along with all necessary equipment required for
the execution of Rigid road works.
Please attach assurance of plant as per condition in Sr. no. 2.8 on letterhead with co-ordinates.
(2.9) Submission of documents: -
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(2.9.1) Following documents/papers shall form part of the bid & must be submitted through online
in electronic form unless specified separately, failing to which the bidder shall be dis-
qualified for opening of his price bid.
(2.9.1.1) D.D. of require tender fee. (To be submitted in electronic form at the time of online submission of
the bid & the same to be submitted in original during prescribed time period for submission of
documents in physical form.)
(2.9.1.2) DD/FDR & BG of required EMD. (To be submitted in electronic form at the time of online
submission of the bid & the same to be submitted in original during prescribed time period for
submission of documents in physical form.)
(2.9.1.3) Copy of valid bank solvency certificate of minimum 20 % amount of the estimated cost put to the
tender of the work. (Bank Solvency certificate issued during current calendar year is considered as
valid up to end of the December of the current calendar year. 31st march of the next calendar
year. In case, where solvency certificate is not obtained in time, the certificate of previous year
will be considered valid up to the end of March of current calendar year. In some certificates date
of validity is stated. In such cases the same stated date is considered for validation instead of end
of December of the current calendar year.)
(2.9.1.4) Copy of relevant required Registration Certificate / Certificates. (In case of renewal, copy of
application & receipt of fee paid.)
(2.9.1.5) Litigation history as per Para (2.3).
(2.9.1.6) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in Abeyance as per Para
(2.9.1.7) Copy of form-3A / Experience certificate issued by employer (Government / Semi Government)
showing all details as required as per Pre-Qualification criteria of successful experience of similar
work and copy of letter of permission given by employer (Government / Semi Government) for
subletting the work, if case may be of.
(2.9.1.8) When employer is not a government, following need also to be furnished.
(2.9.1.8.1) Copy of work order.
(2.9.1.8.2) Copy of agreement.
(2.9.1.8.3) Copy of Form-3A / Experience certificate showing all relevant details issued by employer & certified
by Charted Accountant.
(2.9.1.8.4) Copy of final bill.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(2.9.1.8.5) Copy of TDS certificates.
(2.9.1.8.6) Copy of letter of permission given by employer for subletting the work.
(2.9.1.9) The undertaking for deploying machinery/equipment for the work under tender as per Para (2.5).
(2.9.1.10) SITE VISIT CERTIFICATE for the work under tender as per Para (2.6).
(2.9.2) Following documents/papers shall also form part of the bid, but these documents are not
mandatory to be submitted through online in electronic form. However, the same shall be
submitted in physical form, if not submitted through online in electronic form, within time
period given by authority holding the digital key, failing to which the bidder shall be dis-
qualified for opening of his price bid.
(2.9.2.1) Copy of registration certificate of firm / documents of public limited / private limited /
partnership firm / proprietor firm, whichever is applicable. For example, Partnership Deed,
Certificate of incorporation, Memorandum of association, Article of Association etc.
(2.9.2.2) Copy of Power of Attorney, if any.
(2.9.2.3) Copy of PAN Card.
(2.9.2.4) Copy of latest income tax return certificate. (Note: - latest income tax return certificate means
the income tax return certificate of the last completed financial year for which pre-
determined/extended time period by the Income Tax Department for filing income tax return is
over on or before last date of online submission.
(2.9.2.5) Copy of Goods & Services (G.S.T.) registration certificate.
(2.9.2.6) Copy of RPFC registration certificate.
(2.9.2.7) Copy of RPFC Challan of any of the completed last three months from the month of last date of
online submission of the tender.
Following Undertaking / Declaration to be incorporated on (n) Procure website in such a manner that
without attending this undertaking / declaration the tender cannot be uploaded.
UNDERTAKING / DECLARATRION
“I hereby declare that I have after thoroughly understand the Pre-Qualification criteria /
conditions and the details filed & documents submitted are true and correct to the best of my
knowledge and belief. I shall not have any objection against any action taken by GIDC if any of the
information submitted is found to be incorrect / false.”
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(2.9.3) any information, data, statistics etc. which are not related to bid document will not be considered in
evaluation even through furnished by the applicant.
(2.9.4) In accordance with stipulated of Para (2.8), employer reserves the right to call any
information/documents which is mandatory, essential and critical for the purpose of evaluation. Any
information provided by the applicant after last date of electronic submission will not be considered
in evaluation, unless except the employer has specially asked for any information/document, which is
mandatory, essential and critical for evaluation of PQ document. If required information is not
furnished within stipulated time, proposal will be liable for rejection.
(2.9.5) If any of the information provided by the bidder is found false during scrutiny or at the later stage,
his EMD shall be forfeited and he shall be disqualified for the proposed work. In case when bidder
has furnished exemption certificate in lieu of EMD, an amount equal to EMD shall be appropriated
from his FDR pledged to avail of exemption certificate. If any of the information provided by the
bidder is found false after award of work, the performance security of the bidder shall be forfeited
and the contract shall be terminated.
(2.9.6) accordingly, concerned Pre-Qualification committee shall decide to qualify / dis-qualify the bidder
& circulate / issue minutes of the meeting to concerned for further action.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
SELF EVALUATION (APPENDIX – C)
SELF EVALUATION FORM
Sr. Requirement as per M/s. ……………………………………………………
Component Page No. Remarks
DETAILS FURNISHED BY BIDDER
1 Rs1,770/- by DD D.D. No. and Date
D.D. / F.D.R. No. and Date
2 (B) Rs. by B.G. Name of Bank
(Schedule or B.G. No. and Date
Nationalized Valid up to Date.
Bank Only) Amount in Rs.
20% amount of Name of Bank
Estimated Cost Amount in Rs.
3 i.e. Rs.6.13 Lakh Date of Issue
Valid up to Date.
Registration Name of Department
certificate & “E-1” Class and Valid up to Date.
special category above
Date of Completion
Amount of Work (Rs. Lakh)
Enhancement Factor
Successful Updated Amount (Rs. Lakh)
Name of Department and
Experience of Authority
Similar Work: Private work details
copy of Successful Copy of work order
completion Experience of Copy of agreement
5 work. (Form 3A) Similar Work: As Copy of form 3A
must submit by per Appendix - A Copy of final bill
the bidder. Copy of TDS
(As per Copy of letter of permission
given by employer for
Appendix - A) subletting the work
Date of Completion
Amount of Work (Rs. Lakh)
Enhancement Factor
6 Litigation History (Refer Para 2.3)
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Affidavit regarding Termination / Blacklisting / Rs. 300/-
7 (Refer Para 2.4)
Ban / Registration kept in Abeyance stamp
Machinery/Equipment: Proof of deployment of
9 required minimum machinery / equipment's (Refer Para 2.5)
mentioned in Appendix – B
10 Site Visit Certificate (Refer Para 2.6)
10 Registration certificate / Documents of /public To be furnished whichever is
Limited / Private Limited/ Partnership deed / applicable
Proprietor Firm.
11 Power of Attorney
15 Latest Income tax (A) Year of Income tax Assessment Year
return filed and PAN Return filed
(B) PAN Card No. PAN Card No.
16 Goods and Service GST No. GST No.
Tax (GST) Number Name
(A) R.P.F.C Registration Certificate No.
R.P.F.C Registration
17 certificate & R.P.F.C (B) R.P.F.C Challan of any of the completed last three
Challan months from the month of last date of submission of the
The agency shall mandatorily own and operate a functional RMC plant located
18 within a radius of 20 to 30 km from the project site, along with all necessary
equipment required for the execution of Rigid road works (As per Para no. 2.8)
19 WC Plicy WC Policy No.
20 Truth fullness certificate
21 Other Remarks
Whether Qualified or
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
INFORMATION AND INSTRUCTION FOR BIDDERS
Bids i.e., Price Bid and Technical Bid for the work of Construction of rigid pavement flooring at
plot.no.395-1of solid waste dumping at GIDC,Por-ramangamdi industrial estate.is invited from
Contractors on e-tendering process. The contractors, who wish to bid for this contract, should also apply for
prequalification in the manner set out in this document.
The pricebid will be opened only of those tenderers pre-qualified by the Notified area as having
necessary qualification, suitability to perform the contract satisfactorily and opened Technical Bid
with Prequalification Application will be considered. Technical Bid with Prequalification Application
of dis-qualified bidders will not be considered.
LOCATION OF WORK AND SITE INFORMATION:
The work site is in Notified area, Waghodia of GIDC Por-Ramangamdi.
1. BIDDER'S RESPONSIBILITY
The intending Bidders shall be deemed to have visited the site and familiarized themselves
thoroughly with the site conditions and all other aspects affecting the work under this Contract
before submitting the tender. No claim / extension of time whatsoever shall be entertained on
account of prevailing site conditions.
Interested Bidders may obtain further information at the following address:
1) Chief Officer, Notified Area, Plot No. 136, Near Water tank G.I.D.C. Estate, Por-
2. EARNEST MONEY DEPOSIT (EMD)
EMD is payable in the manner set out in the Form B1.
Demand Draft for E.M.D. shall be submitted in electronic format only through online (by scanning)
while uploading the bid. The submission shall mean that E.M.D. is received for purpose of opening
the bid. Accordingly, offer of those shall be opened whose E.M.D. is received electronically.
However, bidder shall submit the DD in original to Chief Officer, Notified Area, Plot No.
Near Water tank G.I.D.C. Estate, Por-ramangamdi 391243 payable at Por-Ramangamdi As
per the schedule specified in tender notice for submission of document in physical form i.e From
06th February 2026 to 07th February 2026 up to 18.00 hours Only R.P.A.D or Sppeed Post or
Hand Delivery (During office Hour). The submission of document before 06/02/2026 and after
07/02/2026 will not be considered and offer treated as non responsive. Exemption certificate shall
not be acceptable.
Earnest money in specified form @ 1 % of the estimated cost must be sent as mentioned above
preceding electronically. Tenderer may pay earnest money up to Rs. 50,000 in cash or in the form
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
of Crossed Demand Draft or fixed deposit or fixed deposit at-call receipts with a validity period of
not less than 180 days of Nationalized or Scheduled bank or Narmada/Shrinidhi F.D.Rs. drawn in
favour of Chief Officer, Notified Area Waghodia concerned. Earnest money by cheque& Bank
Guarantee shall not be accepted. (vide R & BD G. R. No. TNC/ 1090/(100) (4 )-C, dated 4-11 -
2000). However, in respect of the works estimated to cost above Rs. 50 Lakh, the amount of earnest
money in excess of Rs. 50,000 can be offered by the contractor, at his choice, in the form of Bank
Guarantee of the Scheduled or nationalized Bank only. The Bank Guarantee in such cases will be
furnished in the following form. In such cases also, the amount of earnest money first Rs.
will be paid only in the form of crossed demand drafts or fixed deposit receipts or deposit at call
receipts worth the validity period of not less 180 days of the nationalized or scheduled or Narmada/
If the contractor does not turn up to pay the Security Deposit and execute contract agreement within
specified (or extended) time after intimation to him about acceptance of his offer, the earnest money
paid for this work will be forfeited according to Clause-1 of this tender form tenderer's tender shall
be rejected and then according to aforesaid provision of tender, action to blacklist the Contractor
will be initiated without Delay. (Vide R & B D G.R. No. Misc. - 1097 -90-1091/97 -Z/C dated 04-
10-97 & Parach-102008-5-C-Partfile dated 27-11-08).
Bank Guarantee is permissible only when the estimated cost of work is more than Rs. 50 Lakh.
___________________(hereinafter called the Tenderer) is desirous and preferred to tender for
works in accordance with the terms and conditions of tender for the work of __________ and where
as We, Bank, agree to give the tenderer a guarantee for the Earnest Money.
Therefore, we hereby affirm that we are guarantors on behalf of the Tenderer upto total rupees
figures) and we undertake to pal to Executive Engineer _______________Division____________
Department of Government of Gujarat
________________________________________________upto his first written demand, without
demur, without delay and without the necessity of a previous notice of judicial or administrative
procedures and without the necessity to prove to the Bank the defects or shortcomings or debits of
the contractor any sum within the limit of Rs. ________________________.
We further agree that the Guarantee herein contained, shall remain in full force and effect during
the period that would be taken for the acceptance offender.
However, unless a demand of claim under this guarantee is made on us in writing on or before the
_____________________ (Date to be specified - will not be less than 180 days from the stipulated
date of receiving the tender) we shall be discharged from all liabilities under this guarantee
We undertake not to revoke the guarantee during it currency except with the previous consent of the
Executive Engineer _______ ____________ Division __________________________in writing.
We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Date Signature & Seal of Guarantor __________________________
The Earnest Money submitted in the form of Deposit-At-call receipt shall need minimum validity of
six months from the last date of online submission of tender. Tender not supported with tender fee,
Earnest Money & documents and not submitted in electronic format (by scanning) while uploading
the bid shall be rejected as NON- Responsive. If the tenderer modifies or withdraws his tender, the
Earnest Money (in case of EMD exemption certificate, proportionate amount equivalent to EMD of
a particular tender) shall be forfeited and the tenderer may be disqualified from tendering for future
works under the Government.
The Earnest Money will be returned to the unsuccessful tenderers. The Earnest Money will be
returned to the successful tenderer after he furnishes security deposit and duly enters into the
Within Ten days or within such time as may be decided by the Tender Inviting Authority from date
of receipt of the Letter accepting his tender, the successful tenderer shall furnish the required
security deposit aand attend the office of the Tender Inviting Authority for execution of the contract
documents. If he fails to furnish the security deposit or execute the contract document, his Earnest
Money (in case of EMD exemption certificate equivalent amount there from) shall be forfeited and
action to blacklist the contractor bill be initiated without delay (Vide R & B.D. G. R. No. Misc.
3. SECURITY DEPOSIT (SD) – 10% of Estimated Cost put to tender.
SD is payable in the manner set out in the Technical Bid with Prequalification Application
by the successful tenderer / Bidder.
Initial Security Deposit in the form of small saving or Rs.
Narmada Bond or FDR – 2.5% of the estimated cost.
(Validity period of 18 Months)
To be deducted from R.A. Bill - 2.5% of the estimated Rs.
Performance Bond of scheduled or Nationalize Bank - Rs. 1,76,946.00 (To be paid
5% of the estimated cost. (Validity period of 18th with initial security deposit)
4. PERFORMANCE BOND – 5% OF THE ESTIMATED COST PUT TO
Performance Bond in the form of Bank guarantee of Nationalized Bank is payable in the manner
set out in the Form B-1 from section-2 clause-1 along with initial security deposited by the
successful bidder
Performance Bond of scheduled or Rs. 1,76,946.00 (To be paid with initial
Nationalize Bank - 5% of the estimated security deposit)
cost. (Validity period of 18th Month’s)
5. PROGRAMME OF WORK:
The program of work for this contract is as under.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Online Submission of Bid
Period for Validity of offer Period of completion
120 days from the stipulated
date of receiving of the
From 29th January 2026 to 06 (Six) Month from
tender but no modification
05th February 2026 up to the date of work
shall be allowed after
18:00 Hrs. order
handing over tender to
postal authorities.
The time is essence of the contract. The contractor shall have to ensure progress of the work
proportionately as per Schedule-C of B-1 agreement.
6. SUPERVISION OF WORK:
The quality assurance and quality control in addition to the Engineer-in-charge of the work.
7. FREE MAINTENANCE GUARANTEE PERIOD:
The scope of works also includes One years free maintenance guarantee period from the certified
date of completion of the works as per clause No.7 of B1 agreement.
During this period, the contractor shall be responsible to make good, working condition and remedy
at his own expenses, any defects, which may develop or may be notice for the work carried out by
him or due to reasons attributed to him.
The Engineer-in-charge shall give the contractor a notice in writing about the defects with remedial
measures and the contractor shall make good the same within period specified in the notice. In case of
failure, on the part of the contractor to carry out / comply the instructions of Engineer-in-charge, the
Engineer-in-charge may rectify or remove and re-execute the work at the risk and cost of the
The Engineer-in-charge shall be entitled to appropriate the whole or any part of the amount of (i)
security deposit (ii) Performance Guarantee Bond in the form of B.G. or N.S.C. / F.D / S.S.N.N.L.,
and (iii) Free maintenance guarantee bond in the form of B.G. or N.S.C. / F.D / S.S.N.N.L towards
the expenses, if any incurred by him / Engineer-in-charge for rectification / removal, and re-execution
The contractor shall immediately recoup the amount so spent such that at any given time the security
deposit, Performance Guarantee Bond or N.S.C. / F.D / S.S.N.N.L. and free maintenance guarantee
bond for maintenance guarantee period shall be maintained as laid down in the Special condition of
If contractor fails to recoup the amount of Security deposit, Performance Guarantee Bond or N.S.C. /
F.D / S.S.N.N.L. and free maintenance guarantee bond for maintenance guarantee period, Engineer-
in-charge shall be entitled to recover the amount spent over the above from the amount of security
deposit, Performance Guarantee Bond or N.S.C. / F.D / S.S.N.N.L. and free maintenance guarantee
bond for maintenance guarantee period.
The Corporation reserves the rights to en-cash the Performance Guarantee Bond & Bank Guarantee
or N.S.C. / F.D / S.S.N.N.L., if required.
8. DEFECT LIABLITY PERIOD:
The defect liability period shall be One years from the certified date of completion of work.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
For details, please refer Clause NO. 17A and Clause NO.7 of Form B-1.
9. PRICE VARIATION CLAUSE & STAR RATE FOR CEMENT, STEEL AND BULK BITUMEN:
Not Applicable & Deleted
10. MOBILIZATION ADVANCE:
Not Applicable.
11. PURCHASE OF BITUMEN BY THE AGENCY:
The contractor shall have to purchase the bitumen in Bulk only from only Govt. recognized refinery
& shall have to produce the original purchase bills along with the original gate passes etc. The
bitumen to be brought on site includes all transportation charges, taxes etc. with all lead and lift.
12. POWER SUPPLY / WATER SUPPLY / OTHER UTILITIES:
The Contractor will make his own arrangement at his cost for power supply / water supply and other
utilities required for the execution of work and arrangements for temporary distribution. All the works
will be done as per IEA regulations. The Contractor shall ensure at his cost that all electrical lines,
water supply lines and equipment & all installations are approved by the state electricity inspector
before power can be supplied by State Electricity Board & GIDC for water/ other utilities.
13. CONDITIONS OF CONTRACT:
Successful bidder shall have to enter in to prevailing agreement B-1 with NAA, all the tender
documents including pre-bid meeting minutes, negotiation letter and acceptance letter will form-An
integral part of the contract. All works will confirm to the Indian Standards, specifications for road &
Bridge works of Ministry of Road Transport and Highway or other equivalent standard mentioned in
the contract document as approved by the Engineer-in-charge.
1) Bids of those bidders who have submitted all information, statistical details as required in the
bid documents through E-tendering will only be considered by Competent Authority of BOM
(Board of management)/NAO, G.I.D.C, Por-Ramangamdi.
2) BOM (Board of management)/NAO, G.I.D.C, Por-ramangamdi reserves the rights to reject or
accept any bid, and cancel the prequalification process and reject all bids.
3) The NAO, G.I.D.C, Por-Ramangamdi shall neither be liable for any such actions nor not be
under any obligation to inform the applicant of the grounds for them. The NAO, G.I.D.C, Por-
Ramangamdi decision shall be final and binding.
4) The bidder should have a registered office located within 20 km of the site
Name of Work: Construction of rigid pavement flooring at plot.no.395-1of solid waste dumping
at GIDC,Por-ramangamdi industrial estate.
SPECIAL CONDITIONS
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
a) The amount of EMD to be paid should be in the form of demand draft or FDR for more
than 180 days of Nationalized / Scheduled Banks and ICICI, IDBI, HDFC & Axis Banks
in favour of Chief Officer, Notified Area Por-Ramangamdi.
b) Units registered with Industries Dept. or with NSIC as a Small-Scale Unit shall have also
to pay prescribed tender fees and earnest money deposit. Exemption certificate issued by
Govt. / any other authority for EMD shall not be valid for Notified works.
c) The amount of earnest money deposit to be paid in the form of DD / FDR in favour of
“Chief Officer, Notified Area Por-ramangamdi” should be attached, along with the
tender only, otherwise it will not be accepted. It may be noted that DD / FDR brought
personally at the time of opening, will not be accepted at all.
d) The earnest money deposit of the unsuccessful contractor(s) shall be returned without
interest within reasonable time after final decision on the tenders and after entering into a
contract with the Corporation by the contractor whose tender is accepted.
2) The contractor shall have to furnish Income Tax Clearance certificate before his tender is
accepted and intimate assessment number and ward under which is accessed.
As Per GIDC Circular No. GIDC: ENG: CIR: CE: 594 dtd. 18th July 2007. &GIDC
Circular No. GIDC: ENG: CIR: CE: 808 dtd. 13.12.2007 and Due to Modification /Changes
in the clauses of B1 agreement of R & B department and to match the R&B department tender
agreement, it is decided to adopt the Performa of B1 agreement of R & B Department for
Notified tender works, except for the following clauses: -
i) Clause: 60 and 60/A Price variation clause (Star Rate)
Not Applicable & ...... Deleted......
ii) Clause No 72: Secured Advance to Contractor ......Deleted......
ii) Clause No 73: Advance Payment ......Deleted......
iii) Clause No. 74: Advance against Machineries ...... Deleted......
iv) Clause No 75: Mobilization Advance ...... Deleted......
v) For EMD: - Exemption certificates for EMD issued against standing security by any other
authority shall not be valid for Notified works.
vi) Copies of certificate as regards previous experience, if any, must accompany the tender.
3) SUPERVISION OF WORK:
NAO-G.I.D.C reserves the right to appoint Third Party Inspectors (TPI) for quality assurance and
quality control in addition to the Engineer-in-charge of the work & Quality Control branch of
G.I.D.C. Head Office.
4) There are also chances that some items may not be required to execute / to execute in very less
quantity than tendered quantity, as per finally approved decisions from NAO-GIDC. In this
situation, the bidder shall not have any right to claim anything extra for such items.
5. The contract shall be governed by the law and order of India for the time being in force and
subject to the jurisdiction of total works at Bharuch district.
6. As applicable Income tax deduction shall be made at source at every running bill.
7. As applicable Sales tax deduction shall be made at source at every running bill
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
8. Security Deposit
❖ 10% of the estimated cost put to tender payable in three stages.
❖ 2.5% of the estimated cost put to tender Submitted Initial SD before enter in to
❖ 2.5% of the estimated cost put to tender through running bills
❖ 5.0% of Performance Bond of Nationalized Bank / scheduled bank only submitted
before enter in to Agreement
9) Labour welfare cess shall be applicable as per the latest circular /G.R.
10) Recovery of royalty charges should be applicable as per latest Government policy.
11) Testing charges of material shall be born by agency. The same shall be deducted from the
running account bills of the contractor for testing the quality of materials and
workmanship. However, the agency must establish at site of work, the fully equipped
laboratory for day-to-day testing like gradation, density, cube tests, slum test etc. for
more details please read Clause No 77 of B1 agreement and strictly follow the same.
12) The agency shall mandatorily own and operate a functional RMC plant located within a
radius of 20 to 30 km from the project site, along with all necessary equipment required
for the execution of Rigid Road works.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Name of work: Construction of rigid pavement flooring at plot.no.395-1of solid waste
dumping at GIDC,Por-ramangamdi industrial estate.
GENERAL CONDITIONS
Contractors may please read be carefully
1. LABOUR CONTRACT ACT:
The contractor tendering for the work shall have to obtain licence under the labour contract
(Regulation and Abolitions) Act, 1970 within a week or award of work comply with all the
provision of Act. As licence. Also, they hall provide all the amenities for the amenity I not
provided by the contractor such amenity shall be provided by the Contractor such amenity
shall be provided by the Chief Officer, as principal employer as his representative within the
prescribed time and the expense incurred by the principal employer providing the evenly
shall be recovered by the amount payable by the Contractor. The Contractor shall act in
accordance with the provisions of the act in all respect and shall absolve the principal
employer from any consequence whatsoever. Every principal Employer shall nominate a
representative duly authorized by him to be present at the time of disbursement of wages and
it shall be the duty of such representative to certify the amount paid as wages in such manner
as may be prescribed, shall nominate representative duly authorized by him to be present at
the time of disbursement of wages and it shall be the duly of such representative to certify
the amount paid as wages in such manner as may be prescribed.
In case the Contractor fails to make payment of wages within the prescribed period or makes
short payment. The principal employer shall be liable to make payment of wages in full or
the unpaid balance due as the case may be the contract labour employed by the contractors
and recover the amount so paid from the contractor by deduction from any amount form the
contractor by deduction from any amount payable to the contractor under contract.
The contractor shall provide every facility to the principal employer to maintain registers
and records giving particulars of contract labour employers. The nature of work performed
by the contact labour the contractor labour rate of wages paid to the contact labour and such
other particulars that are prescribed under the provision of said Act.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The contractor shall be responsible for complying with the provisions of the employee's
provident fund and Miscellaneous Act 1992 scheme and modification of the Act from time
The contractor shall get themselves enrolled with Regional Provident Fund Commissioner or
any competent officer appointed under the Act and shall have to get separate code number in
respect of their respective establishment as decided in section-3 of the Employees Provident
Fund Act and shall discharge all the liabilities arising out of aforesaid Act as provided in
pere-36 A of the scheme and other provisions of the Act.
The Engineer-in-charge on receiving a report from the competent inspecting officer under
the said Act shall have the power to deduct from the payment to the contractor any sum
required or estimated to be required for good the loss suffered by the worker or workers by
reasons of non fulfillment of the conditions of the contractor for the benefit of the workers
under the said Act. The contractor shall indemnify GIDC against any payment to be made
and for the observance of the Regulations aforesaid.
3. GENERAL CONDITION:
Tender shall very carefully read through a take Note of following conditions.
1. The successful tender shall have to enter into an agreement, in prescribed "B1" From.
2. The tenderer shall get himself well acquainted with the job requirement, site conditions,
route and alignment etc.
3. Contractor shall make his own agreement for all the necessary tools, plants equipment and
provide for manpower as and when required. No extra payment in any such respect be
payable to contractor.
4. Contractor shall while entering into agreement shall produce the registration certificate of
his establishment with the competent authority of Regional Provident Fund Commissioner
failing which 3% (Three percent) of the bill value due to be paid to Contractor shall be
deducted at source and will be dealt as per Clause 74 of B-1 from.
5. In conformity with prevailing Income-Tax Rules necessary of bill value shall be deducted at
source for which necessary certificate shall be deducted by the Chief Officer.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
6. Contractor shall also provide assistance representative and/or authentic person for the
purpose of inspection and verification of transit damages, defects etc. for the insurance
claims but shall not charge any extra payment against such assistance provided.
7. Security deposit of 10% of contract value will be deposited by contractor as per rules.
8. Tender fees, EMD etc. payable to GIDC, by the tenderer by D.D. of FDR etc. shall be drawn
in favour of Chief Officer, Notified Area Por-ramangamdi. The validity of FDR should
not be less than 180 days.
9. Bank guarantee shall not be accepted in any case.
4. GENERAL SPECIFICATION
1. The entire work shall have to be carried out as per the specification of P.W.D. Hand Book
2. The entire work shall be carried out as per the instructions of the Engineer and to his entire
3. The specifications of the materials shall be followed as per front sheet.
4. No extra payment will be made due to change in design and plans of the structure.
5. The contractor shall have to make his own arrangements for water to be used in the
construction work.
5. FOLLOWING CORRECTIOSN ARE THERE IN B1 AGREEMENT BOOKLET.
CONTRACTORS MAY PLEASE BE READ CAREFULLY.
1. Any sort of correction or erasures in the tender shall not be done by the tender, by applying
white fluid or any other chemical. The tender with correction made in aforesaid manner shall
be outrightly rejected by Corporation.
2. If any corrections erasures or overwriting are required by the tendered before submitting the
tender, all the corrections shall be initialed by the tenderer only before submission of the
tender, otherwise the tender shall be rejected by the corporation.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
SPECIFICATION OF MATERIALS
(1) All materials to be used shall conform to the relevant specifications as per the latest edition of Indian
Standard, unless otherwise stated in the detailed specifications of items of work.
(2) All materials to be used shall be of approved quality & make as per list of approved make attached with the
tender documents
(3) Wherever a reference to any Indian Standard appears in the specification, it shall be taken to mean as a
reference to the latest version of the standard.
(4) The following specifications, standards, and codes are made a part of this specification\Tender document.
Indian Standards : specification for building materials, specification for equipment, method of test, method
of measurement of building works ,code of practice for construction , safety code for demolition of building,
safety code for scaffolds etc. published by the Bureau of Indian Standards
(5) The contractor shall invariably carry out Materials & work Tests as specified in the tender document (B1-
Form) and IS code. However, if the additional tests are required as per the opinion of the Engineer-in-
charge, the same shall also have to be carried out. All such tests shall be got carried out in Government or as
approved laboratories and cost thereof shall be entirely borne by the contractor. No collection of materials
shall be made before it is got approved from the Engineer-in-charge.
(6) Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be
stored in such a manner as to prevent deterioration or intrusion of foreign matter and to ensure the
preservation of their quality and fitness for the work.
(7) Materials, if rejected by the Engineer-in-charge, shall be immediately removed from the site of work. If they
are not removed within twenty four hours of receiving such intimation, Engineer-in-charge shall get the same
removed at contractor’s cost.
The Engineer-in-charge shall dispose off such materials in a manner as he chooses and the contractor shall not entitle
to any compensation for the cost of such materials.
(8) Approval to the samples of various materials given by the Engineer-in-charge will not absolve the contractor
from the responsibility of replacing the defective material brought on site of materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or compensation whatsoever on
account of any such materials being rejected by the Engineer-in-charge.
(9) The contractor shall be responsible for observing the law, rules and regulations imposed under the “Minor
Minerals Act “ and such officer laws and rules prescribed by Government from time to time.
Water shall not be salty or brackish and shall be clean, reasonably clean and free from objectionable quantities of silt
and traces of oil and injurious alkalis, organic matter and other deleterious material which will either weaken the
mortar or concrete or cause efflorescence or attack the steel in RCC container for transport storage and handling of
water shall be clean.
If required by Engineer-in-charge it shall be tested by comparison with detailed water. Comparison shall be made by
means of standard cement, tests, soundness, time of setting and mortar strength as specified in IS- 269-1976. Any
indication of unsoundness, change in time of setting by 30 minutes or more or decrease of more than 10 percent in
strength of mortar, prepared with water sample when compared with the resulted obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.
Water for curing to mortar concrete or masonry should not be too acidic or too alkaline, it shall be free of elements
which significantly affect the hydration reaction or otherwise interfere with the hardening of mortar or concrete
during those produce objectionable stain or other unsightly deposits on concrete or mortar surface. Hard and bitter
shall not be used for curing. Potable water will generally be found suitable for curing of mortar or concrete.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Lime shall be hydraulic lime as per I.S. 712-1973. Necessary tests shall be carried out as per IS- 69332 (Part I to X)
Storage shall comply with I.S. 712-1973. The slacked limes if stored shall be kept in a weather proof and damp-
proof shed with impervious floor and sides be protected it against rain, moisture, weather and extraneous materials
mixing with it. All limits that have been damaged in any way shall be rejected and all rejected materials shall be
removed from site of work.
Field testing shall be done according to I.S. 1624-1974 to show the acceptability of materials.
Cement shall be ordinary Portland cement as per I.S. 269-1975.
The contractor shall take every precaution to store the cement properly. So that it is not spoiled by dampness etc.
Cement required for use shall be fresh as possible and stored on plank raised 15 to 20 cms above the floor and
stacked 30 cms. Away from the wall in suitable closed whether proof godown at the site of work. Cement shall be
stored in such a way to allow the removal and use of cement in chronological order on receipt i.e. first received being
first used. Not more than 15 bags shall be stacked vertically in one pile and maximum width of the piles should not
be more than 3 meters. Any cement which has deteriorated caked or which has been set or partially set shall not be
used. When temporarily stored in open for use it shall be kept on a suitable platform and suitably protected as
Different brands of cement or cement of the same brand from different factories shall be stored in separate groups
and shall not be mixed during use. Cement shall be kept in a store under double locking arrangement. A board
indicating stock and daily transaction or cement shall be kept in each room of the cement store. Daily account of
receipt and use of cement bag shall be maintained by the contractor in the Performa prescribed by the Engineer-in-
The cement shall be measured by one bag for all use in concrete (except otherwise stated) etc. In no case cement
shall be measured by boxes or other means for the volumetric proportion of concrete and mortar. For calculation for
the proportion, the volume of the cement bag shall be taken as 0.0342 cu.m. (1.20 cf) and measuring of size 30 cms x
30x38 cms for concrete works. If weight batch concrete is to be used, the cement shall have to be used as per actual
weight and the contractor shall not be entitled for any compensation for loss in weight due to shifting of bags or on
account of any other reasons.
M-4 White cement :
The whole cement shall conform to IS- 8042-E-1076.
M-5 Coloured cement :
Coloured cement shall be with white or grey Portland cement as specified in the item of the work.
The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of cement used in the
mix. The mixture of pigment and cement shall be properly ground to have a uniform colour and shade. The pigment
shall have such properties to provide for durability under exposure to sunlight and weather. The pigments shall have
the property such that it is neither affected by the cement nor determent to it.
Sand shall be natural and clean, well graded, hard strong durable and gritty partition free from injuries amount of
dust, clay, kankar nodules, or of flaky partition shale alkali, salts, organic matter loam mica or other deleterious
substance shall be got approved from the Engineer-in-charge if sand is covered with dust it shall be washed with
water to make it clean.
(A) The sand to be used in cement mortar for masonry work and first coat of plaster should generally satisfy the
following grading.
I.S. sieve Percentage by weight passing through.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(B) The fineness modules shall not exceed 3.0. Sand to be used in cement mortar for stone slab lining work, pointing
and second coat of plaster may have the grading.
I.S. sieve Percentage by weight passing through.
The fineness modules shall not exceed 1.6.
(C) Sand to be used for concrete work shall of grades as specified in I.S. 383-1970 with fineness modules varying
from 2.6 to 3.6 as per requirement.
The sand shall be stacked carefully on a clean hand surface. Sand of approved quality shall be obtained from
approved sources and will be allowed to be used for work.
M-7 Stone Dust :
This shall be obtained from crushing hard black trap stone. It shall not contain more than 8% of silt determined be
field test with measuring cylinder. The method of determining silt content by field is given as under.
A sample of stone dust to be tested shall be placed without drying in 200 mm measuring cylinder. The quantity of the
sample shall be such that it fills the cylinder up to 100mm mark. The clean water shall be added up to 150mm mark.
The mixture shall be stirred vigorously and the content allowed settling for 3 hours.
The height of silt visible as settled layer above the stone dust shall be expressed as percentage of height of the stone
dust below. The stone dust containing more than 8% silt shall be washed so as to bring the silt content within the
allowable limit.
The fineness modules of stone dust shall not be less than 1.80.
M-8 Black Trap Grit :
Grit shall consist of crushed or broken stone and be hard, strong dense, durable clean of proper gradation and free
from skin or coating likely to prevent proper adhesion of Mortar Grit shall generally be cubical in shale and as far as
possible flaky elongated pieces shall be avoided. It shall generally comply with the provision of IS – 383-1970.
Unless special stone of particular quarries are mentioned, aggregate shall be broken from the best black trap stone as
approved by the Engineer-in-charge. Stones shall have no deleterious reaction with cement.
The grit shall conform to the following gradation as per sieve analysis.
I.S. sieve designation Percentage passing for sieve.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The crushing strength of grit shall be such as to allow the concrete in which to be used to built up the specified
strength of concrete.
The necessary test for grit shall be carried out as per the requirement of I.S.- 2386-Part-I to VIII of 1993 or as revised
from time to time as per instruction of the Engineer-in-charge.
M-9 Cement Mortar :
Cement : Cement shall conform to specification M-3
Water: Water shall conform to specification M-1
Sand: Sand shall conform to specification M-6.
Proportion of mix :
Cement and sand shall be mixed to specified proportion. Sand being measured by measuring boxes. The proportion of
cement will be by volume on the basis of 50 kg/bag of cement being equal to 35 liters or 0.0342 M3. The mortar may
be hand mixed or machine mixed as directed by the Engineer-in-charge.
Preparation of mortar:
In hand mixed mortar, cement and sand in the specified proportion shall be thoroughly mixed dry on a clean
impervious platform by turning over at least 3 times of more till a homogeneous mixture of uniform colour is
obtained. Mixing platform shall be so arranged that no deleterious, extraneous material shall be get mixed with mortar
or mortar shall flow out, while mixing the water shall be gradually added and thoroughly mixed to form a stiff plastic
mass of uniform colour so that each particle of sand shall be completely covered with a film of wet cement. The water
cement ratio may be adopted as directed by the Engineer-in-charge.
The mortar so prepared shall be used within 30 minutes of adding water; only such quality of mortar shall be prepared
as can be used within 30 minutes. The mortar remaining unused after that period or mortar which has partially
hardened or damaged shall not be re-tempered or remixed. It shall be destroyed or thrown away.
M-10 Black trap stone coarse aggregate for plain and ordinary reinforced concrete.
Coarse aggregate shall be of machine crushed stone of black trap and be hard strong, dense, durable, clean and free in
skin and coating likely to prevent proper adhesion of mortar. The aggregate shall generally be cubical in shape.
Unless special stones or particular quarries are mentioned, aggregates shall be machine crushed from the best black
strap stone as approved by the Engineer-in-charge. Aggregate shall leave no deleterious reaction with cement. The
size of the coarse aggregate for plain cement concrete and ordinary reinforced cement concrete shall generally be as
per the table given below. However, in case of reinforced cement concrete the maximum limit may be restricted to
mm less than the minimum lateral clear distance between bars or 6mm less than the cover which is smaller.
L.S. sieve designation. Percentage Passing for single of Size 16mm
aggregates 40 mm nominal size 20 mm
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
This percentage may be varied some what by the Engineer-in-charge when considered necessary for obtaining better
density and strength of concrete.
Single size coarse aggregates conforming to the requirements in Table No. 1 above or following nominal size shall be
used at site with the other ingredients of concrete as indicated below. The mixing shall be in a mixture or on the
platform as directed in case of CC 1:5:10 only. For CC 1:4:8, CC 1:3:6, CC 1:2:4 and CC 1:1 1/2:3 mixing with the
other ingredient of concrete shall be done in the mixture only except for small works.
(1) CC 1:5:10 - Nominal size of aggregate 40 mm
(2) CC 1:3:6 - Nominal size of aggregate 20 / 40 mm
(3) CC 1:4:8 - Nominal size of aggregate 40 mm
(4) CC 1:2:4 - Nominal size of aggregate 20 mm
(5) CC 1:1 :3- Nominal size of aggregate 20 mm
The grading test shall be taken in the beginning and at the change at the source of materials. The necessary test
indicated in IS 383-1970 and 456-1978 shall have to be carried out to ensure the acceptability. The aggregates shall
be stored separately and handled in such a manner to prevent the inter mixing of different aggregates. If the
aggregates are covered with the dust, it shall be washed with water to make it clean. The coarse aggregates for plain
and reinforced concrete shall be measured by volume in the steel or wooden boxes prepared as per the direction of the
Engineer-in-charge.
M-11 Black trap stone coarse aggregates for controlled reinforced concrete:
Coarse aggregate shall be of machine crushed stone of black trap and be hard, strong, dense, durable, clean and free
from skin and coating likely to prevent proper adhesion mortar.
The aggregates shall generally be cubical in shape. Unless special stones of particular quarries are mentioned,
aggregate shall be machine crushed from the best, black trap stone as approved by the Engineer-in-charge. Aggregate
shall have no deleterious reaction with cement.
In proportion concrete, the quantity of coarse aggregate shall be determined by weight only. The grading of coarse
aggregate shall be controlled by obtaining the aggregate in different size and blending them in the right proportions as
per concrete mix design approved by the Engineer-in-charge. The different sizes shall be stocked in separate stock
piles. The grading of aggregates shall be checked as frequently as possible. The frequency for verification of the
grading shall be as directed by the Engineer-in-charge to ensure that the grading as maintained uniform with that of
the samples used in the preliminary tests.
The necessary test indicated in I.S. 383-1976 and I.S. 456-1978 shall have to be carried out to ensure the acceptability
of the material.
If aggregate is covered with dust, it shall be washed with water to make it clean.
M-12 Brick Bats Aggregate :
Brick aggregates shall be broken from well burnt to slightly over burnt and dense bricks. It shall be homogeneous in
texture, roughly cubical in shape, clean and free from dirt of any other foreign material. The brick bats shall be of
40mm to 50mm unless otherwise specified in the item. The under burnt to over burnt brick bats shall not be allowed.
M-13 Bricks / flyash building brick :
(A) First class Bricks :
The bricks shall be hand or machine moulded and made from suitable soils and klin burnt. They shall be free from
cracks and flows modules of free time. They shall have smooth rectangular faces with sharp corners and shall be of
uniform colour. The bricks shall be moulded with a frog of 100mm x 40 mm and 10mm to 20 mm deep on one of the
flat sides. The bricks shall not break when thrown on the ground from a height of 600 mm.
The size of modular bricks shall be 190mmx90mm x 90mm and shall conform to IS 1077-1976 in respect of tolerance
for sub-class “A” bricks.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The crushing strength of the bricks shall not be less than 35 kg / sq.cm. The average water absorption shall not be
more than 20 percent by weight. Necessary tests for crushing strength and water absorption shall be carried out as
directed by the Engineer-in-charge.
(B) Second class bricks:
The second class bricks shall be similar to first class bricks except that they may be permitted to have slight distorted
and rounded edges provided no difficulty shall arise on this account in laying of uniform courses.
M-14 Mild Steel Bars :
Mild steel bars reinforcement for RCC work shall conform to I.S. 432 1966 and of tested quality. It shall also comply
with relevant part of IS 456-1978.
All reinforcement shall be cleaned and free from dirt, oil, paint, grease, mill’s make or loose or thick rust at the time
Reinforcement steel shall be stored such as to avoid distortion and sogs of long length and shall be protected as far as
possible from surface deterioration. All bars of the same designation shall be stacked separately as far as possible and
distinctly marked. For the purpose of payment the bar shall be measured correct up to 10mm length and weight
payable worked out at the rate specified below.
1 6 mm 0.22 kg / Rmt
2 8 mm 0.39 kg / Rmt
3 10 mm 0.62 kg / Rmt
4 12 mm 0.89 kg / Rmt
5 14 mm 1.21 kg / Rmt
6 16 mm 1.58 kg / Rmt
7 18 mm 2.00 kg / Rmt
8 20 mm 2.47 kg / Rmt
9 22 mm 2.98 kg / Rmt
10 25 mm 3.85 kg / Rmt
11 28 mm 4.83 kg / Rmt
12 32 mm 6.31 kg / Rmt
13 36 mm 7.99 kg / Rmt
14 40 mm 9.86 kg / Rmt
M-15 High Yield Strength Steel Deformed Bars/TMT/CRS :
High yield strength steel deformed bars shall be either cold twisted or hot rolled and shall conform to IS 1786-1979
& I.S. 1139-1966 respectively or as revised from time to time.
T.M.T. shall conform to IS 1789-FE415 or as revised from time to time. Approved make for TMT bar shall be Tata,
Shah Alloys, Malhotra, Rajury, Sirhind, Thermax
Corrosion Resistance Steel shall conform to relevant IS code or as revised from time to time.
Other provisions and requirements shall conform to specification No. M -14 for Mild steel bars.
M-16 Mild Steel Binding Wire :
The mild steel wire shall be of 1.63mm or 1.22mm (16 or 18 gauge) diameter and shall conform to IS 280-1978 or as
revised from time to time.
The use of black wire will be permitted for binding reinforcement bars. It shall be free from dust, oil paint, grease,
loose mill scale or any other undesirable coating which may prevent adhesion of cement mortar.
Storage: The wire coils shall be stored such as to avoid deterioration.
Measurement: No measurement will be taken of the wire used for tying reinforcement bars. The rate for
reinforcement steel and its fabrication shall include the cost of binding wire.
M-17 Structural Steel :
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
All structural steel shall conform to I.S.226-1975 & I.S. 800-1962 or as revised from time to time. The steel shall be
free from defects mentioned in I.S. 226-1975 and shall have smooth finish. The material shall be free from loose mill
scale, rust pits or other defects affecting the strength and durability Rivet bars shall conform to I.S. 1148-1973.
Structural steel shall be stored such as to avoid distortion of section of long length and shall be protected as far as
practicable from surface deterioration. It should be so stored and handled that material will not be subject to
excessive stress and damages. All deformed structural material will be properly straightened by methods which are
not injurious prior or being aid off, punched or otherwise worked in the shop. Sharp kinks and bends shall be caused
When the steel is supplied by the contractor test certificate of the manufacturers shall be produced, if so required by
the Engineer-in- charge. If further test be necessary, they will be done according to I.S. 226-1975 & I.S. 223-1950 or
as revised from time to time.
M-18 Shuttering :
The shuttering shall be either of wooden planking of 30mm minimum thickness with or without steel sheet lining or
of steel plates stiffened by steel angles. The shuttering shall be supported on battens and beams and props of vertical
bellies properly cross braced together so as to make the form work rigid.
The form work shall be sufficiently strong and shall have camber, so that it assumes correct shape after deposition of
the concrete and shall be able to resist forces caused by vibration of live load of men working over it and other
incidental loads associated with it. The shuttering shall have smooth and even surface and its joints shall not permit
leakage of cement grout.
If at any stage of work during or after placing concrete in the structure, the forms work sags or budges out beyond the
required shape of the structure, the concrete shall be removed and work redone with fresh concrete and adequate rigid
form work. The complete form shall be got inspected by and approved from the Engineer-in-charge before the
reinforcement bars are placed in position.
If wooden props are used, the props shall consist of bellies having 100mm minimum diameter measured at mid
length and 80mm at thin end and shall be placed at 1 to 1.20 m. spacing. These shall rest squarely on wooden sole
plates 10 mm thick and minimum bearing area of 0.10 sq.m. laid on sufficiently hard base.
Double wedges shall further be provided between the sole plate and the wooden props so as to facilitate tightening
and casing of shuttering without jarring the concrete.
The timber used in shuttering shall not be so dry as to absorb water from concrete and swell budge nor so green or
wet as to shrink after erection. The limber shall be properly swan and planned on the sides and the surface coming in
contact with concrete. Wooden from work with metal sheet lining or steel plates stiffened by steel shall be permitted.
As far as practicable clamp shall be used to hold the forms together and use of nails and spikes avoided.
The surface of timber shuttering that would come in contact with concrete shall be well wetted and coated with soap
solution before the concreting is done. Alternatively coat of soap solution or raw linseed oil of approved
manufacturer may be applied in place of soap solution or raw linseed oil shall be applied after thoroughly cleaning
The shuttering for beams and slabs shall have camber of 4 mm per meter (1 in 250) or as directed by the Engineer-in-
charge so as to offset the subsequent deflection. For cantilever the camber at free end shall be 1/50 of the projected
length or as directed by the Engineer-in-charge.
The period that shall elapse after concrete has been laid before easing and removal of centering and shuttering as
under taken shall be as follows :
Part of structure Period
1 Sides of foundation, columns beams & walls. 34 to 48 hours
2 Undersides of slabs up to 4.5 m span 7 days.
3 -do- above 4.5 m add under side of beams and arches up 14 days.
4 -do- above 6 m. span and up to 9 m span. 21 days
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
5 Undersides of beams and arches over 9 m span 28 days
6 Domes: Shall & other structure of special nature. As per instruction.
Work damaged through premature or careless removal of forms shall be reconstructed. The period for striking the
form work shall be 1.5 times more in case of Pozzolona cement if used then that of the ordinary Port land cement and
the contractor shall not entitle for any extra claim for the same.
M-19 Expansion Joints, Pre-moulded Filler :
The item provides for expansion joints in R.C.C. frame structure for internal joints, as well as for exposed joints with
the use of pre-moulded bituminous joint filler.
Pre-moulded bituminous joint filler i.e. pre-formed strip of expansion joints filler shall not be deformed or broken by
twisting bending or other handling when exposed to atmospheric condition. Pieces of joint filler that have been
damaged shall be rejected.
Thickness of the pre-moulded joint filler shall be 25mm unless otherwise specified pre-moulded bituminous joints
filler shall conform to I.S. 1938-1961 or as revised from time to time.
M-20 Expansion Joints – Copper Strip & Holdfast :
The item provides for expansion joints in R.C.C. frame structure for internal joints as well as for exposed joints with
the use of necessary copper strip and hold fasts. Copper sheet shall be of 125 mm thick and 125mm or required width
with the “U” shape in the middle. Copper strip shall hold fast of 3mm diameter copper rod fixed to the plaster
shoulders on strip at intervals of about 30 or as shown in the drawing or as directed by the Engineer-in-charge. The
width of each flange (horizontal side) of the copper plate to be embedded in the concrete work shall be 25mm depth
of “U” to be provided in the expansion joint in the copper plate shall be of 25mm.
M-21 Teak Wood :
The teak wood shall be of good quality as required for the item to be executed when the kind of wood is not specially
mentioned good Indian Teak Wood as approved by the Engineer-in-charge shall be used.
Teak wood shall generally free from large, loose, dead or cluster knots, flows, shakes, wraps twists bends or any other
defects it shall generally be uniform in sub-stance and of straight fibers as far as possible. It shall be free from root,
decay, harmful fungi and other damages of harmful nature which will affect the strength durability or its usefulness
for the purpose for which it is required. The colour shall be uniform as far as possible. Any effort like painting using
and adhesive or resinous materials, made to hide the defects shall render the pieces liable to rejection by the Engineer-
All scantlings, planks etc. shall be swept in straight lines and planes in the direction of grains and of uniform
The tolerance in the dimensions shall be allowed at the rate of 1.5mm per face to be planned.
All glass shall be of the best quality, free from specks, bubbles, smokes, veins, air holes, blisters and other defects.
The kind of glass to be used shall be as mentioned in the item of specification or in the special provisions or as shown
in detailed drawings. Thickness of glass panels shall be uniform. The specification of different kind of glass shall be
In absence of any specified thickness or weight in the item of detailed specifications of the item of work sheet glass
shall be weighing 7.5 kg/ sq.m. up to 600mm x 600mm.
For panes larger than 600mmx600mm up to 800mmx800mm the glass weighting not less than 8.75 kg /sq.m. shall be
used. For bigger panes up to 900mmx900mm glass weighting less than 11.25 kg/ sq.m. shall be used.
Sheet glass shall be patent Battened glass of best quality and for glazing and framing purposes shall conform to IS –
2835-1977. Sheet glass of the specified colour shall be used, if shown on detailed drawings or so specified. For
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
important buildings and for panes with any dimensions 900 plate glass of specified thickness shall be used.
When plate glass is specified, it shall be “Polished Patent Plate Glass” of best quality. It shall have both the surface
ground flat and parallel and polishedto obtain clear undisturbed vision and reflection. The plate glass shall be of the
thickness mentioned in the item or as shown in the details drawing or as specified. In absence of any specified
thickness, the thickness of plate glass to be supplied shall be 6mm and to tolerance of 0.55 to 0.88 mm shall be
Obscured Glass:
This type of glass transmits lights so that vision is partially or almost completely, obscured. Glass shall be plain rolled
or double rolled, figured, ribbed or fluted, or frosted glass as may be specified or required, the thickness and types of
glass shall be as detailed on drawings or as specified or as directed by the Engineer-in-charge.
Glass shall be with wire netting embedded in a sheet or plate glass electrically, welded 13mm. Georgian square mesh
shall be used. Thickness of glass shall not be less than 6 mm wired glass shall be of type and thickness specified.
M-23 Fixtures & Fastenings :
The fixtures and fastenings that is but things, tee and strap hinges, sliding door bolts, tower bolts, door latch,
bathroom latch, handles, door stoppers, casement window fasteners, casement stays and ventilators catch shall be
made of the metal as specified in the item or its specifications.
They shall be of iron, brass, aluminum chromium plated iron, chromium plated brass, copper, oxidized iron, copper
brass or anodized mat aluminum, stainless steel matt as specified.
The fixtures shall be approved make as per list of approved make attached with the tender document. The fixtures and
fastenings shall be smooth finished and shall be such as will ensure case of operations.
The sample of fixtures and fastenings shall be got approved as regards quality and shape before providing them in
Their size shall conform to those prescribed in C-12. In respect of other dimensions not specified they shall conform
to relevant I.S.
Hold fast shall be made from mild steel flat 50mm length at one end of the hold fast shall be bent at right angle and
two Nos. of 6mm diameter holds shall be made in it for fixing it to the frame with screws. At the other end, the hold
fast shall be forked and bent at right angles in opposite direction.
Medium type iron butt hinges shall be specified.
Tee and strap hinges shall be manufactured from M.S. sheet as specified in the item.
Sliding Door Bolts (Aldrops )
In case of single leaf door, where iron socket plate or brass or aluminum fixing bolts (for sliding door bolt) cannot be
fixed, a hole of suitable size shall be drilled in the door frame and a counter sunk plate not less than 1.5mm thick cut
to shape shall be fixed at the face of the holes.
Tower Bolts (Barrel Type)
Mild steel door bolts shall be made in one piece. Knobs of tower bolts shall be cast and knob fixed in the bolt.
The size of the door latch shall be taken as the length of latch.
Bathroom Latch:
Bathroom latch shall be similar to tower bolt. The size of the handles shall be determined by the inside grip length of
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Door stopper shall be either floor door stopper type or door catch type. Floor door stopper shall be of overall size as
specified and shall have a rubber cushion.
Door catch shall be fixed at a height of about 900 mm from the floor level such that one part of catch is fitted on the
inside of the shutter and the other part is fixed in the wall with necessary wooden plug arrangements for appropriate
fixity. The catch shall be fixed 20mm inside the face of the door for easy operation of catch.
Casement window fastener:
Casement window fastener for single leaf window shutter shall be left or right hand as directed.
Casement stays (straight peg stay):
The stays shall be made from a channel section having three holes at appropriate position so that the window can be
opened either fully or partially as directed.
The base socket plate shall be made from minimum 3 mm thick plate, and protected pivot shall not be less than
mm diameter and 12mm length and shall be firmly riveted to the base plate in case of iron pivot. Size of the stay shall
be 250mm, 800mm as directed.
(A) Oil Paints :
Oil paints shall be of the specified colour and shade, and approved by the Engineer-in-charge. The ready mixed paints
shall be used. However, if it ready mixed plaint of specified shade or tint is not available white ready mixed paint
with approved strainer shall be allowed in such a case, the contractor shall ensure that the shade of the paints so
allowed be uniform.
All the paints shall meet with the following general requirement:
i) Paints shall not show excessive setting in a freshly opened full cane and shall easily be redispersed
with a paddle to a smooth homogeneous state. The paint shall show no curding, levering, cracking or
colour separation and shall be free from lumps and skins.
ii) The paint as received shall brush easily possesses good leveling properties and show no running or
sagging tendencies.
iii) The paint shall not skin within 48 hours in a three quarters filled closed container.
iv) The paint shall dry to smooth uniform finish free from roughness, grit, unevenness and other
Ready mixed paint shall be used exactly as received from the manufacturers and generally according to their
instructions and without any admixtures whatsoever.
(B) Enamel Paints:
The enamel paint shall satisfy in general requirements as mentioned in specification of oil paints.
Enamel paint shall conform to IS 2933-1975 or as revised from time to time.
M-25 French Polish :
The French polish of required tint and shade shall be prepared with the below mentioned ingredients and other
necessary materials.
i) Denatured spirit
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The French polish so prepared shall conform to I.S. 348-1968 or as revised from time to time.
M-26 Marble Chips for Marble Mosaic Terrazzo :
The marble chips shall be Makrana white or Chittor pink, yellow, green and black , Jaisalmer yellow, Baroda green,
Deheradun white, grey (surat) and Alwar black or as specified. It shall be hard, sound, dense and homogeneous in
texture with crystalline and coarse grains. It shall be uniform in colour and free from stains cracks, decay and
The size of various colours of marble chips ranging from the smallest up to 20mm shall be used where the thickness
of top wearing layer is 6mm size. The marble chips of approved quality and colours only as per grading as decided by
the Engineer-in-charge shall be used for Marble Mosaic Tiles or works.
The marble chips shall be machine crushed. They shall be free from Foreign matters, dust, etc. Except as above the
chips shall conform to I.S. 2114-1962 or as revised from time to time.
M-27 Flooring Tiles :
(a) Plain Cement Tiles:
The plain cement tiles shall be of general purpose type. These are the tiles in the manufacture of which no pigments
The tiles shall be manufactured from a mixture of cement and natural aggregates by pressure process. During
manufacture tiles shall be subjected to a proportion of not less than 140 kg / sq.mt. The proportion of cement to
aggregate in the backing of the tiles shall be not less than 1:3 by weight. The wearing face through the tiles are of
plain cement shall be provided with stone aggregates on 1 to 2 mm size. The proportion of cement to be aggregate in
wearing layer of the tiles shall be three parts of cement to one part of chips by weight. The minimum thickness of
wearing layer shall be 3 mm. The colour and texture of wearing layer shall be uniform through out its face and
thickness. On removal from mould, the tiles shall be kept in moist condition continuously at least for seven days and
subsequently if necessary, for such period that would ensure their conformity to requirements of I.S. 1237-1980
regarding resistance to wear and water absorption.
The wearing face of the tiles shall be plane, free from projections, depressions and cracks and shall be reasonably
parallel to the back face of the tiles. All angles shall be right angles and all edges shall be sharp and true.
The size of tiles shall generally be squared shape size 24.85 cm x 24.85 cm or 25 cm x 25 cm. The thickness of tiles
shall be 20 mm.
Tolerance on length and breadth shall be plus or minus one millimeter. Tolerance on thickness shall be plus 5 mm.
The tiles shall satisfy the test as regards transverse strength, resistance to wear and water absorption as per I.S. 1237-
1980. Necessary tests shall be got carried out by the contractor.
(B) Plain Coloured Tiles :
These tiles shall have same specification as per plain cement tiles as per (A) above except that they shall have a plain
wearing surface wherein pigments are used. They shall conform to IS 1237-1980.
The pigment used for colouring cement shall not exceed 10 percent by weight of cement used in the mix. The
pigments, synthetics or otherwise used for colouring tiles shall have permanent colour and shall not contain materials
detrimental to concrete.
The colour of the tiles shall be as specified in the item or directed by the Engineer-in-charge.
(C) Marble Mosaic Tiles / Terrazzo tiles :
These tiles shall have the same specifications as per plain cement tiles except that requirements as stated below:
The pigment incorporated in terrazzo shall be of permanent colour and shall conform to requirement mentioned in
Appendix-A in I.S. 2114-1962. The marble powder shall passed through I.S. sieve Terrazzo-30. Marble chips shall
conform to M-26.
The marble mosaic tiles shall conform to I.S. 1237-1980. The wearing face of the tiles shall be mechanically ground
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
and filled. The wearing fact of tiles shall be free from projection, depressions, and cracks and shall be reasonably
parallel to the back face of the tiles. All angles shall be right angel and all edges shall be sharp and true.
Chip used in the tiles shall be up to 6mm sizes. The minimum thickness of wearing layer of tiles shall be 6 mm. For
pattern of chips to be had on the wearing face, few samples (with or without their full size photographs as directed by
the Engineer-in-charge) shall be presented to the Engineer-in-charge for approval.
Any particular samples, if found suitable shall be approved by the Engineer-in-charge or he may ask for few more
samples to be prepared indicating roughly the particular sized chips to be more or less in the sample presented. The
sample shall have to be made by the contractor till a suitable sample is finally approved for use in the work. The
contractor shall ensure that the supplied for the work shall be in conformity with the approved sample only tiles in
item of its dimensions thickness of backing layer and wearing surface material ingredients, colour, shade chips
distribution etc. required.
The tiles shall be prepared from cement conforming to I.S. or coloured Portland cement generally depending upon the
colour of tiles to be used or as directed.
M-28 Rough Kotah Stone :
(A) Kotah Stones :
The kotah stones shall be hard, even, sound and regular in shape and generally uniform in colour. The colour of the
stone shall generally be Green. Brown or yellow coloured, stones shall not be allowed for use. They shall be without
any soft veins, cracks or flows.
The sizes of the stones to be used for flooring shall be of size not less than 600mm x 450mm as directed. However,
smaller sizes will be allowed to be used to the extent of maintaining required pattern. Thickness shall be as specified.
(B) Polished Kotah Stones :
Polished kotah stone shall have the same specification as per rough kotah stone as per (A) above except as mentioned
The stone shall have machine polished smooth surface. When brought on side, the stone shall be single or double
polished depend upon the its use or as described in the item of Schedule “B”. The stone for flooring shall generally be
single polish. The stone to be used for dedo, skirting, platform, stair case steps etc. shall be double polished&all
exposed edges rounded.
M-29 Dholpur Stone Slab :
Dholpur stone slab shall be for best quality as approved by the Engineer-in-charge. The stone slab shall be without
any veins, cracks and flaws. The stone slab shall be even, sound and durable, regular in shape and of uniform colour.
The size of the stone shall be as specified in the item or detailed drawing or as approved by the Engineer-in-charge.
The thickness of the stone shall be as specified in the item of work with the permissible tolerance of plus or minus
2mm. The provisions in respect of polishing as per M-29 (B) of polished kotah stone shall apply to polished Dholpur
stone also. All angles and edges of the face of the stone slab shall be file chiseled or polished as specified in the item
of work and all the four edges shall be machine cut. All angles and edges of the stone slab shall be true square cut and
free from chippings and surface shall be true and plane.
The sample of stone shall be got approved from the Engineer-in- charge for shade and tint for a particular work. It
shall be ensured that the stones to be used in a particular work and shall not differ much in shade or tint from the
approved sample.
M-30 Marble Slab :
Marble slabs shall be white or of another colour and of best quality as approved by the Engineer-in-charge.
Slab shall be hard, close, uniform and homogeneous in texture. They shall have even crystalline grain and free from
defects and cracks. The surface shall be machine polished to an even and perfectly plane surface and edges machine
cut true and square. The rear face shall be rough enough to provide key for the mortar.
Marble slabs with natural veins. If selected have to be laid as per the pattern given by the Engineer-in-charge. Size of
slab shall be minimum 450mm x 450mm preferably 600mm x 600 mm. However, smaller size will be allowed to be
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
used to the extent of maintaining required pattern.
The slab shall not be thinner than the specified thickness at its thinnest part. A few specimen of finished slab to be
used shall be deposited by the contractor in the office for reference.
Except as above, the marble slab shall conform to IS 1130-1969 or as revised from time to time.
M-31 Granite Stone Slab :
Granite shall be of approved colour and quality. The stone shall be hard sound, durable, resistant to wear, rectangular
or square in shape and as directed by the Engineer-in-charge. Uniformity of size shall generally be maintained for the
stones used in any one room. The stone shall be without any soft. Veins, cracks or flaws and shall have uniform
colour. They shall have natural surface free from broken flakes on top, and the exposed surface shall be machine
polished to a smooth, even and true plane and the edges hand cut and dressed true and square. The evenness of the
surface of slabs and edges of the slab shall not be marred by careless dressing or handling and no patching up shall be
allowed for the slab. The edges shall be quite straight. The under face may be left as required or rough dressed.
Before taking up the work samples of stone slabs, to be used and their dressing and polishing shall be got approved by
the Engineersin-charge and will keep them in his office' for reference and the stone slabs to be used shall conform to
the approved sample.
The maximum water absorption percentage and minimum compressive strength shall be as given in Table – 1 below:
Type of Stone Maximum Water Minimum Compressive
Absorption percentage by strength Kg/Sq. cm
Note -1: Test for compressive strength shall be carried out aslaid down in IS: 1121(Part1).
Note -2: Test for water absorption shall be carried out as laid down in IS:
The thickness of the stone shall be as specified in the item.
The Granite stone of approved colour shall be double polished on single or both side as per requirement of items to be
All exposed faces shall be double polished to render truly smooth and even reflecting surface. The exposed edges and
corners shall have rounded off as directed. The exposed edges shall be machine cut& rounded and shall have uniform
M-32 White Washing :
Following materials shall be used for preparing white wash.
1. Fresh burnt white stone or lime.
2. Gum Arabic 2.0 kg / cmt. of lime.
3. Indigo as required.
It shall conform to relevant I.S. specifications.
M-33 Distemper :
Oil bound washable distemper of approved brand and manufacture and colour and shade shall be used. It shall
conform to IS 427-1965. Distemper shall be used according to the manufacturer’s instructions only.
M-34 White Glazed Tiles :
The tiles shall be of second class quality as approved by the Engineer-in-charge. They shall be flat and true to shape.
They shall be free from cracks, crazing spots, chipped, edges and corners. The glazing shall be of uniform shade.
The tiles shall be of nominal size of 150mm x 150mm unless otherwise specified. The maximum variation from the
stated sizes, other than the thickness of tiles, shall be plus or minus 1.5mm. The thickness of tiles shall be 6 mm.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
except as above the tiles shall conform to IS 777-1970.
M-35 Galvanized Iron Pipes & Fitting :
Galvanized Iron pipe shall be of the medium type and of required diameter and shall comply with IS 1239-1979. The
specified diameter of the pipes shall refer to the inside diameter of the bore. Clamps, screws, all galvanized iron
fittings shall be of the standard “R” or equivalent make.All the pipes and fittings shall have ISI certification mark.
The pipe and fittings shall be smooth, sound, free from any imperfections and neatly dressed. The pipe and fittings
shall be above to withstand a safe pressure of 6kg per square centimeter.
M-36 Bib Cock & Stop Cock :
A bib cock is a drawn off tap with a horizontal inlet and free outlet. A stop cock is a valve with a suitable means of
connection for inserting in a pipe line for controlling stopping the flow.
They shall be of sPVCcrew down type and of brass chromium plated and of diameter as specified in the description of
the item. It shall conform to IS 781-1977 or as revised from time to time and they shall be of best Indian make. They
shall be polished bright.
The minimum finished weight of bib cock and stop cock shall be as given below :
Diameter Bib cock Stop cock
M-37 Gun Metal Wheel valve :
The gun metal wheel valve shall be of approved quality, these shall be of the gun metal fitted with wheel and shall be
of gate valve opening full way and of the size as specified. They shall conform to I.S. 778-1980.
M-38 White Glazed Porcelain Wash Basin :
Wash basin shall be of white porcelain of approved quality best Indian make and it shall conform to IS 771-1979 or
as revised from time to time. The size of the wash basin shall be as specified in the item. Wash basin shall be of one
piece construction with continued over flow arrangements. All internal angles shall be designed so as to facilitate
cleaning. Wash basin shall have simple tap hole as specified. Each basin shall have a circular waste hole which is
either rebated or leveled internally with 65mm diameter at top 10 mm depth to suit the waste fitting. The necessary
stud slot to receive the bracket on the under side of the basin shall be provided. Basin shall have an internal soap
holder recess which shall fully drain into the bowl. Necessary CP brass waste, CP chain, brass CP 15mm dia socket,
bottle trap, PVC waste pipe, waste plug and waste couplings shall be provided. The pillar cock for wash basin shall
be in conformation with the I.S. 1275-1976 or as revised from time to time. The height from the floor to top of the
rim of basin shall be 750 to 800 mm as directed.
M-39 European type water closet:
The European type water closet shall be white glazed porcelain second quality and shall be of wash down type
conforming to I.S. 2556-1981 and 771-1979 or as revised from time to time.
“S” trap shall be provided as required with water seal not less than 50 mm. The solid plastic seat and cover shall be
of the best Indian make conforming to I.S. 2548-1980 or as revised from time to time. They shall be made of
moulded synthetic materials which shall be tough and hard with high resistance to solvents and shall be free from
blisters and other surface defects as shall have chromium plated brass hinges and rubber butter four number of
M-40 Indian type Water closet :
The Indian type white glazed water closet of second quality shall be of size as specified in the item conforming to IS
771-1979 and I.S. 2556 (Part-II) 16981. Each pan shall have materials flushing ring of suitable type with adequate
number of holes around as directed to have satisfactory flushing. It shall also have an inlet or back or front for
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
connecting flush pipe as directed by the Engineer-in- charge. The inside of bottom of pan shall have sufficient slope
from the front towards the outlet and surface shall be uniform and smooth.
Pan shall be provided with 100mm diameter “P” or “S” trap with approximately 50mm water seal and 50mm
diameter Vent horn.
A pair of white glazed earthen ware rectangular foot rests of minimum size 250mm x 130mm x 20mm shall be
provided with the water closet.
M-41 Flush Cock :
Half turn flush cock (Medium weight) shall be of brass chromium plated of diameter as specified in the description of
the item. The flush cock shall conform to relevant IS or as revised from time to time.
The flush cock shall be of a make as approved by the Engineer-in-charge.
M-42 Cast Iron Pipes & Fittings :
All soil, waste, vent and anti-symphonize pipes and fittings shall conform to IS 1729-1979 or as revised from time to
time. The pipes shall have spigot and socket ends with head on spigot end. The pipes and fitting shall be true to
shape, smooth, cylindrical their inner and outer surfaces being a nearly as practicable concentric. They shall be sound
and nicely cast and shall be free from cracks, laps, pin holes or other imperfection and shall be neatly dressed and
carefully fettled.
The ends of pipes and fittings shall be reasonable square to their axis.
The sand cast iron pipes shall be of the diameter as specified in the description and shall be in length of 1.5, 1.8m and
2m. including socket ends of pipes unless shorter length either are specified or require at junctions etc. Tee pipes and
fittings shall be supplied without ears unless specified or directed otherwise.
The standard weights and thickness of pipes shall be as shown in the following table:
A tolerance up to minus 10 percent may however be allowed against these standard weights.
Sr. No. Nominal dia of Thickness Overall weight of pipes excuding ears.
1.5m long 1.8 m long 2.0 m long
A tolerance up to minus 15 percent in thickness and 20mm in length will be allowed. For fittings tolerance in lengths
shall be plus 25mm and minus 10 mm.
The thickness of fittings and their socket and spigot dimensions shall conform to the thickness and dimensions
specified for the corresponding size of straight pipes. The tolerance in weights and thickness shall be the same as for
straight pipes.
M-43 Nahni Trap :
Nahni trap shall be sound and free from porosity or other defect which affects serviceability, the thickness of the base
metal shall not be less than 6.5 mm. The surface shall be coated with vitreous enamel thoroughly fused to the cast
iron base. The coating shall be adequate even and shall cover the entire surface. The surface shall be glossy, smooth
and free from craze, chips and other flows or any other kind of defect which affect serviceability. The size of Nahni
trap shall be as specified and shall be self cleansing design.
The Nahni trap shall be of best quality approved by the Engineer-in-charge and shall generally conform to the
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The Nahni trap provided shall be with deep seal, minimum 50mm except at places where trap with deep seal cannot
be accommodated. C.I. Jali shall be of appropriate size and quality.
M-44 Gully Trap :
Gully trap shall conform to I.S. 651-1980. These shall be sound, free from visible defects such as fire cracks or hair
cracks. The glaze of the traps shall be free from crazing. There shall give a sharp clear tone when struck with light,
hammed. There shall be no broken blisters.
The size of the gully trap shall be specified in the item.
Each gully trap shall have on CI grating of square size corresponding to the dimensions of inlet of gully trap. It shall
also have water tight. C.I. cover with frame inside dimensions 300 mm x 300 mm. The cover weighting not less than
4.53 kg., and the frame not less than 2.72 kg. The grating cover and frame shall be of sound and good casting and
shall have truly square machined scatting facts.
M-45 Glazed Stoneware Pipe & Fittings :
The pipes and fittings shall be of best quality as approved by the Engineer-in-charge. The pipe shall be of best quality
manufactured from stoneware of fire clay, self glazed thoroughly burnt through out the whole thickness of a close
event texture, free from air blows, fire blisters, cracks and other imperfections, which affect the serviceability. The
inner and outer surface shall be smooth and perfectly glazed. The thickness of the wall shall not be less than 1/ 12th of
the internal dia. The depth of socket should not be less than 38 mm. The socket shall be sufficiently large to allow a
joint of 6mm around the pipe.
The pipes shall generally conform to relevant I.S. 651-1980.
M-46 GI Water Spout :
The G.I. pipes of 40 mm dia shall be medium quality and specials shall be of “R” brand or equivalent brand of best
approved quality.
The pipes shall have length as required for thickness and wall in which it is fixed and at the outside end one tee and
bend cut at half the length shall be provided and at other end coupling shall be provided to have better fixing. the
water spout shall be provided as per detailed drawing or as directed by the Engineer-in-charge.
M-47 Selected earth / Murrum :
The selected earth / Murrum shall be that obtained from excavated material or shall have to be brought from outside
as indicated in the item. If item does not indicate anything the selected soil shall have to be brought from outside.
The selected earth / Murrum shall be good yellow soil and shall be got approved from the Engineer-in-charge in case
black cotton soil or similar greatly expensive and shrinkable soil shall be used. It shall be cleaned and free from all
rubbish and perishable materials, stones or bats. The cold shall be broken to a size of 50mm or less. Contractor shall
make his own arrangement at his own cost for land for borrowing selected earth / Murrum. The stacking of material
shall be done as directed by the Engineer-in-charge in such a way as not to interfere with any construction activities in
When excavated material is to be used only selected stuff got approved from the Engineer-in-charge shall be used. It
shall be stacked separately and shall comply with all requirements of selected mentioned in Para 2 above.
M-48 Rolling shutters :
The rolling shutters shall be of approved makes and design and shall be suitable for fixing in position as directed by
the Engineer-in-charge.
The shutter shall be built up of inter locking lath section formed from cold rolled strips. The size of different
component shall be as per IS 6248-1979.
The cold rolled steel grip shall be rolling shutter lath section conforming to I.S. 4030-1973.
The self coiling type rolling shutter shall be raised lowered manually by means of a pulling applied to the pulling
handle fixed on the bottom lock place to the top most position with each.
The thickness of steel sheets from which the lath sections have been rolled shall be not less than 0.9 mm for shutter
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
up to 3.5 m width and not less than 1.2mm. Shutter above 3.5 m width.
The lath section shall be rolled so as to have interlocking curls at bottom edges and a deep corrugation at the centre
with a bridge depth of not less than 12 mm for each lath section shall be continuous signal place without any welded
The depth and width of guide channel shall be as under :
Clear width of shutter Min. depth of guide channel.
8 M and above 100 mm
Width of guide channel shall be 25mm for lath section with bridge depth of about 12 mm and 32mm for lath section
with bridge depth of about 16 mm. Size of bracket plate for different height of different rolling shutter shall be as
Clear height Mt. Size of bracket plate minimum
Above 2.3 & up to 2.6 Mt. 325x325x3.15
Above 2.6 & up to 3.00 350x350x3.15
Above 3.0 & up to 3.5 375x375x3.15
Above 3.5 & up to 4.5 400x400x6.00
Above 4.5 & up to 5.5 450x450x6.00
Above 5.5 & up to 6.50 500x500x10.00
Size of shaft pipe shall be as given below :
Width Size of pipe
Up to 2.0 32mm nominal bore
Up to 3.0 m 40mm nominal bore
Up to 6.00 m 50mm nominal bore
Hood cover shall be made of mild steel not less than 0.9 mm thick.
Urinal shall be of 2nd class quality white porcelain of approved quality, best Indian make and it shall conform to IS
1556-Part-II 1974 with suitable size of side collar for fixing in position. The size of urinal shall be as specified in the
item. Urinal shall be of one piece construction. All internal angles shall be designed so as to facilitate cleaning.
Urinal shall have single tap hole as specified. Urinal shall a circular waste hole which is 65mm dia and 100 mm deep
to suit the waste fitting.
Necessary C.P. brass stop cock with PVC connection of specified size shall conform to I.S. 781-1977. Necessary
PVC reducer with PVC waste pipe of 25mm dia shall be designed to make height from the floor to the top of the rim
of the urinal 550 to 600 mm as directed.
M-50 Wooden flush door shutters (solid Core) :
The solid core type flush door shutters shall be decorative or non-decorative in the drawing. The size and thickness of
the shutter shall be as specified in drawings or as directed. The timber species for core shall be used as per IS- 2202 –
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(Part-1) 1980. The timber shall be free from decay and insect attack. Knots and know holes less than half the width of
cross section of the members in which they occur may be permitted. Pitch pockets, pitch streaks and harmless pin
holes shall be permissible except in the exposed edges of the core members. The commercial plywood, cross – bands
shall conform to I.S 303-1275.
The face panel of the shutters shall be formed by gluing by the hot press on both faces of the core with either
plywood or cross-bands and face veneers. The hopping rebating opening of glazing, venation etc. shall be provided if
specified in the drawing.
All edges of the door shutters shall be square. The shutters shall be free from twist or warp in its plane. Both faces of
the shutters shall be sand papered to smooth even texture.
The shutter shall be tested for :
1. End immersion test : The test shall be carried out as per IS 2202 (Part-I) 1980. There shall be no
delaminating at the end of the test.
2. Knife Test : The face panel when tested in accordance with IS 1659-1979 shall be pass the test.
3. Glue adhesion test : The flush door shall be tested for glue adhesive test in accordance with I.S.
(Part-I) 1980. The shutters shall be considered to have passed the test if no delaminating occurs in the
glue lines in the plywood and if no single delaminating more than 80mm in length and more than 3 mm
in depth has occurred in the assembly glue lines between the plywood face and the style and rail.
Delaminating at the corner shall be measured continuously around the corner. Delaminating at the knots,
knot holes and other permissible wood defects shall not be considered in assessing the sample.
The tolerance in size of solid core type flush door shall be as under :
In normal thickness +/- 1.2mm
In normal height +/- 3mm.
The thick of the shutters shall be uniform throughout with a permissible variation of not more than 0.8 mm when
measured at any two points.
M-51 Aluminum doors, windows, ventilators :
Aluminum alloy used in the manufacture of extruded window sections shall conform to I.S. designation HEA-WP of
I.S. 733-1975 and also to I.S. Designation WVG-WP of I.S. 1285-1975. The section shall be as specified in the
drawing and design. The fabrication shall be done as directed.
The hinges shall be cast or extruded aluminum hinge of same type as in window but of large size.
The hinges shall normally be of 50mm projecting type. Non-projecting type of hinges may also be used if directed.
The handles of door shall be of specified design. A suitable lock for the door operatable either from outside or inside
shall be provided. In double shutter door, the first closing shutter shall have concealed aluminum alloy bolt at top and
M-52 Collapsible Steel Gate :
The collapsible steel gate shall be in one or two leaves and size as per approved drawings or as specified. The gate
shall be fabricated from best quality mild steel channels, flats etc. Either steel pulleys or ball bearings shall be
provided in every double channel. Unless otherwise specified the particulars of collapsible gates shall be as under :
a) Pickets : These shall be of 20mm M.S. channels of heavy sections unless otherwise shown on
drawings. The distance centre to centre of pickets shall be 12 cms. with an opening of 10 cms.
b) Pivoted M.S. flats shall be 20mm x 6mm.
c) Top and bottom guides shall be from tee or flat iron of approved size.
d) The fittings like stoppers, fixing hold fast, locking cleats, brass handles and cast iron rollers shall
be of approved design and size.
M-53 Plastic sections for door / window partition etc.
Technical features for plastic section shall be as under:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
i) Material of construction shall be specially formulated PVC compounds.
ii) Water absorption: 0.8% at 100 degree Centigrade in 24 hours thus virtually water and moisture
iii) Chemical resistance: It shall be resistance to acid / alkalis.
iv) Fire resistance: Self-extinguishing classified under first class construction material by insurance
v) Termite and Fungal resistance: Material shall be fully resistance to termite and fungal attack.
vi) Thermal conductivity: Very low thermal conductivity co-efficient varies from 0.015 to 0.016 Kcal /
vii) Acoustic property: Max. absorption shall be up to 38%.
M-54 Water Proofing Cement Paint:
Water proofing cement paint of approved shade shall conform to IS-5410-1969 or as revised from time to
time. Primer shall be best quality, make and as approved by the Engineer-in-charge. The materials required
for work of painting shall be obtained directly from approved manufacturer or approved dealer and brought
to the site in maker’s drums, keys etc. with seal unbroken.
M-55 Stone For Bela Masonary:
Pucca approved white stone bella of sand of uniform size shall be dressed, earth/murrumy or discolnged or weathered
or water worm stone shall not be used. The size of bella stone shall as directed by Engineer to suit the width of wall.
Corner stones & quoins shall be of good quality and should be dressed to correct angle. The corner stone shall be got
approved before bringing to site.
The stone shall be free from defects like cavity, flaws, sand holes, and veins, patches of soft or loose material. The
percentage of water absorption shall generally not exceed 5 % by weight. Generally, the stone shall not contain silica
or chert, mica or any other deleterious material like iron oxide organics impurities etc. The crushing strength of bella
stone shall not less than 300 Kg/cm2. Transverse strength shall not less than 70 Kg/cm2.
M-56 Vitrified floor tiles :
Vitrified floor tiles shall be of best quality & approved make as approved by the Engineer. They shall conform to the
relevant I.S. codes.
Vitrified tiles using for floor finishing should confirm ISO13006/E176 group B.1.a of international standards and
also should confirm of testing methods of norms EN
The vitrified tiles shall be Monolithic and available in smooth, mirror polished and anti-skid finish. Their water
absorption rate shall be less than 0.5%. They shall offer hard working and hardwearing floors for public buildings.
The tiles shall be of ASTM or DIN standards.
The vitrified tiles shall be extremely strong breaking strength of the tiles being 1600 kg./cm2, flexural strength
kg. / Cm2 and bounding strength of 2500 kg/cm2. There shall after good resistance to abrasion i.e. greater than
There shall be scratch resistance; their hardness on the Moh’s scale shall be min. 7. They shall also to resist thermal
shock up to 10 cycles. They shall have a density of 2.2 gm/cc. They shall have 0.6 co-efficient of friction for polished
/ unpolished surfaces.
M-57 85 mm thick pre-cast Rubber molded interlock paver concrete block
The 85mm thick pre-castRubber molded interlock paver concrete block shall be manufactured by electrical hydraulic
operated block marking machine. The block should have minimum compression strength of 300 kg. Per sq.cm. The
minimum thickness of the pre-castRubber molded interlock paver concrete block shall be 85mm and minimum size
shall be 300x300mm. The block shall be of approved make & best quality as approved by the Engineer-in-charge.
The size, shape, and shade of pre-castRubber moulded interlockpaver concrete block shall be as approved by the
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Engineer-in-charge. There shall be true to shape. There shall be free from crack, crazing, and spots etc.
M-58 Acrylic roof Sheets:
Acrylic roof sheets shall be of thickness as specified in the item. The shape and size of sheet shall be as directed.
Acrylic roof Sheets may be flat or curved. It should be light in weight. It shall be colourless or coloured or opaque.
Colourless sheet shall be as transparent as the finest optical glass. Its light transmission rate shall be about 95%.
Transparency shall not be affected for the sheets of larger thickness. It shall be extremely resistant to sunlight,
weather and low temperatures. It shall not show any significant yellowing or change in physical properties or loss of
light transmission over a longer period of use. The sheet shall be impact resistant also. Sheet should be available in
complete range of standard transparent, man lucent and opaque colors. Sheets shall be of such quality that they can
be cut bent and jointed as desired. Solution for the joints shall be used as per the requirement of manufacturer.
M-59 Galvanised iron pipes and fittings :
Galvanised iron pipe shall be of the medium type and of required diameter and shall comply with I.S.I 239-1979. The
specified diameter of the pipes shall refer to the inside diameter of the bore. Clamps, screw and all galvanised iron
fittings shall he of the standard ‘R’ or equivalent make.
M-60 Crydon Ball Valve :
Ball valve of screwed type including polthylene float and necessary lever etc. shall be of the sizeas
mentioned in the description of item and shall conform to I.S. 1703-1977.
The plywood for general purpose shall conform I:S. 303-
Plywood is made by cementing together thin boards or sheets of wood into panels. There are always an odd
number of layers 3, 5,7, 9 ply etc. The plies are placed so that grain of each layer is right angle to the grain in
the adjacent layer.
The chief advantages of plywood over a signal board of the same thickness is the more uniform strength of
the plywood, along the length and width of the plywood and greater resistance to cracking and splitting with
change in moisture content, Usually synthetic resins are used for gluing, pherolic resins are usually cured in a
hot press which compresses and simultaneously heats the plies between hot plates which maintain a
temperature of 90 degree. C. to 140 degree C. and a pressureof 11 to 14 Kg/Sq. Cm. on the wood. The times
of healing may be anything from 2 to 60 minutes depending upon thickness.
When water glue are used, the wood absorbs so much water that the finished plywood must be dried
carefully. When synthetic resins are use as adhesive finished plywood must be exposed to an atmosphere of
controlled humidity until the proper amount of moisture, has been absorbed.
According to I.S. 303-1975 the plywood for general purpose shall be of three grades namely BWR, WWR
and CWR, depending upon the adhesives used for bonding and veneers, and it will be farther classified into
six types namely AA. AB. AC, BB, BC and C,C based on the quality of the two faces, each face being of
three finds namely, A, B. and C. After pressing, the finished ply wood should be reconditioned to a moisture
content not less than 8 percent and not more than 16 percent.
CODE OF PRACTICE
(1) The method of execution of the items shall conform to the relevant specifications as per the latest version of
the Indian Standard unless specified otherwise and as far as applicable.
(2) Wherever a reference to ANY Indian Standard appears in the specification, it shall be taken to mean as a
reference to the latest version of the standard.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(3) The following specifications, standards, and codes are made as a part of this specification.
Indian Standards : specification for building materials, specification for equipment, method of test, method
of measurement of building works ,code of practice for construction , safety code for demolition of building,
safety code for scaffolds etc. published by the Bureau of Indian Standards
(4) The contractor shall invariably carry out Materials & work Tests as specified in the tender document (B2-
Form) and IS code. However, if the additional tests are required as per the opinion of the Engineer-in-charge,
the same shall also have to be carried out. All such tests shall be got carried out in Government or as
approved laboratories and cost thereof shall be entirely borne by the contractor. No collection of materials
shall be made before it is got approved from the Engineer-in-charge.
All moulds, equipments etc. required of preparing specimens for the test shall be kept in sufficient numbers and in
good state, as directed by the Engineer-in-charge on the site of work.
Specimen for tests shall sent to the laboratory along with representative of GIDC in time and the results thereof shall
be promptly obtained and reported to the Engineer-in-charge.
(5) Satisfactory test results shall not observed the contractor from dismantling and re-doing any work revealed to
the defective at a later date. The contractor shall have no claim for any payment or compensation whatsoever
on account of replacement of such defective work. Contractor shall take all precautions and care during
dismantling and re-doing the work to ensure that any other work so far executed does not get damage or
(6) The work shall be carried out in true line and level and in conformity with the detailed drawing and specified
(7) All the work shall be carried out in a workmanship like manner and as per the best techniques for the
particular item.
(8) All tools, tempts equipments etc. for correct execution of the work as well as for checking lines, levels,
alignments of the works, during execution shall be kept in sufficient numbers on the side of work.
(9) All installations pertaining to water supply and its fixtures as well as drainage lines and sanitary fitting shall
be deemed to be completed only after giving satisfactory tests by the contractor.
(10) Scaffolding being provided by the contractor at his own cost for such of the items for the execution of
which it is essential.
In all sorts of soil, sand, gravel, soft murrum and other similar soft or loose material. The excavation will generally
refer to the open excavation for foundation.
Clearing the site:
The site on which the structure is to be built shall be cleared and all obstructions, loose stones, material, and rubbish
of all kind, bush, wood, and trees shall be removed as directed. The materials so obtained shall be the property of the
GIDC and shall be conveyed the stacked as directed by the Engineer-in-charge.
After clearing the site the centre lines will be given by the Engineer. The contractor shall assume full responsibility
for alignment, elevation, and dimension of each and all parts of the work. Contractors shall supply labour materials,
etc. required for setting out the reference marks and bench marks and shall maintain them as long as required.
It shall be all sorts of soil, sand, gravel, soft murrum, or other similar soft or loose materials.
The excavating for foundation and for basement shall be carried out in true line and level and shall have the width and
depth as shown in the drawing or as directed by the Engineer-in-charge. The contractor shall do the necessary
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
shorting and shutting or slopes to a safe angel, if necessary including bailing and pumping out water when separate
provision does not exist for it in tender, at his own cost. The bottom of the excavated area shall be leveled both
longitudinally and transversely as directed by the Engineer-in-charge. No earth filling will be allowed to bring it to
level if by mistake or any other reasons excavation is made deeper or wider than shown on the plan or directed by the
Engineer-in- charge. The extra depth or width shall be made up with concrete or masonry of the foundation grade as
directed by the Engineer-in- charge and at the cost of the contractor.
Disposal of the excavated stuff:
The excavated stuff of the selected type shall be used in filling the trenches in layers including ramming and watering
The balance of the excavated quantity shall be removed by the contractor from site of work to a place as directed by
the Engineer-in-charge with all lead and lift but within the same estate.
1 Excavation in Hard murrum :
Same as C-1/1 except that the excavation shall be in hard murrum.
2 Excavation in Hard murrum and boulders.
Same as C-1/1 except that the excavation shall be in hard murrum and boulders.
3 Excavation in soft rock :
Same as C-1/1 except that the excavation shall be in soft rock.
4 Excavation in Hard rock.
Same as C-1/1 except that the excavation shall be in hard rock
C-2 Plain Cement Concrete Laying in Foundation / for Floor Bedding :
Before starting concrete, the bed of the foundation trenches shall be cleared of all loose materials and watered as
Proportioning of Mix:
The proportion of the cement to sand and coarse aggregates shall be as specified in the item and shall be measured by
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for
smaller quantities of work if approved by the Engineer-in-charge. The mixing shall be done for a period of 11/2 to
minutes. The quantity of water shall be just sufficient to produce a dense concrete of required workability for the
All scaffolding, hoisting arrangement and ladders etc. required for the facility of concrete shall be provided by the
contractor and removed on completion of work. The scaffolding, hoisting arrangement and ladders shall allow easy
approach to the work and afford easy inspection.
The form work shall be provided if necessary as directed by the Engineer-in-charge and shall be as per I.S. 461-1972
or revised from time to time.
Transporting & placing the concrete:
The concrete shall be handled from the place of mixing to the final position by not more than 15 minutes by the
method as directed by the Engineer-in-charge and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences.
The concrete shall be laid in layers of 15 cms to 20 cms.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The concrete shall be thoroughly compacted by hammers immediately after depositing to get a dense concrete.
Concrete shall not be disturbed once it has set.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period of not less than
days from the date of placement.
C-3 Lime Cinder Concrete Laying :
This shall be as per C-2 of code of practice. The coarse aggregate in this case shall cylinder.
C-4 Ordinary Cement Concrete Plain or Reinforce :
I.S. 466-1978 or as revised from time to time shall be followed in general cement sand by black trap grit and coarse
aggregate shall be measured by volume. For proportioning of cement by volume one bag of cement shall be taken as
Concrete shall be mixed in a mechanical mixer. Mixing shall be continued until there is a uniform distribution of the
materials and the mass is uniform in colour and consistency but in no case shall mixing be done for less and 1.1/2
minutes. When hand mixing is permitted by the Engineer-in-charge in case of small work or in case of break down of
machineries and in the interest of the work it shall be carried out on a water tight platform and care shall be taken to
ensure that mixing is continued until the mass is uniform in colour and consistency. However, in such cases 10%
more cement than otherwise required have to be used without any extra cost.
Concrete shall be handled from the place of mixing of the final position as quickly as practicable by methods which
will prevent segregation or loss of ingredients. In no case operation shall be taken more than 15 minutes.
The concrete shall be placed into its final position and completed and finished within 30 minutes of mixing the water
and before setting commence. Method of placing shall be such as to avoid segregation, approved by the Engineer-in-
charge. Concreting shall be carried out continuously up to construction joints, the position and arrangement of which,
shall be pre-determined by the designer.
When the work has to be resumed on a surface which has hardened, such surface shall be roughened. It shall then be
swept clean thoroughly wetted and covered with a thin layer or mortar composed of cement and sand in the same
proportion as the cement and sand in the concrete mix. This layer of mortar shall be freshly mixed and placed
immediately before the placing of the concrete.
When the concrete has not fully hardened, all laitance shall be removed by scrapping the wet surface with wire or
bristles care being taken to avoid dislodgement of particles or aggregates. The surface shall be thoroughly wetted and
all free water removed. The surface shall be coated with neat cement grout. The first layer of concrete to be placed on
this surface shall not exceed 150mm in thickness and shall be well rammed against old work. Particular attention is
paid no corners and spots.
Concrete shall be thoroughly compacted during the operation of placing and thoroughly worked around the
reinforcement, around embedded fixtures and into corners of the form work. Compacting shall be done by mechanical
vibrations, in such a way that a dense mix is obtained.
The concrete shall be kept covered with a layer of sacking canvas or similar materials or by pounding and kept
constantly wet for twenty one days from the date of placing concrete. Curing by pounding shall preferably be done by
erecting suitable dykes of lean mortar.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The form work shall conform to the shape, lines and dimensions as on the plans and be so constructed as to remain
sufficiently rigid during the placing and compacting of the concrete, and shall be sufficiently water tight to prevent
loss of liquid from concrete. Adequate arrangements shall be made by the contractor to safeguard against any
settlement of the form work during the course of concreting and after concreting. The design of the form work and
centering shall be got approved form Engineer-in-charge before erection.
Cleaning & Treatment of Forms:
All rubbish, particularly chipping shavings and saw dust shall be removed from the interior of the forms before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treatment
with an approved composition. Care shall be taken that such approved composition is kept out of contract with
Stripping Time:
In normal circumstances and where ordinary cement is used, forms may be struck after expiry of following period
(a) Walls columns & vertical side of beams 24 to 48 hours as may be decided by
the Engineer-in-charge.
(b) Side of slabs 3 days
(c) Beam 7 days
(d) Removal of props to slabs.
(i) Slabs spanning up to 4.5 M 7 days.
(ii) Spanning over 4.5 M 14 days.
(e) Removal of props to beams & arches.
(i) Spanning up to 6 M
(ii) Spanning over 5 M 14 days
Procedure when removing the Form work:
All form shall be removed without such shock or vibrations as would damage the reinforced concrete surface. Before
the soffits and struts are removed and concrete surface shall be exposed where necessary in order to ascertain that the
concrete has sufficiently hardened. The form work will be paid under the respective item if provided in the tender.
The centering to be provided shall be got approved form the Engineer-in-charge. It shall be sufficiently strong to
ensure absolute safety of the form work and concrete work before, during, and after pouring concrete. Watch should
be kept to see that behavior of centering and formwork is satisfactory during concreting. Erection should also be such
that it would allow removal of forms in proper sequence without damaging either the concrete or the forms to be
The props of centering shall be provided on firm foundation of base of sufficient strength to carry the loads without
The centering and form work will be inspected and approved by the Engineer-in-charge before concreting. But this
will not relive the contractor or his responsibility for strength, adequacy, and safety of form work and if there is a
failure of form work or centering, contractor shall be responsible for the damages to work, injury to life and damage
to the property.
All scaffolding, hoisting arrangements etc. required for the facility of concreting shall be provided and removed on
completion of work by the contractor at his own expenses. The scaffolding, hoisting arrangement and ladders etc.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
shall be strong enough to withstand all live, dead and impact loads expected to act and shall be subject to the
approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety of the scaffolding,
hoisting arrangement, ladders, work, and workmanship etc.
The scaffolding, hoisting arrangement and ladders shall allow easy approach to the work spot and afford easy
Work sample of concrete 150mmx150mm x 150mm shall be taken as under:
Qty. of work in M3 No. of sample
51 & above 4+1 for each additional quantity of 50 M or part
The contractor shall make his own arrangement for taking sample and testing of the sample in the Government or the
approved laboratories. The test shall be carried out in accordance with IS 516-1959 or as revised from time to time. A
register of cubes shall be maintained the site of work in the prescribed Performa. The result of the cubes shall be
submitted to the Engineer-in-charge by the contractor.
Note: (1) At least one sample shall be taken from each shift
(2) Each sample consists of three test specimens for testing at 28 days.
Additional cubes may be required for various purposes. Such as to determine the strength of concrete
at 7 days or at the time of striking the form work or to determine the duration of curing or to check
the testing error.
Finishing unless otherwise specified in the item to keep the exposed concrete surface, the concrete surface shall be
finished with cement mortar 1:4 (1- cement: 4-sand) in true line level in accordance with M-9 of specification of
C-5 Controlled concrete :
The concrete shall be designed as M-150, M-200, M-250, M -300 & M-400 as prescribed in I.S. 456-1978 or as
revised from time to time.
Samples of the aggregates proposed to be used shall be got approved from the Engineer-in-charge prior to collection
of the materials at the site of work field test for determining the content of silt, loam, clay etc. In fine aggregate and
grading and moisture content in both fine and coarse aggregate shall be carried out before commencing the concreting
work and record of the test shall be maintained till the completion of the work.
The grading of aggregate shall be controlled by obtaining the fine and coarse aggregate in different size being stocked
in separate stock piles. The grading of coarse and fine aggregate shall be checked as frequently as possible. The
frequency shall be as directed by the Engineer-in-charge, to ensure that the uniform grading as per approved samples
used in the preliminary tests is maintained.
As soon as possible, after receiving the order to commence the work the contractor shall design the mix for different
grades of concrete required in the work submit details in respect of proportion of cement and aggregates water cement
ration etc. and arrangement to make trial mixes for preliminary tests to be carried out in the Government or any other
approved laboratory to satisfy the Engineer-in-charge that the designed mix meets with the prescribed strength. The
maximum total quantity to aggregates by weight per 50 Kg. of cement shall not exceed 450 Kg. except where
otherwise specifically permitted by the Engineer-in-charge.
The minimum number of specimens for preliminary test and criteria for acceptance of test strength shall conform to
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Table –V Acceptance criteria for concrete of I.S. 456-1978.
On the satisfactory results of the above tests, the mix actually to be used shall be got approved from Engineer-in-
charge. The approval of the Engineer-in-charge will not relieve the contractor of his responsibility for obtaining the
required minimum strength in the work test. Record of all tests in support of mix design shall be maintained as a part
of record of the contract.
STRENGTH REQUIREMENT OF CONCRETE:
The compressive strength requirements for various grades of concrete shall not be lower than the figures given below:
Grade of Compressive strength of 15 cms cubes conducted in accordance with
concrete I.S. 516-1959.
After 28 days after At 7 days after At 28 days after
mixing in preliminary mixing in work test mixing in work test
test (Kg/cm2) (Kg/cm2)
PROPORTIONING & WORKS CONTROL:
The mix proportions shall be selected to ensure that the workability of the fresh concrete suitable for the
condition of handling and placing, so that after compaction it surrounds all reinforcement and completely
fills the form work. When concrete is hardened, it shall have the required strength, durability and surface
The determination of the proportions of cement, aggregate and water to attain the required strength shall as
(a) By designing the concrete mix; such concrete shall be called "Design Mix Concrete" or "Controlled
(b) By adopting nominal mix, such concrete shall be called "Nominal Mix
OPTIONAL WORK TEST REQUIREMENTS OF CONCRETE (All values in N/mm²)
(All tests conducted in accordance with IS: 516)
Modulus of Rupture by Beams Test
Grade of Compressive Strength of Min.
Concrete 150mm cubes, min at 7 days At 72 + 2 at 7 days
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The concrete mix shall be designed to have an average strength corresponding to the values specified for preliminary
tests in Table. The proportions chosen should be such that the concrete is of adequate workability for the conditions
prevailing on the work in question, and can be properly compacted with the means available. The maximum total
quantity of aggregate by weight per 50 kg. Of cement shall not exceed 450 kg. except where otherwise specially
permitted by the Engineer-in-Charge.
Except where it can be shown to the satisfaction of the Engineer-in-Charge that supply of properly graded aggregate
of uniform quality can be maintained over the period of work, the grading of aggregate should be controlled by
obtaining the coarse aggregate in different sizes and blending them in the right portions when required, the different
sizes being stocked in separate stock piles. The material should be stock piled for several hours preferably a day
before use. The grading of coarse and fine aggregate should be checked as frequently as possible, the frequency for a
given job being determined by the Engineer-in-Charge to ensure that the suppliers are maintaining the grading
uniform with that of the samples used in the preliminary test.
In proportioning concrete, the quantity of both cement and aggregate should be determined by weight, where the
weight of cement is determined by accepting the maker's weight per bag. A reasonable number of bags should be
weighted separately to check the net weight. Where the cement is weighed on the site and not in bags, it should be
either measured by volume in calibrated tanks or weighed. All measuring equipment should be maintained in clean
serviceable conditions, and their accuracy periodically checked.
It is most important to maintain the water cement ratio constant at its correct value. To this end, determination of
moisture contents in both fine and coarse aggregates should be made as frequently as possible, the frequency for a
given job being determined by the Engineer-in-Charge according to weather conditions. The amount of the added
water shall be justified to compensate for any observed variations in the moisture contents. For the determination of
moisture content in the aggregate for concrete: Part-III specific gravity, density, voids, absorption and bulking may
be referred to. To allow for the variation in weight of aggregate due to variation in their moisture content, suitable
adjustments in the weights of aggregate should also be made.
No substitutions in materials used on the work or alterations in the established proportions, except as permitted in the
above para shall be made without additional tests to show that the quality and strength of concrete are satisfactory.
WORKABILITY OF CONCRETE:
The concrete mix proportions chosen should be such that concrete is of adequate workability for the placing
conditions of the concrete and can properly be compacted with the means available. The definitions of the ranges of
"workability" of concrete as measured by either the slump or V-B tests (IS: 1199) and the range to be adopted for
different kinds of work unless specified otherwise is given in Table - 2.9.
WORKABILITY OF CONCRETE
Placing conditions Slump (mm) Values of Workability
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Vee-Bee Compacting
Blinding concrete; Very Low -- 20- 10 0.75 -
Shallow Sections; secs
Pavements using pavers
Mass concrete; Low 25 - 75 10 - 5 secs 0.80 -
Lightly reinforced sections in
slabs, beams, walls, columns;
Floors; Hand placed
pavements; Canal lining; Strip
Heavily reinforced sections in Medium 50 - 100 5 - 2 secs 0.85 - 0.92*
slabs, beams walls, columns; 75 -
Slip form work; Pumped
Trench fill; High 100 - 150 -- Above 0.92**
In-situ piling Very high Workability to be Above 0.92**
Termite concrete decided by
determination of
flow (IS: 9103)
Note: For most of the placing conditions, internal vibrators (needle vibrators) are suitable. The diameter of the needle
shall be determined based on the density and spacing of reinforcement bars and thickness of sections. For tremie
concrete, vibrators are not required to be used.
A competent person should be employed whose duty will be to supervise all stages in the preparation and placing of
the concrete. All works test specimens should be prepared and site tests carried out under his direct supervision
REQUIREMENT FOR DURABILITY:
Minimum cement content required in cement concrete to ensure durability under specified conditions of exposure
should be as given in Table 2.12 unless otherwise specified. The general environment to which the concrete will be
exposed during its working life is classified into five levels of severity, that is, mild, moderate, severe, very severe
and extreme as described in Table 2.13.
Minimum Cement Content, Maximum Water Cement Ratio and Minimum Grade of Concrete for Different
Exposures with Normal Weight Aggregates of 20mm Nominal Maximum Size
Exposure Plain Concrete Reinforced Concrete
Minimum Maximum Minimum Minimum Maximum Minimum
Cement Free Grade of Cement Free Grade of
Content Water- Concrete Content Water- Concrete
kg/m³ Cement kg/m³ Cement
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The general environment to which the concrete will be exposed during its working life is classified into five levels of
severity, that is, mild moderate, severe, very severe and extreme as described in Table 2.13.
ENVIRONMENTAL EXPOSURE CONDITIONS
Sr. Environment Exposure Conditions
1. Mild Concrete surfaces protected against weather or aggressive conditions, except
those situated in coastal area.
2 Moderate Concrete surfaces sheltered from severe rain or freezing whilst wet.
Concrete exposed to condensation and rain
Concrete continuously under water
Concrete in contact or buried under non-aggressive soil/ground water
Concrete surfaces sheltered from saturated salt air in coastal area
3. Severe Concrete surfaces exposed to severe rain, alternate wetting and drying or
occasional freezing whilst wet or severe condensation.
Concrete completely immersed in seawater
Concrete exposed to coastal environment
4. Very Severe Concrete surfaces exposed to seawater spray, corrosive fumes or severe
freezing conditions whilst wet.
Concrete in contact with or buried under aggressive sub-soil/ground water
5. Extreme Surface of members in tidal zone
Members in direct contact with liquid/solid aggressive chemicals
MIX DESIGN AND SAMPLING AND TESTING FOR CONCRETE
Facilities required for sampling materials, shall be provided when required by the Engineer. The methods used in
sampling, laying curing and testing the concrete samples, either in the field or in the laboratory, shall be in
accordance with the appropriate Indian Standards. This is to investigate the grading of aggregate, water cement ratio,
workability and the quantity of cement required to give works cubes of the minimum strength specified.
The mix shall be designed to produce the grade of concrete having required workability and desired characteristic
strength. As long as the quality of the materials does not change, a mix design done earlier may be considered
adequate for later work. As already stated under "proportioning" the proportion of the mix shall be by weight. In case
uniformity in the materials used for concrete making has been established over a period of time, the proportioning
may be done by volume batching, by the use of bulk densities, provided periodic checks are made on mass/volume
relationships of materials. Where weigh batching is not practicable, the quantities of fine and coarse aggregate (not
cement) may be determined by volume. If aggregate is moist and volume batching is adopted, allowance shall be
made for bulging in accordance with IS: 2386 (Part-III). Mix proportioning shall be carried out according to the ACI
Standard ACI 631 or "Design of Concrete Mixes” Road Research Note No.4 of Department of Scientific and
Industrial Research, U.K.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Whenever there is either a change in strength of concrete required, water cement ratio, workability or the source of
aggregates and cement, preliminary tests shall be conducted again to determine the revised proportions of the mix to
suit the later conditions. While designing mix proportions, over wet mixes should always be avoided.
PRELIMINARY TESTS:
The materials and proportion used in main preliminary tests shall be similar in all respects to hose to be actually
employed in the works as the object of this test is to determine proportion of cement, aggregates and water necessary
to produce the concrete of consistency required to give the strength specified. It will be the contractor's sole
responsibility to carry out these tests and he shall therefore furnish to the Engineer, statement of proportions
proposed to be used for concrete mix. For preliminary tests, the following procedure shall be followed. Materials
shall be brought to the room temperature and all materials shall be in a dry condition. The quantities of water, cement
and aggregate for each batch shall be determined by weight to an accuracy of 1 Part in
Concrete shall be mixed in a mechanical mixer. The mixer should comply with IS: 1791. The cement and fine
aggregate shall first be mixed dry until the mixture is in uniform colour. The coarse aggregate shall then be added,
mixed and water added and mixed thoroughly for a period of not less than two minutes after all the materials are in
the drum and until the resulting concrete is uniform in appearance. If there is segregation after unloading from the
mixer, the concrete should be remixed.
(b) The consistency of each batch of concrete shall be measured immediately after mixing, by the slump test in
accordance with IS: 1999. In the slump test, care shall be taken to ensure that no water is lost; the material used for
slump test may be remixed with the remainder of concrete for making the test specimen. The period of remixing shall
be as short as possible yet sufficient to produce a homogeneous mass.
Note: In exceptional circumstances such as mechanical breakdown of mixer, work in the remote areas or when the
quantity of concrete work is very small, hand mixing may be permitted, subject to adding 10% extra cement at his
(contractor's) cost. When hand mixing is permitted, it shall be carried out on a watertight platform and care shall be
taken to ensure that mixing is continued until the concrete is uniform in colour and consistency.
CONCRETE CUBES:
(a) Size of test specimen & moulds:
Test specimens cubical in shape shall be 150 x 150 x 150 mm. If the largest nominal size of the aggregate does not
exceed 200mm, 100 mm cubes may be used as an alternative.
A cube mould should be of metal and stout enough to prevent distortion. It shall be constructed in such a manner as
to facilitate the removal of the moulded specimen without damage, and shall be so machined that, when it is
assembled ready for use, the dimensions and internal faces shall be accurate within the following limits:
Height of mould and distance between opposite faces: Specified size + 0.2 mm.
Angle between adjacent faces: 90 + 0.5 degree
Each mould shall have a plane face metal base plate of such size as to support the mould during the filling without
leakage and shall be attached to the moulds; when assembled shall be positively and rigidly held together and
suitable methods of ensuring this, both during filling and on subsequent handling of the filled mould, shall be
provided. In assembling the mould for use, the joints between the sections of mould shall be thinly coated with
mould oil and a similar coating of mould oil shall be applied between the contact surfaces of the bottom of the mould
and the base plate in order to ensure that no water escapes during filling. The interior surfaces of the assembled
mould shall be thinly coated with mould oil to prevent adhesion of the concrete. The tamping bar shall be a steel bar
16 mm. in diameter, 0.6 m. long and bullet pointed at the lower end.
(b) Compacting:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The test specimens shall be made as soon as practicable after mixing and in such a way as to produce full compaction
of the concrete with neither segregation nor excessive laitance. The concrete shall be filled into the mould in layers
approximately 50 mm deep. In placing each scoopful of concrete, the scoop shall be moved around the top edge of
the mould as the concrete slides from it, in order to ensure a symmetrical distribution of the concrete within the
mould. Each layer shall be compacted as described below. After the top layer has been compacted, the surface of the
concrete shall be finished level with the top of the mould using a trowel, and covered with a glass or metal plate to
prevent evaporation.
For compacting, standard tamping bar shall be used and the strokes of the bar shall be distributed in a uniform
manner over the cross section of the mould. The number of strokes per layer required to produce specified conditions
will vary according to the type of concrete but in no cases shall be less than 35 strokes per layer for 150 mm cubes or
25 strokes per layer for 100 mm cubes. The strokes shall penetrate into the underlying layer and the bottom layer
shall be rodded throughout its depth. Where the tamping bar leaves voids, the sides of the mould shall be tapped to
close the voids.
The test specimen shall be stored on the site at a place free from vibration under damp-matting, sacks or other similar
material for 24 hours + 0.5 hour from the time of adding water to the other ingredients at a temperature range of 22
C to 32 C After 24 hours, they shall be marked for later identification, removed from the moulds and stored in clean
water at a temperature of 24 C to 30 C. They shall be sent to the testing laboratory well packed in damp sand, sacks
or other suitable material so as to arrive there in a damp condition not less than 24 hours before the time of test. On
arrival at the testing laboratory, the specimen shall be stored in water at 27 C +2 C temperature until the time of
test. Records of the daily maximum and minimum temperature shall be kept both during the period the specimens
remain on the site and in the laboratory.
(d) Tests for Cube Specimen:
The concrete cubes shall be tested in standard testing machines by skilled personnel. Tests shall be made at
recognized ages of the test specimen, the most usual being 7 and 28 days. Tests may be made at 24 hours + 1/2 hour
and 72 hours + 2 hours if early strengths are needed. The age shall be calculated from the time of the addition of
water to the dry ingredients.
At least three specimens, preferably from different batches shall be made for testing at each selected age.
Specimens stored in water shall be tested immediately on removal from the water and while they are still in the wet
condition. Surface water and grit shall be wiped off the specimens and any projecting fins removed.
The bearing surface of the testing machine shall be wiped clean and any loose sand or other material removed from
the surfaces of the specimen, which are to be in contact with the compression platens. The specimen shall be so
placed in the machine that the load shall be applied to the opposite sides of the cubes as cast, that is, not to the top
and bottom. The axis of the specimen shall be carefully aligned with the centre of thrust of the spherically seated
platen. No packing plates shall be used between specimen and platens of the machine. Once the uniform seating is
obtained, load shall be applied without shock and increased continuously at a rate of approximately 14.0 N/mm²
/Min. until the resistance of the specimen to the increasing load breaks down and no greater load can be sustained.
The maximum load applied to the specimen shall be recorded and the appearance of the concrete and any unusual
features in the type of failure shall be noted.
The measured compressive strength of the specimen shall be the maximum load applied to the specimen divided by
the cross sectional area of the specimen and shall be expressed to the nearest N. per sq. mm. Average of the values
shall be taken as the representative of the batch provided the individual variation is not more than + 15 percent of the
average. Otherwise repeat tests shall be made. Cube crushing strength shall conform to the values given in Tables
(e) Frequency of Sampling of Concrete Cubes:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
A random sampling procedure should be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested; that is, the sampling should be spread over the entire period of concreting covering all mixing units. The
minimum frequency of sampling of concrete of each grade shall be as follows:
Quantity of concrete in the work cu.
5 Plus one additional sample for each additional 50m or
The test specimens shall be made from each sample for testing at 28 days. Additional cubes may be required for
determining strength of concrete at 7 days. The test strength of the sample shall be the average strength of three
specimens. The individual variation should not be more than 15 percent of the average.
Concrete shall be assessed daily for compliance. The contractor shall keep a record at site of all such tests identifying
them with the proportion of the work to which they relate. The Architects will check this record from time to time.
The said record shall give the following details and shall be initiated by the Engineer-in-Charge.
(i) Reference to specific structural member receiving the batch of concrete from which the cubes were cast.
(ii) Mark on cubes.
(iii) Mix of concrete.
(iv) Data and time of casting.
(v) Water cement ratio by weight and slump.
(vi) Crushing strength as obtained at the end of 7 days for 3 cubes out of a set of 6 cubes and the end of 28 days
for the remaining 3 cubes.
(vii) Laboratory in which tested and reference to test certificates.
(viii) The quantity of concrete, incorporated in work that is represented by the quantity of concrete of the set of the
(ix) Any other information required by Architects.
(f) Consistency:
The consistency of each sample of concrete shall be measured immediately after remixing by the slump test. The
slump shall be as directed by the Engineer, which would be based on the preliminary test result keeping in view, the
workability of the concrete. The approved slump shall be maintained through the field operations unless otherwise
directed by the Engineer. In order to ensure the maintenance of uniform consistency, slump tests shall be carried out
as often as demanded by the Engineer and invariably with the batch of concrete from which test cubes are made.
(g) Record of Temperature:
A record of maximum and minimum temperature at the places of storage of the cube shall be maintained, during the
period they remain at site, by the Contractor.
OPTIONAL TESTS:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The Engineer, if he so desires, may order tests to be carried out on cement, sand, coarse aggregate in accordance with
the Indian Code of Practice or any other approved code.
Tests on cement shall include:
(i) Fineness Test,
(ii) Test for Normal Consistency,
(iii) Test for Setting Time,
(iv) Test for Soundness,
(v) Test for Tensile Strength,
(vi) Test for Heat of Hydration (by experiment and by calculations) in accordance with BIS or any other approved
standard for cements.
Test on sand shall include:
(ii) Test for Organic Impurities
(iii) Decantation Test for Determining Clay
(iv) Specific Gravity Test
(v) Test for Sieve Analysis and Fineness Modulus.
Tests on coarse aggregate shall include:
(i) Sieve Analysis
(ii) Specific Gravity and Unit Weight of Dry Loose and Rodded Aggregate (Bulk Density Test)
(iii) Determination of Yield of a Dry Mixture
(iv) Petrographic Examination of Deleterious Minerals in Aggregates.
(v) Test for Aggregate Crushing Value and 10% Fine Value Test.
(vi) Aggregate Impact Value
(vii) Toughness Test
(viii) Soundness Test
(ix) Hardness Test
(x) Alkali Aggregate Reaction
(xi) Deleterious Material
Any or all these test would normally be ordered to be carried out, if the specified concrete strengths are not obtained,
at the Contractor's cost. If the works cubes do not give the stipulated results, the Engineer reserves the right to ask the
Contractor to dismantle such portions of the work, which in his opinion are unacceptable and re-do the work to the
standard stipulated at his (Contractor's) cost. It shall be very clearly understood by the Contractor that no extra claims
shall be entertained by the Owner for excess use of cement over the minimum quantity stipulated to give the works
cubes of required strength. The unit rate for design and test cubes, works cubes, testing them as per specifications,
optional tests etc.
Unless otherwise stipulated, the concreting, testing, etc. shall be carried out as directed by the Engineer and to the
appropriate BIS Specifications. In the event of any work being suspected of faulty materials or workmanship or both,
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
the Engineer before requiring its removal and reconstruction, may order, or the contractor may request, that it should
be load tested in accordance with the following provisions.
LOAD TEST ON MEMBERS OR ANY OTHER TEST:
The test load shall be 125 percent of the specified super imposed load for which the structure was designed in
addition to the full dead load (self weight of structure members plus weight of finishes and walls or partitions, if any
as considered in the design). Such test load shall not be applied before 28 days after the time of placing of concrete.
During the tests, struts strong enough to take the whole load shall be placed in position leaving a gap under the
members. The test load shall be kept for 24 hours before removal.
If within 24 hours of the removal of the load, the structure does not show a recovery of at least 75 percent of the
maximum deflection shown during the 24 hours under load, the test loading shall be repeated after a lapse of at least
72 hours. The structure shall be considered to have failed to pass the test if the recovery after the second test is not at
least 80 percent of the maximum deflection shown during the second test.
If during the test, or upon removal of the load, the structure shows signs of weakness, undue deflection or faulty
construction it shall be reconstructed or strengthened as necessary.
Any other test, e.g. taking out concrete cores, examination and test on such cores removed from such parts of the
members in an approved manner and as directed by the Engineer shall be carried out by the Contractor at his own
cost, if so directed.
TESTING CONCRETE OF TANKS FOR LEAKAGE:
In addition to the structural test given in clause above, structures (tanks, chests, pits, etc.) to be used for storage of
liquids shall also be tested for water tightness at full storage level as described below:
(a) In case of structure whose external faces are exposed such as elevated tanks, the requirements of the test shall be
deemed to be satisfied if the external faces show no sign of leakage or sweating and remain completely dry over the
period of observation of seven days after allowing a seven days period for absorption after filling with water.
(b) In case of structures whose external faces are backfilled and are not accessible for inspection, such as
underground tanks, the tanks shall be filled with water and after the expiry of seven days after the filling; the level of
the surface of the water shall be recorded. The level of water shall be recorded again at subsequent intervals of
hours over a period of 7 days. The total drop in surface level over a period of seven days shall be taken as an
indication of the water tightness of the tank. The Engineer shall decide on the actual permissible rate of this drop in
the surface level, taking into consideration whether the tanks are open or closed and the corresponding effect it has
on evaporation losses. Backfilling shall be withheld till the tanks are tested if directed by the Engineer
Costs of Tests:
The entire cost of tests as specified, in clause above shall be borne by the Contractor.
Unsatisfactory Test:
If the results of any test prove unsatisfactory, the Contractor shall remove and rebuild the member or members
involved or carry out such other remedial measures as may be required by the Engineer or his representative. The
Contractor shall bear the cost of so doing, unless the failure of the member or members to fulfil the test condition is
solely due to faulty design.
The procedure for placing of concrete shall be as follows:
Preparation before placing of concrete shall be as given below.
(i) Engineer's Approval of Equipment & Method:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Before any concrete is placed, the entire placing programme, consisting of equipment, layout, proposed
procedure and methods shall be submitted to the Engineer for approval if so demanded by the Engineer and
no concrete shall be placed until the Engineer's approval has been received.
(ii) Hardened concrete and foreign materials should be removed from the inner surface of the conveying
(iii) Form work shall have been completed; snow, ice and water shall have been removed. Reinforcement shall
have been secured in place, expansion joint material, anchors and other embedded items shall have been
positioned and the entire preparation shall have been approved.
(iv) No concrete shall be placed on watered surface.
(v) Rain or Wash Water:
No concrete shall be placed in wet weather and any concrete that has been washed by heavy rains shall be
entirely removed, if there is any sign of cement and sand having been washed away from the concrete
mixtures. To guard against damage which may be caused by heavy rains, the works shall be covered with
gunny bags immediately after the concrete has been placed in position on the surface of the newly placed
concrete and shall be removed by approved means and no further concrete shall be placed thereon.
a. Time interval between mixing and placing:
Concrete shall be placed in the forms within 30 (thirty) minutes as rapidly as practicable, after addition of water
to cement and aggregate, unless otherwise authorised by the Engineer.
b. Concrete placing by manual labour:
Except when otherwise approved by the Engineer, concrete shall be placed in the shuttering by shovels or other
approved implements and shall not be dropped from a height or handled in a manner, which will cause
segregation. Accumulation of set concrete shall be avoided. Concrete shall be placed directly in its permanent
position and shall not be worked along the shuttering to that position.
c. Avoiding segregation:
Concrete shall, in all cases, be deposited as nearly as practicable directly in its final position, and shall not be
caused to flow in a manner, which will cause segregation, loss of materials and impair its strength. For locations
where direct placement is not possible, and in narrow forms, the Contractor shall provide suitable drop chutes
and "Elephant Trunks" to confine the concrete in movement.
d. Concrete placing by Mechanical Equipment:
The following specification shall apply where placing of concrete by use of mechanical equipment is
specifically called for while inviting bids or is warranted considering the nature of the work involved.
The control of placing shall begin at the mixer discharge. Concrete shall be discharged by the vertical drop into
the middle of the bucket or hopper and this principle of a vertical discharge of concrete shall be adhered to
throughout all stages of delivery until the concrete comes to rest in the structures.
e. Type of Buckets:
Central bottom dump buckets of a type that provides for positive regulation of the amount and rate of deposit of
concrete in all dumping positions shall be employed.
f. Operation of Bucket:
In placing concrete in large open areas, the bucket shall be spotted directly over the position designated and then
lowered for dumping. The open bucket shall just clear the concrete already in place and the height of drop shall
not exceed 1.00 M. The bucket shall be opened slowly to avoid high vertical bounce. Dumping of buckets on the
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
swing, or in any manner which results in segregation of ingredients or disturbances of previously placed
concrete will not be permitted.
g. Placement in Restricted Forms:
Concrete placed in restricted forms by borrows, buggies, cars, short chutes or hand shovelling shall be subject to
the requirement for vertical delivery of limited height to avoid segregation and shall be deposited as nearly as
practicable in its final position to avoid segregation due to rehandling or falling.
Where it is necessary to use transfer chutes between mixer, containers or hoppers, and point of deposit in the
forms, specific approval of the Engineer must be obtained as regards the type, length, slopes, baffles and vertical
terminals. Concrete shall not be permitted to fall from the end of the chutes or tube more than 1.00 M. Chutes,
when approved for use shall have slope not flatter than 1to3 and not steeper than 1to2.
i. Placing by Pumping:
Concrete may be conveyed and placed by mechanically operated pressure equipment only with the written
permission of the Engineer. Water cement ratio may not be increased above that for the same class of concrete
placed by bucket and the slump shall be held to the minimum necessary for conveying concrete by this method.
j. Bonding Mortar:
Immediately before concrete placement begins, prepared surfaces except formwork, which will be in contact
with the concrete to be placed, shall be covered with a bonding mortar as specified.
k. Thickness of Layers:
Concrete shall be placed in successive horizontal layers ranging in thickness from 15 to 90 mm. as directed by
the Engineer the bucket loads, or other units of deposit shall be potted progressively along the face of the layer
with such overlap as will facilitate spreading the layer to uniform depth and texture with a minimum of
shovelling. Any tendency to segregation shall be corrected by shovelling stones into mortar then mortar on the
stones. Such a condition shall be corrected by redesign of mix or other means, as directed by the Engineer.
l. Bedding of layers:
Bedding planes shall be approximately horizontal unless otherwise instructed.
Concrete shall be compacted with approved mechanical vibrating equipment until the concrete has been
consolidated to the maximum practicable density, and is free of pockets of coarse aggregate, and fits tightly
against all form surfaces and embedded materials.
TYPE OF VIBRATORS:
(i) Vibrators shall be the internal or immersion high frequency type, with speed of not less than 6000 revolutions
per minute when immersed in the concrete. Vibrators shall be used in sufficient number of units and power of
each unit shall be adequate to properly consolidate the concrete.
(ii) Use of Vibrators:
Vibrators shall be inserted in a vertical position at intervals of about 600 mm depending upon the mix; the
equipment used, and continued experience on the job. Vibrators shall be withdrawn slowly. In no case shall
vibrators be used to transport concrete inside the forms.
(iii) Successive Batches:
In placing concrete in layers, which are advancing horizontally as the work progresses, great care shall be
exercised to ensure adequate vibration, blending of the concrete between the succeeding batches.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(iv) Vibrator Penetration of under layer:
The vibrator shall penetrate the layer being placed and also penetrate the layer below while under layer is still
plastic to ensure good bond and homogeneity between the two layers and prevent the formation of cold joints.
(v) Vibrating Against Reinforcement:
Care shall be taken to prevent contact of vibrators against reinforcement steel. Vibrators shall not be allowed to
come in contact with reinforcement steel after start of initial set. Vibrators shall not be allowed to come in
contact with forms of finished surface.
(vi) Use of form attached Vibrators:
The use of form attached Vibrators shall be used only with specific authorization of the Engineer.
(vii) Use of Surface Vibrators:
The use of surface vibrators will not be permitted under ordinary conditions. However, for thin slabs such as
highways, runways, and similar construction surface vibration by specially designed vibrators may be permitted,
upon the approval of the Engineer.
(viii) Stone pockets and Mortar Poundage’s:
The formation of stone pockets and mortar poundage in corners and against form face shall not be permitted. If
these occur, they shall be dug out, reformed and refilled to sufficient depth and shape for the rough blending, as
directed by Engineer.
CONSTRUCTION JOINTS AND KEYS:
Concrete shall be placed continuously unless otherwise specified.
If stopping of concreting becomes unavoidable anywhere, the construction joint shall be made, where the work is
stopped, concrete that is in the process of setting shall not be disturbed or shaken by traffic either on the concrete
itself or upon the shuttering. Horizontal and vertical construction joints and bonding keys shall be located and shall
conform in details to the requirements of the plans unless and otherwise directed by the Engineer. Where not
described, the joint shall be in accordance with the following:
(a) Column joint:
In a column, the joint shall be formed 75 mm. below his lowest soffit of the beams joining to it.
(b) Beam and Slab joint:
Concrete in a beam shall be placed throughout without a joint but, if the provision of a joint is unavoidable, the
joint shall be vertical and at the middle of the span. A joint in a slab shall be vertical and parallel to the
principal reinforcement. Where it is unavoidable, the joint at right angles to the principal reinforcement, shall
be vertical and at the middle of the span.
CURING, PROTECTING, REPAIRING AND FINISHING:
All concrete shall be cured by keeping it damp for the period of time required for complete hydration and hardening
Certain types of finish, or preparation for overlaying, concreting must be done at certain stages of the process and
special treatment may be required for specific concrete surface finish.
(i) Curing with water:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Fresh concrete shall be kept continuously wet for a minimum period of at least 21 days since lapse of 24 hours
after laying concrete. Quantity of water supplied shall be controlled so as to prevent the erosion of freshly
placed concrete.
(ii) Continuous Spraying:
Curing shall be assured by use of an ample water supply under pressure in pipes, with all necessary appliances
of hose (sprinklers to be used), unless otherwise specified or approved by the Engineer.
(iii) Alternate Curing Methods:
Whenever, in the judgement of the Engineer, it may be necessary, the continuous spray method may be
omitted and a covering of sand, or other approved mulching such as wet gunny bags, which will prevent loss
of moisture from the concrete, may be used. No type of covering will be approved which should strain or
damage the concrete during or after curing period. Covering shall be kept continuously wet during the curing
(iv) Curing compounds:
Surface coating type-curing compounds shall be used only by special permission of and under the direction of
the Engineer. Curing compounds shall be colourless / pigmented, liquid type, conforming to approved
specifications. No curing compound shall be used on surfaces where future blending with concrete or painting
For curing of concrete in pavement, sidewalks, floors, flat roofs or other level surfaces, the ponding method of
curing is preferred. The method of containing the ponded water shall be approved by the Engineer. Special
attention shall be given to edges and corners of the slabs to ensure proper protection to these areas. The ponded
areas shall be kept continuously filled with water.
(vi) Curing Equipment:
All equipment and materials required for curing shall be on hand and ready for the use before concrete is
(vii) Protection of Fresh Concrete:
Fresh concrete shall be protected by leaving forms in place for an ample period as specified later in this
specification. Newly placed concrete shall be protected by approved means from rain, sun and winds. Steps as
approved by the Engineer shall also be taken to protect immature concrete from damage by debris, excessive
loading, vibration, abrasion or other materials etc. that may impair the strength and/or durability of the
concrete. Workmen shall be warned against and prevented from disturbing green concrete during its setting
period. If it is necessary that workmen enter the area of freshly placed concrete, the Engineer may require that
bridges be placed over the area.
(viii) Repair and Replacement of Unsatisfactory Concrete:
Immediately after the shuttering is removed, the surface of concrete shall be very carefully one over and holes
noticed shall be filled up and made good with mortar composed of one part of cement to one part of sand after
removing any loose stones adhering to the concrete. Concrete surfaces shall be finished as described under the
particular items of work. Superficial honeycombed surfaces shall be made good immediately after removal of
shuttering, in presence of Architect's representative and superficial water and air holes shall be filled in. Unless
otherwise instructed by the Engineer, the surface of the exposed concrete placed against shuttering shall be
rubbed down immediately on removal of shuttering to remove fins or other irregularities.
Unsatisfactory concrete shall be cut out and replaced with new concrete, as soon as practicable after removal
of forms. Anchors, tees, or dovetail slots shall be provided wherever necessary to attach the new material
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
securely in place. Surface of prepared voids shall be wetted for 24 hours immediately before the patching
material is placed. Use of an epoxy for blending fresh concrete used for repairs will be permitted upon written
approval of the Engineer. Epoxies shall be applied in strict accordance with the instructions of the
FINISHING - GENERAL:
The specification is intended to cover the treatment of concrete surfaces of all structures. Area requiring special
finish not covered by this specification may be clearly indicated on the drawings and specifications will be furnished.
(a) Finish for Formed Surfaces:
The type of finish for formed concrete surfaces shall be as follows, unless otherwise specified by the Engineer:
(i) Cement plaster finish:
The concrete shall be properly roughened immediately after the shuttering is removed, taking care to remove
the laitance completely without disturbing concrete. The roughening shall be done by hacking. Before the
surface is plastered, it shall be cleaned and wetted so as to give good bond between concrete and plaster.
(ii) For surface against which backfill or concrete is to be placed, `no’ treatment is required except tie holes &
repair of defective areas shall be patched with cement mortar.
(iii) For surfaces below grade, which will receive waterproofing treatment, the concrete shall be free of surface
irregularities, which would interfere with proper application of the waterproofing material, which may be
specified for use.
(iv) Surfaces which will be exposed when the structure is in service shall receive no special finish except repair of
damaged or defective concrete, removal of fins and abrupt irregularities, filling of holes left by form ties and
rods, and clean up of loose or adhering debris.
Finishing of exposed concrete surface shall conform to the following.
Smooth form finish:
The form facing material shall produce a smooth, hard, uniform texture on the concrete; it may be plywood or
other approved material capable of producing the desired finish. All ties, burns and fins are to be removed.
Mix one part of Portland cement and one part fine sand with sufficient water to produce a stiff mortar. The
mortar after drying shall match the rest of the surface in colour. Before application of mortar, concrete surface
is to be dampened. Mortar is to be applied by firm rubber float or trowel, filling all surface voids. Compressing
mortar into voids by using carborundum stone shall be continued till uniform colour and texture is produced. If
the mortar surface dries too rapidly to permit proper compaction and finishing, apply a small amount of water
with a sprayer. Quoted rate of exposed shuttering shall be inclusive of this treatment.
(c) Finish for Unformed Surfaces:
Surfaces which will be exposed to the weather and which would normally be a specified level, a horizontal
surface or shows the slope required, the tops of narrow surfaces, such as stair treads, walls, curbs and parapets
shall be sloped approximately 10mm in 300mm width, broader surfaces such as walkways, roads, parking
areas and platforms shall be sloped about 1 in 50. Surfaces that will be covered by backfill or concrete, sub-
floors to be covered with concrete topping, terrazzo or quarry tile, and similar surfaces shall be smooth
screened and levelled to produce even surfaces. Surfaces which will not be covered by backfill, concrete or tile
toppings such as outside desks, floors of galleries and sumps, parapet, gutters, sidewalks and slabs shall be
consolidated, screened and flattened. Flattening may be done with hand and started as soon as the screened has
attained a stiffness to permit finishing operations, and shall be the minimum required to produce surface
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
uniform in texture and free from screened marks or other imperfections. Joints and edges shall be tooled as
called for on the drawings or as directed by the Engineer.
(d) Protection:
All concrete shall be protected against damage until final acceptance by the Architect or his representative.
CONCRETING IN HOT WEATHER:
Concreting in extreme hot weather shall be avoided. Special care shall be exercised and measure undertaken when
temperature on site exceeds 105 F or 40 C. Such measures shall include:
(i) Provision of a shade for coarse aggregate so that the same do not absorb heat from the directly indenting rays of
(ii) Continuously wetting coarse aggregates to keep their temperature down, fog sprays.
(iii) Providing a shade for the mixing machine.
(iv) Depositing the concrete from the machine as quickly as possible.
(v) Adjusting water proportions throughout the day to account for water in the wet aggregate, giving desired
strength and workability.
(vi) (Covering the deposited concrete by a membrane as soon after the placing as possible without damaging the
fresh concrete.
(vii) Wet gunny bags shall be laid immediately after two hours of concreting on the top surfaces of slab and shall be
kept wet for curing period.
(viii) Use of retarder (2% of Calcium Chloride).
(ix) Use of Zero Heat Portland Cement or even the Portland Pozzolana Cement.
(x) Use of higher water cement ratio.
(xi) Keep moist, the formwork continuously for the period of 2 hours at least.
On such days of hot weather, concreting records shall be kept of the atmospheric temperature and corresponding
temperatures of concrete discharged from the mixing machine.
CURING OF DIFFERENT ITEMS:
For all the time during construction, curing shall be carried out especially from 7.00 AM to 7.00 PM even on
holidays with proper manpower, necessary pumps and pipe lines, connections, etc.
Exposed surfaces of concrete shall be kept continuously in a damp or wet condition by ponding or by covering with a
layer of sacking, canvas, hessian or similar material and kept constantly wet for at least seven days from the date of
placing concrete in case of OPC and at least 10 days where mineral admixtures or blended cements are used. The
period of curing shall not be less than 10 days for concrete exposed to dry and hot weather conditions. In the case of
concrete where mineral admixtures or blended cements are used it is recommended that above minimum periods may
be extended to 14 days. For the concretes containing PPC or Portland Slag Cements, period of curing may be
The form work shall conform to the shape, lines and dimensions as shown on the drawings and be so constructed as
to remain sufficiently rigid during the placing and compacting of the concrete and shall be sufficiently tight to
prevent loss of slurry.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(a) All forms shall be checked frequently during the concreting operations and until removed so that they may be
driven up if any settlement occurs.
The design, fabrication and erection of formwork are solely the responsibility of the Contractor. The formwork
should be safe and stable to withstand dead load of concrete, men etc. Further, the form should yield security
to the structure or its members.
The selection of materials suitable for formwork shall be based on economy and consistency with safety and
quality required in the finished work. Formwork shall be of timber, plywood, steel or any other materials as
approved by Architect/Engineer-in-Charge whose decision in this respect shall be final. Props and shores shall
be of steel, timber posts, bullies or any other material as approved by Architects.
(c) Chamfer strips shall be placed in corner of forms to produce bevelled edges on permanent exposed surface, if
(d) Temporary openings shall be provided at the base of column forms and wall forms and at other points where
necessary to facilitate cleaning and observation immediately before concrete is placed.
Care should be taken to see that the formwork is perfectly cleaned and two coats of mould oil or any other
approved material is applied before placing the concrete. Such coating shall be insoluble in water, non-staining
and non-injuries to the concrete. It shall not become flaky or be removed by rain or wash water. Block boards
or equivalent shall be used for shuttering columns, beams, etc. and steel sheets for slab shuttering will be
(f) Chamfers and fillets:
All concrete and angles exposed in the finished structure shall be formed with mouldings to form chamfers of
fillets on the finished concrete. The standard dimensions of chamfers and fillets, unless otherwise specified,
shall be 20 mm. Care should be exercised to ensure accurate mouldings. The diagonal face of the moulding
shall be placed or surfaced to the same textures as the forms to which it is attached.
(g) Vertical construction joint chamfers:
Vertical construction joints on faces, which will be exposed at the completion of the project, shall be
chamfered as above except where not permitted by the Engineer for structural or other reasons.
(h) Reuse of Forms:
Before reuse, all forms shall be thoroughly scraped, cleaned, joints examined and when necessary, repaired
and the inside retreated to prevent adhesion, to the satisfaction of the Engineer. The Contractor shall equip
himself with enough shuttering to complete the job in the stipulated time.
(i) The contractor shall record on the drawing or a special register the date upon which the concrete is placed in
each part of the work and the date on which the shuttering in removed there from. Striking of forms in the case
of sides of beams, columns and slabs can be carried out after 24 hours of concreting. The striking of forms
shall be done as para 2.12.4. Striking shall be done with utmost care without shock or vibration by gently
easing the wedges. If, after removing the formwork, it is found that the timber is embedded in the concrete, it
has to be cut out and made good with fine concrete. Due care shall be given to the provision of correct form
work for holes and openings in the slabs, inserts, grounding cables, conduits and pipe sleeves, foundation or
anchor bolts etc. as per approved drawings or as directed by the Engineer.
CLEANING AND TREATMENT OF FORMS:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The forms shall be carefully examined to see that they are vertical and horizontal and the joints are properly closed. If
forms are to be reused, they should be carefully examined before such reuse, properly aligned and open joints shall
be repaired and coated with crude oil. The centring planks for columns shall be joined together and provided with
threaded bolts and nuts.
The centring and props for the various members shall be fixed in a workman like manner to be approved by the
Engineer-in-Charge. They shall be of such size as the Engineer-in-Charge thinks fit and proper. The centring shall be
removed only after the permission has been obtained from the Engineer-in-Charge. Props shall be supported on
wedges placed on planks and the planks shall be 25 mm thick.
All rubbish, particularly chippings, shavings and saw dust shall be removed from the interior of the forms before the
concrete is placed and the form work in contact with the concrete shall be cleaned and thoroughly wetted or treated
with an approved composition. Care shall be taken that such approved composition is kept out of contact with the
(a) In columns of any forms where access to the interior is not available otherwise, a sufficient area of one side
shall be left loose so that it may be removed for cleaning out all chips, dirt, sawdust and other extra
(b) Where the shoring bores on the ground, the Contractor shall spread the load from shores by suitable brick
platforms in order to prevent settlement.
ARCHITECTURAL EXPOSED REINFORCED CEMENT CONCRETE:
Generally specification for reinforced cement concrete work shall also apply to this type of work and additional
specification set-forth below.
(ii) Materials:
(i) Cement used for such work shall be of a uniform colour and obtained from one source of manufacture.
(ii) Aggregate:
a) Fine Aggregates:
Colour being an important consideration for exposed concrete, colour of sand used shall also be uniform
through out the entire construction. Preferably total quantity required for the work shall be collected and well
mixed together to a uniform shade.
b) Coarse Aggregate:
The colour of the aggregate shall be maintained the same through out. Unless otherwise specified, exposed
concrete in walls, fences and parapets which are no-load bearing and are less than 120 mm. in thickness the
maximum size of coarse aggregate shall be limited to 12 mm for which nothing extra shall be admissible.
Flat and flaky pieces shall not be allowed.
(iii) Reinforcement & Cover of the Concrete:
Correct placing of the reinforcement with proper cover is important in all exposed work to avoid
discolouration by rusting. The minimum cover specified in the Specification shall be maintained throughout.
Concrete blocks or spacers shall be sparingly used at exposed surfaces. When used, such blocks shall
preferably be cast on vibrating tables or in some other similar manner so that it may match the concrete
surface in texture and colour. Cover blocks of materials other than precast blocks shall not be allowed to be
(iii) Construction of shuttering:
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
All centring and framework shall be rigid and of robust construction. All vertical props shall be cut square at
ends and shall rest on double wedges, placed on continuous horizontal runners on firm natural soil. Resting of
props or runners on made up soil shall not be permitted on any account. All members of the formwork shall be
closely fixed without any gap between them so as to safeguard against any settlement or displacement of
shuttering at the time of concreting.
i) Timber Shuttering:
Formwork for exposed work shall be of seasoned wrought hard wood timber planks free from loose knots. The
planks shall be 50 mm thick, 100 to 125 mm wide with tongue and groove joints, assembled to a pattern
approved by the Architect. The formwork shall be so constructed, braced, and stayed as to remain absolutely
rigid and true during and after concreting. The boards shall be planed to a suitable thickness in order that the
surface against the concrete shall not be broken at joints between boards. Chamfers, grooves, drips mouldings,
bevelled edges etc. shall be made in the form itself to the size, profiles and details called for on the drawings.
ii) Plywood Shuttering:
The contractor shall provide shuttering quality plywood not less than 12 mm thickness as per IS.4990 (type-I)
of approved make or equivalent approved by the Architect in place of timber plank shuttering mentioned above
for such location as called for by the Architects. The joints in plywood shuttering shall be located as directed
by the Architects. Shuttering, centring and form work for all exposed concrete work like exposed columns,
beams, ribs, slabs, chajjas, facia, walls etc. shall be of such finish and rigidity as to produce all faces fair and
smooth, true to line level and plumb. No rendering or touching shall be permitted on these faces.
iii) Steel shuttering:
Steel shuttering for exposed concrete work shall be made of shuttering plates of standard sizes and to suit the
pattern of exposed concrete indicated in Architect's drawings. The shutter plates used will be made of steel
sheets strengthened at the edges and in middle to prevent sagging or any deflection and concrete deformity or
dents and should fit with each other properly without any space or groove being left between adjacent plates to
avoid and leakage of concrete slurry. If any concrete projects out between plates this will be neatly cut away.
The contractor shall be required to produce details of working showing the general construction of formwork
and panels with details such as nail position and holes for supports that may be required; nail heads shall be
positioned as instructed by the Architects. Grooves and chamfers shall be formed as shown on the drawings
without any extra cost.
Any holes for the supports, which the contractor may need, shall be permitted only if approved by the
Architects. All such holes shall be subsequently filled in carefully as to match with the other surface. Walls,
columns etc. shall generally be cast to the full height in one operation and the formwork shall be provided
accordingly. If permitted by the Architects, these may be completed in two or more heights when the
formwork shall be carefully and correctly raised for further height so as to ensure a neat joint without
disturbing the pattern. Any groove desired by the Architect at the joint shall be provided by the Contractor at
no extra cost. .
(iv) Coating for shuttering:
Shuttering oil, colourless and emulsifiable in water shall be used for oiling the woodwork, when only a thin
film shall be neatly applied avoiding collection at one place. Any mark left by the shuttering oil shall be
(v) Measurements and proportioning of concrete materials:
This shall be as laid down generally for R.C.C. work. In no case extra dust or sand or additional water shall be
allowed with the intention of getting better finish, which shall only be obtained by erecting centring as
specified above and proper vibrating of the mix after placing. In no case, the slump limit, specified in the
Specification shall be exceeded.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(vi) Preparation for placing concrete:
Special care is essential to see that all saw dust, chips, nails or any foreign material is washed out or otherwise
removed from the shuttering.
(vii) Mechanical vibration:
All concrete for exposed concrete work shall be vibrated, using needle vibrators -30/32 mm. Surface or trough
vibrators may be permitted to be used for thin slabs. External vibrators for walls may be allowed but this shall
be done carefully to safeguard the displacement of the shuttering. Vibrators shall only be operated by skilled
labour; over or under vibration shall not be permitted. Any spillage, or leakage, which is unavoidable and
which flows down the exposed concrete surfaces, shall be immediately washed away with clean water and
brush. Exposed concrete members shall be finished to desired surface while the concrete is still green.
(viii) Curing and protection of concrete:
Curing will be done with clean water, so as not to discolour the concrete. All exposed concrete work shall be
properly protected by Alkathene film, gunny bags, wooden boards etc. so the surfaces and edges are not
damaged or discoloured till the entire construction is handed over, at no extra cost. All such damages shall be
set right or replaced by the contractor at his own cost; the contractor is deemed to have considered this in
quoting his rate.
(i) Removal of shuttering:
Striking and removing of formwork for exposed concrete shall be done very carefully without damaging the
surface or edges. All such damages shall be set right or replaced by the contractor as his own cost.
(ii) Finishing:
Finishing of exposed concrete surface shall be as specified.
Exposed concrete surface shall on no account be permitted to any sort of repairs or patching after striking the
formwork. In the event of any portion not coming up to standard, this shall be taken down by the contractor
at no extra cost. Decision of the Architects as to the rejection of such work shall be final and binding on the
STRIPPING TIME:
In normal circumstances (generally where temperatures are above 20 C) and where Ordinary Portland Cement is
used, forms may generally be removed after expiry of following periods:
Type of Formwork Minimum Period Before
Striking Formwork
(a) Vertical formwork to columns, walls, beams 16 - 24 h
(b) Soffit formwork to slabs (Props to be refixed immediately 3 days
after removal of formwork
(c) Soffit formwork to beams (props to be refixed immediately 7 days
after removal of formwork
(d) Props to slabs:
(a) Spanning up to 4.5 m. 7 days
(b) Spanning over 4.5 m. 14 days
(e) Props to beams and arches:
(a) Spanning up to 6 m 14 days
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
(b) Spanning over 6 m 21 days
The number of props left under, their sizes, load and disposition shall be such as to be able to safely carry the full
dead of the slab, beam or arch as the case may be together with live load likely to occur during curing or further
However, this period may be increased or decreased at the discretion of Architects. In case when the cube strengths at
seven days are found to be low or in the cases when other cements are used, the curing period and stripping time for
forms and removal of props may have to be extended. This shall be decided by the Architect and the contractor shall
not claim any extra costs for such increased periods of curing and stripping of forms etc. Special care shall be taken
while removing the cantering of cantilever slab, canopies, portal frames, folded plates construction etc. Stripping
time for such special structure as shell roofs etc. shall be determined from tests of stripping cubes taken especially for
the purpose. These cubes shall give strength of 75% of the 28 days strength.
For rapid hardening cement 3/7 of the above period will be sufficient in all cases except vertical sides of slabs, beams
and columns, which should be retained for 24 hours.
The props left under shall mean that the form work for slabs and beams soffits at 3 days and 7 days respectively can
be removed only if the same can be done without disturbing the props which are required to support the slab or beam
completely. In normal cases this will mean that period for removal of formwork for slabs and beam soffits will be
days and 14 days respectively.
PROCEDURE WHEN REMOVING THE FORMWORK:
All formwork shall be removed without such shock or vibration as would damage the reinforced concrete. Before the
soffit and struts are removed, the concrete surface shall be exposed, where necessary, in order to ascertain that the
concrete has sufficiently hardened. Proper precautions shall be taken to allow for the decrease in the rate of hardening
that occurs with all cements in the cold weather.
It is generally desirable to give forms an upward camber to ensure that the beams do not have a sag when they have
taken up their deflection, but this should not be done unless allowed for in the design calculation of the beams.
The Contractor shall, before putting any concrete in any unit, check all dimensions according to the drawing
governing the accuracy of the dimension of all the units and the necessary formwork shall be approved by the
Engineer-in-charge and if any error is found in dimensions, the Engineer-in-charge will not allow in any case more
than the tolerances specified as below and any unit which does not comply will be liable to rejection at the discretion
the Engineer-in-charge.
The formwork shall be designed and constructed to the shapes, lines and dimensions shown on the drawings within
the tolerances as given below. The tolerances in footings apply to concrete dimensions only and no to positioning of
vertical reinforcing steel or dowels.
(a) Deviation from specified dimensions - 6 mm
of cross sections of columns and beams +12 mm
(b) Deviation from dimensions of footings:
(i) Dimensions in plan -12 mm
(ii) Eccentricity 0.2 times the width of the footing in the
direction of deviation but not more than
(iii) Thickness +0.05 times the specified thickness
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
TRANSPORTING AND PLACING OF CONCRETE:
The concrete shall be mixed in quantities required for immediate use and shall be deposited on the sub-grade/sub-base
to the required depth and width of the pavement section in successive batches and in continuous operation without the
use of intermediate form between the joints. Care shall be taken to see that no segregation of materials results whilst
the concrete is being transported from the mixer to the place where it is to be deposited. The spreading shall be as
uniform as possible to avoid re-handling of concrete. Where, however a certain amount of redistribution is necessary,
it shall be done with shovels and not with the rakes.
While being placed the concrete should be rodded with suitable tools so that formation of voids or honeycomb
pockets is prevented. The concrete shall be well placed and tamped against the forms and along all joints.
COMPACTION OF FLOOR CONCRETE:
The concrete at the side of the forms and between the reinforcements at joints and at corners to be compacted with
internal vibrator (needle vibrators) to avoid honeycombing and to get perfect compaction at these locations.
The vibrating screed shall rest on side forms and it shall be lowered vertically on the concrete surface, (evenly spread
to an appropriate level above the base) to provide the required surcharge for compaction; allowed to remain in
position for few seconds until compaction is completed, then lifted vertically and lowered on to the adjacent strip of
un-compacted concrete. The amplitude of vibration of the screed shall not be less than 1.5 mm and speed of travel not
more than 0.60 m per minute. The screed shall again be taken slowly over the surface, sliding with its axis slightly
fitted away from the direction of sliding and operation repeated until the required dense, close knit textured finish
surface is obtained.
Notes:Precautionary measures to be taken before starting concrete floor.
(a) The working of vibrators shall be regularly checked and standbys shall always be maintained for emergency use.
(b) The segregated particles of coarse aggregates which collect in front of the tamper or screed shall be thrown
outside the forms. Under no circumstances shall such segregated particles be carried forward and pushed on to the
base in front of the mass.
CONCRETE FLOOR FINISHING:
Immediately after completing the compaction by screed vibrator and excess water has disappeared but while the
concrete is still plastic, the floor top surface shall be tested for true-ness with a 3.65 M long straight edge (Aluminum
The straight edge shall be held in successive positions parallel to the guide channels in contact with top surface of
floor laid and the whole area gone over from the one side of the floor to the other. Advance along the floor shall be in
successive stages of not more than one half length of straight edge. Any area of the depressions found shall be
scooped to a depth of 40 to 50 mm filled immediately with freshly mixed concrete, struck, compacted and refinished.
High areas shall be cut down and refinished. The straight edging and re-floating shall continue until the entire surface
is found to be free from observable departures from straight edge and top surface has the required levelled surface.
The floor top surface shall be re-tested for trueness before the concrete begins to set with the 3.60 M long master
straight edge (Aluminum Box Patti). Any irregularity in surface to be rectified.
PREPARATION OF SURFACE AND USE OF FLOOR HARDNER (FIRST DRY SHAKE):
Following types of floor hardeners are used for increasing strength of concrete floors.
• Ironite based
• Silica / Quartz based
• Carborandum based
The quantity of floor hardener shall be used as specified by the Consultants (or as per manufacturers specification)
and according to light / medium / heavy-duty floor as specified.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Scrap the concrete deposited, if any, on the top of side form during concreting. As soon as concrete is firm enough to
support the weight of workmen and their equipment and no water is observed on surface; apply first shake of
hardener evenly using 2/3 of total mix e.g. 2/3 of 7.5 Kg./Smt. Treat areas adjacent to walls and columns first, spread
the materials evenly by sprinkling at right angles in two passes close to floor level. Do not broadcast (spread) the
hardener from a station position but use a wooden scraper to spread the hardener. Alternatively, a mechanical
spreader can be used for better application.
FLOATING: (With Finishing Machine Having DISC)
Power float the shake application promptly, work near wall, columns and door area first. Avoid excessive floating but
ensure that the shake application is completely wetted and incorporated in to the base slab.
C-6 Form work for “off the form exposed concrete surfaces having board marked pattern and time texture.
Relevant specification of form work above (Given in C-5 above) shall be made applicable.
Concrete surface, which are to be “form finish shall be cast in an approved form work and shall be free from
honey combined, fine, projections, and air holes. All external angles to form finish concrete surfaces shall be
chaffed if and as directed. All interesting flush surfaces, surfaces horizontally or vertically between columns and
beams of other structural members shall be separated by grooves if and as directed by the Engineer-in-charge.
The pattern of the form boards, the disposition of construction joints and lifts, and the incorporation of recessed
or raised joints shall be carefully studied by the contractor for its proper implementation.
The contractor shall submit shuttering drawings and details of pattern and the method of forming joints in the
exposed (form finish) concrete to the Engineer-in-charge. For his approval and all changes and modification
specified by the letter shall be appropriated by the former and final approval whereof obtained from the
Engineer-in-charge.
No work of form finished exposed concrete shall be carried out until the contractor has produced acceptable
sample of shuttering and concrete to the approval of the Engineer-in-charge.
Utmost care shall be then be constantly exercised by the contractor in the :
a. Design workmanships and fixing of form work.
b. Control of concrete ingredients, mixing and placing.
c. Adequate technical supervision of all process involved.
Listed below are some form work specifications, for form finished exposed concrete to be used on site as directed by
the Engineer-in-charge.
i. Smooth Board Surfaces :
The smooth board marked surfaces are produced by new dressed tongued and grooved boards of
uniform thickness of not less than 45 mm. These boards should be brought and dressed on both faces
as well as on all side.
ii. Rough Board Surfaces :
A rough texture is obtained by the use of new sawn boards with dressed square edges.
Steel Mould Surface:
Steel moulds must be rigid enough are perfectly plane and clean. They must be painted with a protective
point and absolutely free from rust or have a special section at their edges to prevent cement leakage and produce a
water tight joint.
This type of form work is to be entrusted to a skilled and specialized manufacture who has produce
satisfactorily similar form work and who must be approved by the Engineer-in-charge.
In all type of form work to form finished exposed concrete. Only non-staining mould oil supplied by an
approved manufacturer will be used.
The repetitive usages of the same form work to cast form finished exposed concrete shall be as decided by the
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Engineer-in-charge and no case form work not guaranteed to produce the required form finish to the satisfaction of
the Engineer-in-charge shall be used.
The exposed concrete shall have uniform finish. The finish of the concrete when shuttering and form work is
removed will generally be without blemish and will be such as will not require touch up. Slight touch up a small work
or two if necessary shall be carried out immediately on removal of form work by 1.1 proportions. This shall be carried
out expertly on removal of form work with entire surface.
C-7 Fabricating placing reinforcement in position :
The reinforcement bars shall be out to be required length including necessary bends hooks, overlaps, etc. as shown on
the plan or as directed by the Engineer-in-charge and shall conform to I.S. 2502-1963 or as revised from time to time.
Details of length and bending diagrams shall be got approved from the Engineer-in-charge.
Placing and Binding:
All reinforcement shall be accurately placed in position with spacing as shown in the drawing and firmly held so
during placing and setting of concrete. The bars shall be tied diagonally both ways, at all inter-sections with M.S.
binding wire of 1.22mm or 1.63mm dia (16 or 18 gauge). Spot welding instead of tying brass by wires will be
permitted by the Engineer-in-charge, if required. Spacing of bars shall be maintained by means of stays, blocks, tiles,
spacers, hangers or other approved supports or devices at sufficiently close intervals.
All bars protruding from concrete to which other bars are to be spliced and which are likely to be exposed for
indefinite period shall be protected from rusting by thin coat of cement wash.
Welding (instead of overlaps) by gas or electricity will be permitted under suitable conditions and with suitable safe-
guards. In case such permission is granted, relevant Indian Standards for welding of steel reinforcement bars
including carrying out necessary tests shall be followed.
No concrete shall be deposited unless the Engineer-in-charge has inspected the reinforcement work, recorded
measurements, and given permission to place the concrete. After the approval of the reinforcement by the Engineer-
in-charge, it will be the contractor’s responsibility to see that reinforcement is not disturbed from its position till the
concreting is completed.
C-8 Fixing Expansion Joints :
The expansion joints shall be provided in R.C.C. structural members:
1. For the joints between twin internal beams of RCC frame structure, copper strip of 1.5mm thickness and
width and shape as shown in the detailed drawing shall be placed near the bottom in the first beam such
that one Kg. of the specified width is embedded in the beam and “U” fold (of 80mm depth unless
otherwise specified) will come in the joint.
The “U” shape gap of the copper strip shall be filled with poured bituminous joint filler and nearly
finished on top. Before casting of the jointing member pre-molded bitumen joint filler or required
thickness shall be placed in position as directed and concrete then cast, embedding the other leg.
2. The joint between the twin terrace beam shall be prepared in a manner similar to (1) above except that the
raised concrete edge shall be provided and the copper plate shall be fixed in the raised edge as directed. It
shall be covered by lead flushing 1.5mm thick fixed to one seat with copper screws to the wood blocks
embedded in the concrete as shown in the detailed drawing.
3. For the joints between twin internal or external columns, white casting the first column, one leg of each
of the copper strips of 1.5mm thickness shall be embedded into the column and “U” fold will come in the
joints nearer the exterior faces of the column. The copper strips shall be fixed with hold fast of copper rod
as shown in the detailed drawing. Before casting the second column pre-molded bituminous joint filler
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
shall be placed against the face of the first column all along between the two steps as directed by the
Engineer-in-charge.
C-9 Constructing Brick masonry :
Classification of brick work :
The bricks work shall be classified as first sort or second sort according as first class and second class brick
respectively are used.
Welting of Bricks:
Bricks required for masonry shall be thoroughly wetted with clean water for at least two hours before use or as
directed by the Engineer-in- charge. The cessations of bubbles, when the bricks are wetted with water, are an
indication of through wetting of bricks.
Bricksshall be laid in English bond directed otherwise.
Half or cut bricks shall not be used except when necessary to complete the bond. Closers in such cases shall be cut to
required size and used near the ends of walls. A layer of mortar shall be spread on full width for suitable length of the
lower course. Each brick shall first be properly bedded and set home by gentle tapping with handle or wooden mallet.
It’s inside face shall be flashed with mortar before the next brick is laid and pressed against it. On completion of
course, the vertical joints shall be fully filled from the top with mortar.
The walls shall be taken up truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be truly
vertical. Vertical joints in alternate course will generally directly one over the other. The thickness of brick courses
shall be kept uniform. The bricks shall be laid with frogs upwards. A set or tools comprising of wooden straight edge,
masons spirit level square half meter cub and pins string and plumb shall be kept on the site of work for frequent
checking during the progress of work.
Both the faces of thickness greater than 23 cm shall be kept in proper plane. All the connected brick work shall be
carried up nearly at the level and no portion of the work shall be left more than one meter below the rest of the work.
Where this is not possible, the work shall be racked back according to bond (and not left toothed) at angle not steeper
than 45 degrees.
All fixtures, pipes, outlets of water hold fasts of doors and windows etc. which are required to be built in wall shall be
embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joints shall not exceed 12 mm. The face
joints shall be racked as directed by racking tool, daily during the progress of work, when the mortar is steel green so
as to provide key for plaster or pointing to be done.
The face of brick work shall be cleaned on the same day the brick work is laid and mortar dropping shall be removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period of
seven days, the top of masonry work shall be kept well wetted at the close of the day.
The supports or scaffoldings shall be sound and strong tied together with horizontal pieces over which the scaffolding
planks shall be fixed. Single scaffolding shall be allowed normally in this case inner end of the horizontal scaffolding
pole shall rest in a whole header course only. Only one headed for each pole shall be left out. Such holes shall not
however, be allowed in pillars under one meter in width. The holes left in masonry shall be filled and made good
before plastering.
The contractor shall be responsible for providing and maintaining sufficient strong scaffolding so as to withstand all
loads likely to come upon it.
C-10 Construction of brick masonry partition walls :
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The partition walls shall be half brick.
(A) All the bricks shall be laid stretcher wise breaking joints with those in the upper and lower course. The wall
shall be taken truly plumbed. All courses shall be laid truly horizontal and all of vertical joints will be truly vertical.
The bricks will be laid with frog upwards. Fixtures, plugs holdfasts, frames of doors, windows etc. shall be housed in
the brick work while laying only and at the correct levels and position. Holes of required size and shapes shall be left
in the brick work for fixing pipes or service lines etc. After service lines etc. are fixed, the extra hollow left in the hole
shall be filled with 1:3 cement mortar or 1:3:6 cement concrete. A set of mason’s tools shall be maintained on work as
required for frequent checking. The ends of walls shall be bonded into the side walls where necessary joints, curing
and scaffolding shall be as per C-10 of code of practice.
(B) Laying 2 numbers of mild steel bars of 6mm diameter in brick masonry partition walls. Two mild steel
reinforcement bars of 6mm diameter shall be used longitudinally at every fourth course of the brick work. The first
reinforcement shall be placed on the top of bottom most course. The bars shall be fully embedded in the mortar and
the end shall be properly bonded in the vertical joints of brick work or to the main wall as directed by the Engineer-
in-charge. Bars shall be of length equal 45 times diameter of mild steel bars. The joints in the course, where
reinforcement is placed, shall be admitted the mortar cover of at least 5mm in thickness of the reinforcement.
C-11 Constructing Brick Masonry Cavity Walls :
The cavity wall shall be constructed with 2 Nos. 90mm thick reinforced brick partition with cavity of 50mm in
between wall shall be connected with metallic walls ties.
Reinforced Brick Partition:
Wall ties shall be of mild steel bars of 6mm dia of the shape as directed by the Engineer-in-charge. The wall ties shall
be placed at not more than 800mm apart horizontally and not more than 500mm vertically and shall be placed
staggered. Before placing the ties same shall be dripped in hot tar and sanded to protect from rust. The additional ties
shall be placed at the opening.
The bond used for each skin or leaf of a cavity wall shall be stretcher bond. Flemish bond or any other arrangement of
bricks shall not be used during erecting of wall. Sufficient care shall be taken to keep the wall ties and cavity free
from mortar dropping, 25mm thick and 40mm wide teak wood batten shall be placed across the wall ties and raised as
each row of ties are raised for reducing the mortar dropping in the cavity. The temporary openings shall be provided
to permit the daily removal of mortar dropping from the bottom of cavity. At the points where the two leaves of the
hollow wall come into contact or above the lintels of doors and windows and at solid at jambs, necessary damp proof
membrane of approved quality shall be provided as per the direction of Engineer-in-charge. Except as above the work
in general shall be executed as per provision of I.S. 2212-1962 or as revised from time to time so far applicable.
C-12 Preparing and fixing doors, windows and ventilators, teak wood paneled or Glazed or partly paneled
and partly glazed.
The code covers the requirement of preparation of doors, windows, & ventilators with frames and their supply and
They shall be made on site of work only.
All members of frame shall be exactly at right angle shall be checked form inside surface of the respective members.
All members of frames shall be straight without any wrap and shall have smooth surface well planned on the three
sides exposed at right angle to each other. The surface touching the wall may not be planned unless it is required in
order to strengthen up the members or to obtain the overall sizes within tolerance as specified.
Frames shall have overall joints when ventilator is included it shall be provided by having full length one piece post
for door or window and ventilator extending the frame on top of the head to the required extent. Horns shall not be
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
provided in the head of the frame when no sills are provided the vertical post of the frame in the ground floor shall be
embedded in the sill masonry for 100mm. On upper floors the vertical posts shall be fixed in the floor by forming
notches 10mm deep. Slight adjustment of spacing as necessary shall be done to have the holdfasts in the joints of
masonry course. The frame shall be done to have the holdfast in the joints of masonry course. The frame shall be
erected in position to hold plump with strong supports from both sides and built in masonry as it is being built. The
transom shall be thorough tended into the mortises of the jamb post to the full width of the jamb post and the
thickness of the tendon shall be not less than 15mm. There shall be closely fitted into the mortise and suitably pinned
with wood dowels not less than 10mm diameter. The depth of rebate for housing the shutter shall be as shown in
detailed drawings or as directed by the Engineer-in-charge.
The contact surfaced or tendon and mortises shall be treated before putting together with an adhesive of approved
M.S. hold fasts shall be protected with a coating of primer. The surface of frame abutting the masonry or concrete a
faces shall be properly treated by applying a coat of approved premier coal tar shall not be used for this purpose.
Paneled shutters shall be constructed in the form of timber frame work of styles and rails with panel inserted of type
as specified in the item of work. Panel shall be fixed by providing grooves in the style and rail. The styles and rails
shall be jointed to each other by mortise and tendon joint at right angles.
All members of the shutters shall be straight without any wrap or how and shall have smooth well planned faced of
right angles to each other.
Styles and rails of shutters shall be made out of one piece only.
Schedule of fixtures and fastening for Doors, Windows, Ventilators, Wardrobe, and Cupboards.
Da- Teakwood doors fully paneled or fully glazed or partly paneled and partly glazed.
Db- Bathroom & W.C. door with single shutter.
Si- Single shutter.
B- Breadth of door shutter.
T- Thickness of door shutter.
900 above 970 mm
Sr. Particular of Fixture & Size in mm Da. Da. Db.SI
No. Fastening. SI:B:900 SI:B:900
1 Hold fast 150x16x3m 4 6
2 But hinges 10 3 3
3 Sliding door bolts 300x16 1 - -
4 Tower bolts (Barrel bolts) 200x10 1 1 -
5 Tower bolts (Barrel bolts) 150x10 - - -
6 Door latch 260x16x5 1 1
7 Handles 100 2 2
8 Door stopper 75 1 1 -
Timber Paneling:
Thickness of the panel shall be as specified in item. When made from more than one place, as shown in the drawing
or as directed by the Engineer-in- charge, the places shall be finished as shown in the detailed drawings and shall be
jointed with specified size of plywood filled. The end pieces of the panel and the top and bottom of the panel shall be
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
provided with continuous tongue to frame is into groove of the frame of shutter. An air space of 15mm will be left
groove of frame of shutter while framing the panels in it.
The faces of the panel as well as various pieces of the panel shall be closely fitted to the side of the grooves.
Finishing of the corners of raised panel edges shall be done as shown on drawings or as directed by the Engineer-in-
Glass Paneling:
The glass panels shall be embedded putty and secured to the rebate of wooden beads or moldings of shape and size as
approved with counter sunk screws of suitable size.
Fixtures & Fastenings:
All fixtures and fastenings shall be fixed with appropriate screws in sound and efficient manner to ensure easy
operation. They shall be appropriately positioned and shall be truly horizontal of vertical as required.
Height of the shutter shall be such as not allow clearness of more than 6mm above the flooring level.
C-13 Lime Brick bat Concrete :
This shall be as per C-2 of code of practice. The brick bats shall conform to M-12.
The glass panels shall be properly cut to fit the rebates of the fames and sashes truly with a slight minus margin of
about 1.5mm on all sides. Before glazing, the frames shall be primed and prepared for painting so that wood may not
draw oil out of putty. The rebate shall be putted to an extent to provide bedding all around the glass edges.
The glass shall then be bedded in putty and fitted with wooden beads or molding as directed and secured with counter
The size of the rebate in the frame and size and shape of beads or moldings shall be as per detailed drawings or as
directed by the Engineer-in-charge. The beads or moldings shall have mitered corners. The glazing in metal frame
shall be done in the same way as in wooden frames. Except as stated above glazing in metal frames shall be done as
specified in I.S. 1081-1960 pr as revised from time to time.
C-15 Oil Painting / Synthetic Enamel Painting :
Preparation of surfaces:
The surface to be painted shall be thoroughly.
The screw shall be spaced not more than 100mm from each corner and not more than 200mm apart clean and rubbed
smooth with sand paper to bring it is none plane, when finished. No scratches for sand paper should be shown.
This shall be applied in 2 coats as per normal practice. After preparing surface as above one coat of white oil paint
shall be applied as priming coat. After priming coat, all small holes, cracks, open joints and similar other minor
defects of every kind shall be stopped with putty made from pure whiting mixed to the appropriate consistency with
raw linseed oil little white lead being worked in after mixing to help in hardening of putty.
The work shall be little rubbed down smooth with sand paper and the consequent coats of paint of the specified shade
approved by the Engineer-in- charge shall be applied. The paint shall be applied with brush. It shall be spread as
smoothly as possible. Final coat shall be very carefully crossed and laid off, so that brush marks are not visible.. Each
coat of paint shall be allowed to dry thoroughly and shall be little rubbed down for the next one is laid. Finished
surface shall now show any hair marks, ridges or dry patches of paints and no puddles shall be left in the corner of
panels’ angle of molding etc.
C-16 French Polishing :
French polish to be used shall conform to I.S. 348-1968 in the requirement of quality.
Preparation of surface:
All unevenness shall be rubbed down to smoothness with sand paper and the surface shall be well dusted. The wood
to be polished should be first painted with a filler by mixing whiting in hyphenated spirit to obtain a good glossy
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
surface shall be again rubbed down perfectly smooth with paper.
The number of coats of polished to be applied shall be as specified in the item. On the wood work thus treated a thin
coat of French polish shall be applied by a pad of woolen cloth covered by fine cloth. The pad shall be moisture with
polish rubbed hard on the surface in a series of over lapping circles applying the polish sparingly but uniformly over
the entire area to give an even surface. A trace of linseed oil on the face of the pad facilitates that operation. The
surface shall be allowed to dry and the remaining coats applied in the same way to finish off the pad should be
covered with a fresh piece of clean fine cloth, slightly dumped with mentholated spirit, and rubbed lightly and quickly
with circular motions. The finished surface shall have a uniform texture and high gloss.
C-17 Laying in Situ Cement Concrete Flooring (I.P.S.) :
The flooring shall be provided with ordinary cement concrete 1:2:4 (1- cement: 2- coarse sand & 4- graded stone
aggregate 20 mm nominal size). The work of plain cement concrete 1: 2: 4 shall be carried out as per C-2 above. The
thickness flooring shall be specified in the item of work.
The surface of the sub-grade shall be cleaned and all loose materials and moistened immediately before laying
The concrete shall be laid immediately after mixing white being placed, the concrete shall be vigorously sliced and
spaced with suitable tools to prevent formation of voids or honey comp pockets. The concrete shall be brought to the
specified levels by means of heavy straight edge resting on the side forms and drawn ahead with a sawing motion in
combination with a series of lifts and drops alternating with small lateral shifts immediately after laying concrete the
surface shall be checked for high or low sports and any needed corrections made up by adding or removing the
concrete. After striking off the surface it shall be compacted with wooden float. The blows shall be fairly heavy in the
beginning but as consolidation takes place light rapid strokes shall be given to complete the ramming. The floating
shall be followed by steel traveling after concrete has hardened sufficiently to prevent excess of fine material from
working to the surface. The finish shall be brought to a smooth and even surface free from defects and blemishes and
tested with a straight edges. Dry cement or mixture of dry cement and sand shall not be sprinkled directly on the
surface to absorb moisture or to stiffen the mix. After the concrete has dried, sufficiently to allow rendering to a thin
floating coat of neat cement slurry uniformly floated.
If so specified in the item of a work approved mineral colour, pigment shall be added to cement mortar to give mortar
rendering is sufficiently stiff lines may be marked on it so specified or directed. With strings or any other devices to
give the appearance of 250 mm x 250mm tiles of any other size diagonally or square as directed. The junctions of
floor with the walls shall be rounded off, if so directed.
Curing shall start on the next day after finishing and shall be continued for fourteen days.
C-18 Laying In-Situ Terrazzo Flooring :
Under layer of cement concrete:
The under layer shall be laid as described in C-17 of the code of practice except that only black trap grit shall be used
in place of coarse aggregate and no finishing shall be done to make the surface smooth. The compacted thickness of
concrete under layer shall be as specified in the item. This layer shall be laid to the require level and grade. The top
surface of the under layer concrete shall be kept sufficiently rough to form a key to the top layer.
Dividing strips shall be fixed on the base to the exact surface level of floor so as to divide the surface of the base into
the required arrangement of panels. Anchorage arrangement shall be provided either by fixing 4 cms. Long cross nails
through the strips or by cutting the edge as directed.
Before spreading the under layers the base shall be cleaned of all dirt laitance or loose material and than well wetted
with water without forming any water pools on the surface it shall then be smeared with cement slurry just before the
spreading of under layer.
After application of cement slurry, the under layer shall be spread and leveled with a
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Screening board. This slightly rough surface left by the screening board will form a satisfactory key for the terrazzo.
Mixing of Materials:
Mixing shall be done manually in a tub. To avoid variation in colour the complete quantity of cement and pigment
required for one operation shall be mixed at the beginning of the work and stored properly.
Where the different colour chips are used they shall be well mixed in required proportion of various colour and size.
Coloured cement may be ready mix or properly mixed at site. White cement (with or without pigment as directed) or
colour cement and marble powder shall be in the proportion of 3 parts of cement and 1 part of marble powder by
weight. For every part of this marble mix, the proportion of the aggregate by volume shall be ½ parts.
While mixing the aggregates care shall be taken not to get the materials into a heap as this would result in the coarsest
chips failing to the edge of the heap and the cement working to the centre at the bottom. The materials shall be kept,
as far as possible in an even layer during mixing.
After the materials have been through mixed in the dry state, water shall be added in small quantities; preferably in a
fine spray while the materials are being proper consistency is obtained. The mixing shall be plastic but not so wet that
it will flow; a rough indication for the addition of proper quantity of water in the mix is that it shall be capable of
being molded when squeezed in hand without water flowing out. The mix shall be used in the work within half an
hour of the addition of water during preparation.
Laying Terrazzo Topping:
Terrazzo topping shall be laid while the under layer is still plastic but it has hardened sufficiently to prevent cement
from rising to the surface, this is normally achieved between 18 to 24 hours after the under layer has been laid. A
cement slurry preferably of the same colour as the topping shall be brushed on the surface immediately before lying is
commenced. If possible, the entire work of laying the topping shall be completed at one stretch.
The terrazzo mix shall be placed on the screed bed and be compacted thoroughly by tamping or rolling and toweled
smooth. The time interval allowed between each successive toweling is important at only that much toweling which is
just sufficient to give a level surface is needed immediately after laying. Further compacting shall be carried out at
intervals, the amount depending upon the temperature and rate of set of the cement. Excessive trowelling or rolling in
early stages shall be avoided as this will tend to work up cement to the surface which produce a finish liable to
cracking and will also necessitate more grinding of surface to expose the marble chips.
The surface shall then be rammed in order to consolidate the terrazzo, it is not sufficient just to “float” lightly, as this
would cause depression which rave to be filled with mortar. A piece of smooth marble stone of size 15 cm x 2.5 cm
may be advantageously used for ramming. Following the rammer a trowel may be used. When using the trowel, the
object should be make the surface level smooth with a little use of the float as possible relying upon pressure rather
than upon a trowelling action to achieve this end. Rolling will be easier than tamping and patting, but a rolled terrazzo
is more like to crack since the roller would draw the cement to the surface unless the mixture is very dry. The best
results will be obtained by tamping combined with a minimum of trowelling. The compaction shall ensure that air
bubbles are cleared from the mix.
The surface shall be left dry for air curing for duration of 12 to 18 hours depending upon atmospheric temperature
conditions. It shall then be cured by allowing water to stand in pools over it for a period of not less than four days.
Precautions shall also be taken to prevent the floor from being subject to extreme temperature.
The grinding processing and polishing of terrazzo may be commended not less than 7 days from the time of
completion of laying. The grinding shall be done by machine only. The filling shall be done with a grout using the
same coloured cement (without marble powder) as it is original max for terrazzo topping and a portion of the
coloured cement shall be kept for this purpose when the floor is laid and this will make sure that patches do not differ
in appearance from the remainder of the floor.
After the first grinding is done, the surface shall be washed clean and grouted with neat coloured or white cement
grout as the case may be of creak like consistency. It shall be allowed to dry for 24 hours and watered for 4 days. The
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
second, third and fourth grinding shall be done in the above manner excepting that the grinding shall be done with
finer carborundum stones as directed for each successive grinding.
The floor shall finally be washed clean with dilute oxalic acid solution and dried. In case wax polished surface is
required by the Engineer-in-charge. The wax polish shall be sparingly applied with soft Indian on the clean and dry
surface then the polishing machine fitted with bobs shall be run over it. Clean saw dust shall then be spread over the
floor and polishing machine again applied, mopping us surplus wax and leaving glossy surface. Care shall be taken
that the floor is not slippery.
C-19 Laying and finishing of Marble / granite slab Flooring :
The marble stone flooring shall be laid on the cement mortar bedding with neat cement finishing.
Proportion of mix:
The cement mortar bedding shall be as per M-9 of specification of materials in 1:6 proportions of cement and sand by
volume unless otherwise specified in item of work.
Preparation of Bed of cement Mortar:
The bed of cement mortar shall be laid on the compacted base to reasonably true plane surface and to the required
slopes. Care shall be taken in preparing ring the mortar bed to ensure that there are no hard lumens that would
interfere with the sub-floor or base shall be cleaned of all dirt, scum, or laitance and of loose materials and then well
wetted without forming any pool of water on the surface. All points of level for the finished paying surface shall be
marked out. The mortar shall then be evenly and smoothly spread over the based by the use of screed battens only
over so much area as will be covered with slabs within half an hour. The thickness of the mortar bedding shall not be
less than 20 mm and not more than 25mm. The required slope shall be given to the bed.
Fixing stone slab:
Before laying the marble stone slab shall be thoroughly wetted with water, neat cement grout of honey like
consistency shall be spread on the mortar bed over as much area as could be covered with the slab within half an
hour. Marble slab shall be laid on the neat cement float and shall be evenly and firmly bedded to the required level
and slope on the mortar bed. Each slab shall be generally tapped with a wooden mallet till it is firmly and properly
bedded. There shall be no hollows left. If there is a hollow sound on gently tapping of the slab such slab shall be
removed and reset properly. The joints shall be of uniform thickness and in straight line. The joint shall not be more
than 1.5mm thick and filled solidly with mortar, for their full depth. The joints shall be struck smooth but there shall
be no smearing or mortar over the slabs. The slabs shall be laid so as to give continuous parallel long joint with cross
joint at night angles to them. The edges of the adjoining slabs shall be in one plane when the slabs cover open edges
of the floor or window, sills the edges shall be neatly rounded off.
When pointing is to be done the joints shall be pointed with cement screening of the colour matching the colour of the
marble stone slabs. The cement mortar spread on the marble slabs shall be cleared immediately after pointing.
The flooring shall be kept well wetted with the damp & or water fourteen days.
The polishing shall be done generally by polishing machine. After the floor is completely dry a hot mixture of
turpentine and bees wax (4:1 by weight) shall be applied to the surface and rubbed clean with cotton waste.
Wherever big area of floor are to be tiled the level of the central portion of the floor shall be kept about 10 mm higher
than the level marked at the walls unless specified otherwise.
C-20 Laying Kotah stone flooring paving :
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Before spreading the mortar, the sub base of the floor shall be cleaned of all dirt, scum, and loose materials and then
well wetted without forming any pools of water on the surface.
In case of R.C.C. floors, the top shall be left a little rough. All points of level for the finished surface shall be marked
out. The mortar shall then by evenly and smoothly spread over the base. Bedding layer of cement mortar in
proportion 1:6 or 1:3 shall not be less than 20 mm or 12 mm average.
Before laying the stones, they shall be thoroughly wetted with water. Neat cement grout of required consistency shall
be spread on the mortar bed. The stones shall be laid on the neat cement fiber and shall be evenly and firmly bedded
to the required level and slope. There shall no hollows left the joints shall be uniform thickness and in straight lines.
They shall be filled solidly with a mortar / cement slurry for the full depth. The points shall be struck smooth. But
there shall be no smearing of mortar over the stones. When pointing is to be done, the joints shall be racked out for
not less than the width of the joints while the mortar is steel green. The flooring shall be in true plane.
The thickness of joints shall normally be as follows unless otherwise specified or :
(i) Polished kotah stone with fine chisel 1.55mm dressed edges.
(ii) Rough kotah stone with dressed 8 mm to 12 mm edges.
The flooring shall be kept wetted with damp sand or water for fourteen days. It shall be kept undisturbed at least for
Flooring shall be thoroughly cleaned as directed by the Engineer-in- charge.
The polishing shall be done generally by polishing machine. After the floor is completely dry a hot mixture of
turpentine and bees wax (4:1 by weight) shall be applied to the surface and rubbed clean with cotton waste.
Wherever big area of floor are to be tiled the level of the central portion of the floor shall be kept about 10 mm higher
than the level marked at the walls unless specified otherwise.
C-21 Laying Dholpur Stone paving :
This shall be as per C-20 of code of practice as applicable to rough kotah stone. The stone in this case shall be
C-22 Laying and finishing of cement concrete flooring tiles :
The work shall be carried out as per IS 1443-1972 or as revised from time to time as far as is applicable.
Before laying the tiles they shall be thoroughly wetted with water. Neat cement grout of required consistency shall be
spread on the mortar bed. The tiles shall be laid on the neat cement float and shall be evenly and finally bedded to the
required level and slope as per pattern given during the execution of the work. There shall be no hollows left. The
joints shall be of uniform thickness and in straight line as per the pattern.
The flooring shall be kept wetted with damp sand or water for fourteen days. It shall be kept undisturbed at least for
After the tiles are properly cured, it shall be polished by machine and shall be waxed to give thoroughly polished even
surface. If any part of the building like doors, windows etc. is spoiled or damaged, it shall be repaired to its original
condition by the contractor at his own cost.
C-23 Laying & Finishing to marble/granite skirting or dedo :
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The work consists of laying of marble stone slab, skirting or dedo in cement mortar.
Preparation of surface:
Before fixing marble stone slab on brick or concrete wall the wall surface shall first be wetted with water. Thereafter
about 10mm thick backing of cement mortar in the specified proportion shall be applied on the surface in true line and
level generally as per C-31 or practice.
The back of each marble stone slab, to be fixed shall be smeared with cement paste of matching colour and the marble
stone slab shall then be gently tapped against wall with a wooden mallet. The skirting shall be done only after the
flooring is completed. Any pipe coming out of the wall through the marble stone slab of dedo or skirting shall be
approximately so positioned that is centre shall only be at the intersection of horizontal and vertical joints. The tiles
shall not have staggered joints, the joints shall be true to centre line both way and the vertical joints shall be in line
with the joint is in the marble stone flooring. The joints shall not be more than 1.5 mm thick. Each marble stone slab
shall be fired as close as possible to the one adjoining and any difference in the thickness of the marble stone slab
shall be even out in the cement paste. So that the entire tile faces are set in conformity with one another. The skirting
shall project uniformly and not more than half the tile thickness beyond the finished surface above.
Curing shall be done as per C-22 of Code of practice.
Skirting and dedo will be hand polished to have an even smooth and shining surface chamfering shall be done on the
junction of cement plaster and cement tiles.
C-24 Laying and finishing of kotah stone skirting or dedo :
This shall be carried out as per C-20 of code of practice except that the skirting or dedo in this case shall be of
polished kotah stone and joints shall be 15mm in case of stones with machine cut edges and 3 mm in case of fine
chiseled dressed edges.
C-25 Laying & finishing of in Situ Terrazzo Skirting or Dedo :
Under layer of concrete mixing of materials laying terrazzo topping curing and grinding shall be as per C-18 of Code
of practice except that the grinding will have to be done manually and the skirting / dedo shall not project more than
7mm and the plaster at the junction at top shall be leveled suitably.
C-26 Laying & Finishing of cement concrete tiles skirting or dedo :
This shall be carried out as per C-23 of code of practice except that the skirting or dedo in the case will be of cement
concrete tiles and that joints shall be fitted in with slurry of matching colour cement.
C-27 Laying White Glazed Tiles / Ceramic vitrified tiles flooring :
Mortar shall give sufficient plasticity for laying and there shall be no hard lumps that would interfere with the
evenness of bedding. The base shall be cleaned and well wetted. The mortar then shall be spread in thickness not less
than 12 mm and not more than 20mm to have a required slope.
The tiles before laying shall be soaked in water for at least two hours. Neat cement grout of honey like consistency
shall be spread over the mortar beddings as directed. The edges of the tiles shall be smeared with neat white cement
slurry. The tiles shall be well pressed and gently trove with a wooden mallet till it is property bedded and in level with
the adjoining tiles. There shall be no hollows in bed or joints between the tiles shall not exceed 1.0 mm.
The tiles shall not have staged joints. The joint shall be true to centre line both way. The nahni trap coming in the
flooring shall be positioned that its grating shall replace only one tile. After fixing the tiles finally in an even plane,
the flooring shall be kept wet and allowed to mature undisturbed for 14 days.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The surplus cement grout that may have come out of the joints shall be cleaned off before it sets. Once the floor has
set it shall be carefully washed cleaned by dilute acid and dire proper precautions and measures shall be taken to
ensure that the tiles are not damaged any way till the completion of the construction work.
C-28 Laying White glazed tiles / vitrified tiles skirting or dedo :
This shall be carried out as per C-27 of code of practice except that the skirting or dedo in this case shall be of white
glazed tiles and the edges of the tiles shall be smeared with and fixed in with neat white cement slurry.
C-29 Laying Tar felt treatment :
The tar felting shall be done on smooth surface previously preparing for making them water proof and damp proof.
Prepare of surfaces:
The surface on which the tar felt is to be laid shall be cleaned with brush and all dust and foreign materials removed.
Any cracks in the surface shall be cut to V- section, cleaned and filled up flush with cement and slurry or a suitable
grade of bitumen or both.
The five layers of the treatment shall be laid as under.
The first coat of bitumen primer shall be applied as directed by the Engineer-in- charge. The second and fourth coats
shall be of hot blown bitumen of approved grade applied at the rate of 1.5 kg. Per sq.mtr.
The third layer shall be of the fiber base self finished felt. The felt shall be laid as mentioned below:
(a) The felt shall be first cut to required length, brushed clean of dusting materials and laid out flat on a
level, dry and clean surface.
(b) After the surface has been prepared and cement rendering and the corner fillets have set and a primer
coat has been applied, the strip of tare felt for laying is rolled up.
(c) The rolled up felt is laid on one end of the floor, the hot bonding materials is prepared on to the floor
in front of it across the full width of the felt, which is then unrolled gradually with a slight pressure to
squeeze out the excess bitumen fit and final coat shall be of screened grave or grit laid at the rate of
0.008 cmt / sq.cmt.
The water proofing treatment shall be continuous through out as far as possible. However, where the points are
unavoidable the minimum over lapping shall be 100mm and the joints shall be made perfectly water tight.
C-30 Cement pointing :
The joints shall be brushed clean of dust and loose particles with a stiff brush. The area shall be washed and the joints
thoroughly wetted before pointing is commenced. The racking out of joint shall be 20mm deep. The surface shall be
applied with two coats of Geru wash.
The racked out joints shall be filled with cement mortar as specified in the item. The mortar shall be of required
consistency & well pressed and rubbed smooth. The pointing shall be flush or as directed by the Engineer-in-charge.
C-31 Application of cement plaster finish :
Preparatory work:
The smooth surface of concrete / masonry shall be suitable roughened to provide necessary bond. All dirt, swat,
oil, or any others material that might interfere with satisfactory be shall be removed. The surface shall be cleaned and
scrubbed with fresh water and kept wet for 6 hours prior to plastering. It shall be kept damp during the progress of the
Patches of plaster 150mm x 150mm shall be put on above 3 mtr. Apart as gauges to ensure even plastering in one
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Plastering: (a) BASE COAT:
In all plaster work, the mortar shall be firmly applied with some what more than required thickness and well pressed
into the joints and the surface rubbed and leveled with a flat wooden rule to give required thickness. Long straight
edges shall be freely used to ensure a perfectly plane and even surface. All corners shall be finished their true angles
or founded as directed by the Engineer-in-charge. The surface shall be finished to plane or curved surface as shown
on the plan or as directed by the Engineer-in-charge and shall present a neat appearance. The mortar shall adhere to
the concrete surface firmly when set and there shall be no hollow when struck. Cement plastering shall be done in
squares or strips as directed. Plastering shall be done from top down wards. All exposed angles and junctions with
door frame etc. shall be carefully finished.
(b) FINISHING COAT:
Finishing coat shall be provided to the plaster as specified. A coat of cement slurry shall be applied to the plaster
surface with a trowel to provide uniform texture while the base coat is still plastic. In any continuous faced of a wall,
finishing treatment should be carried out continuously and day to day breaks made to coincide with architectural
breaks in order to avoid unsightly injunction. All tools and accessories used in plaster work shall be cleaned by
scraping and washing at the end of each day's works after use. Metal tools shall be cleaned after operation.
(c) Watering & Curing:
All plaster work shall be kept damp continuously for a period of fourteen days.
C-32 Application of Water proof cement plaster :
The cement plaster of specified thickness shall be provided in cement mortar with integral cement water proofing
compound of approved quality.
The plastering work of specified thickness shall be done as per C-31 of Code of practice. Except that while preparing
the cement mortar, the approved water proofing compound at the rate 1 kg / 1 bag as per manufacturers specifications
of cement shall be added while mixing the mortar. The contractor shall bring the water proof materials to site of work
in their original packing the water proofing material shall be mixed in dry cement and sufficient care shall be taken
while mixing to see that the water proofing materials gets integrally mixed with the cement and does not run out
separately when water is added.
C-33 Application of sand faced plaster :
The base coat plaster shall be of cement mortar of specified properties and thickness. The base coat shall be laid in a
similar manner of laying plaster as per C-31 of code of practice. However, instead of finishing the top surface smooth
keys shall be formed on the surface by thoroughly combing it with way horizontal lines about 12mm apart and about
3 mm deep when the mortar is still plastics. The base coat shall be cured for minimum 2 days.
Second coat shall be cement mortar with specified kind of cement and specified preparation of thickness. The coat
shall be applied evenly in true lines and level by using approved quality of coarse and the surface shall be finished
with a wooden float. The necessary rubber sponge as approved by the Engineer-in-charge shall be applied over this
coat to obtain the surface textures as per previously approved sample.
When the finishing coat has hardened, the surface shall be kept watered continuously for 14 days.
C-34 Application of coloured cement plaster :
The plaster shall be applied in two coats namely base coat and finishing coat. The base coat of thickness specified in
the item shall be applied as per that under C-31 of Code of Practice. The finishing coat shall be thickness as specified
in the item and shall be carried out as per that under C-31 of Code of Practice except that cement of colour and shade
as approved by the Engineer-in-charge shall be used.
C-35 Laying and finishing stone veneering / Lining :
The code covers the requirement of preparing the Dholapur stone of machine polished machine cut edge for stone
veneering, lining including laying and finishing.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The exposed veneering / lining face of the stones shall be double machine polished patches or streaks on the face shall
not be allowed. The machine cut machine polished stones shall be provided with appropriate six rectangular groove
on the top edge to receive one leg of gun metal cramp.
The groove shall be positioned centrally thickness wise or as directed by the Engineer-in-charge.
Circular holes of appropriate depth in the vertical edges shall be provided to receive 6mm diameter copper pin dowels
of 75mm length. The holes shall be positioned as directed by the Engineer-in-charge.
The samples of stones prepared as above shall be first got approved from the Engineer-in-charge. In case wax
polished surface is designed the wax polish shall be sparingly applied with soft linen on the clean and dry surface and
clean saw dust shall then be spread over the surface, and the sample wax mopped up, leaving glossy surface. Care
shall be exercised to see that the wax shall not at all stain the edges.
The stones shall be well wetted before laying while applying mortar for fixing the stones in position, no chips or
filling of any short shall be used. The surface to be veneered shall be cleaned of all dirt, maintenances of loose
materials and then will wet with water.
The stones shall be secured to the backing by channeled shape gum metal cramps, 30 cm long, 25mm wide and 6mm
thick. The legs of the channel shall be 25 cm high. The adjoining stone shall be secured to each other by 6mm dia
75mm long copper pin dowels. The swamps and pin dowels shall be spaced not more than 600mm apart. The samples
of pin, dowels and cramps shall be got approved form the Engineer-in-charge. One end of the cramp shall be
positioned in the groove in the top edge of the stone and the other end in the joint of the brick masonry at the back.
The pin dowel shall remain inserted in the adjoining stone so that equal length remains in each stone.
The pin dowels and cramps shall be laid in cement mortar of cement and fine sand in proportions as specified in the
While laying face work all care shall be taken to see that the edges and corners of the stones are not damage in any
way and that the stone face are not disfigured or stained or any indentation formed on the face if any stone is damaged
in any of the above way the same shall be replaced by unblemished and work redone.
The pattern of stone veneering shall be as per the detailed drawing or as directed by the Engineer-in-charge. Few
samples of finished stone veneering shall be prepared by the contractor for the approval of the Engineer-in-charge.
The work shall be carried out solely in conformity with the approved sample.
The backing joints shall be filled with cement mortar of appropriate proportion and shall be of thickness not more
than 10 mm. All these joints shall be full of mortar if any hollow grounding is detected by tapping the stone this shall
be taken out and re-laid properly without hollow. The backing joint shall be carried out simultaneously with the face
The thickness of the face joints shall not exceed 5mm or as directed by the Engineer-in-charge. The face joints shall
be uniform through out. A uniform recess of 10mm depth from face shall be left with the help of steel plates sections.
The cement to be used for face joints shall be of matching colour and shade as approved by the Engineer-in-charge.
In case of cement concrete backing, the stone shall be secured with backing after it has set and got cured. The craps
shall be fixed in concrete in the required position while laying.
The method of executing this work shall be got approved from the Engineer-in- charge in all its details such as
scaffoldings, method of handlings transporting keeping in position of stones, manner and operational phasing of
applying the back joints etc. in submitting the data, the contractor shall give due weight age and consideration to the
face that the work is to be carried out at a very great height and such other critical factors.
The curing shall be carried out continuously for 14 days and if possible curing may be carried out by providing
perforated pipes horizontally laid.
The face work shall be cleaned off all mortar markings, stain etc.
The face joints of the veneering shall be neat, true to line i.e. perfectly horizontal and perfectly vertical. The face
work shall be truly in plane. It shall present a neat appearance.
C-36 Application of flat paint :
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The surface on which the flat paint is to be applied shall be thoroughly cleaned of all mortar droppings, dust, algae,
grease, and other foreign matter by brushing. The holes and undulations shall be filled up with plaster of Paris and
rubbed smooth. The surface so prepared shall be got approved from the Engineer-in-charge prior to painting work is
Application of paint :
The specified primer shall be applied with brush in an uniform layer over the surface prepared as above.
Painting coats:
Flat paint shall be applied with brushes when the surface is dry, Paint shall be applied in even and uniform layers. The
number of coats shall be specified in the item of work. Each coat shall be allowed to dry overnight and lightly rubbed
with very fine grade of sand paper and loose particles shall be brushed off before the next coat is applied. The paint
shall be applied evenly and smoothly by brushes with crossing and laying process. The crossing and laying process
shall consist of covering the area over with paint and then painting alternatively in opposite direction two or three
times and then finally painting lightly in a direction at right angle to the same. This entire process of crossing and
laying shall constitute one coat.
No hair marks or clogging of paint puddle in corners etc. shall be left on the surface.
All wood work, glazing, floors etc. shall be protected by covering and stains meals, splashing, if any shall be removed
and any damage done shall be made good by the contractor at his cost.
C-37 While Washing or Colour Washing :
Lime shall be dissolved with sufficient quantity of water (about 4 to 5 liters per kg. of lime) thoroughly mixed and
stirred to attain consistency within screen. The wash shall be strained through a clean cloth. Clean colour dissolved in
hot water shall be added in suitable proportion Indigo will be added to obtain required white tint.
Preparation of Surface:
The surface shall be prepared by removing the mortar droppings and foreign matter and thoroughly cleaned with a
wire or fiber brush or any other suitable means as directed by the Engineer-in-charge. All loose pieces and scale shall
be scrapped off and holes filled with mortar.
Application of white wash:
On the surface so prepared the white wash shall be laid with brush. The first coat shall be from top downwards, and
similarly second coat shall be from the right to the left or to right. Each coat must be allowed to dry before the laid it
shall present smooth and uniform finish free from brush marks and it should not come off easily when rubbed with
Splashing and dropping, if any, on the doors, windows, ventilators etc. shall be removed and the surface cleaned.
Colour wash shall be prepared by adding necessary approved colour matter of the white wash which has been strained
and prepared as above. Other provisions as mentioned in white wash shall apply for colour wash.
C-38 Constructing Cooking Platform: (Kitchen, Pantry, Services etc.)
The code covers constructing platform for kitchen service meant for other similar work purpose.
The cooking platform shall have following components.
(a) Raised Masonry platform of specified height and width as required :
The vertical face of masonry shall be covered with 12mm thick plaster. The top surface work, cement
plaster and I.P.S. specified thickness. The masonry work, cement plaster and I.P.S. shall be as per C-9, C-
31 & C-17 respectively of this code of practice.
(b) Partition wall :
Hall brick partition wall duly plastered on the faces as per detailed drawings or as directed by the
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Engineer-in-charge shall be carried out as per C-12 and C-31 of code of practice.
(c) Cooking Platform Proper:
This shall be of R.C.C. slab topped with Double polished Telephone black Granite Stone with exposed
machine cut edges. The size of various components and kind of stone shall be as specified as per detailed
drawings or as directed by the Engineer-in-charge.
The work of cement concrete and reinforcement for 75mm thick slab shall be executed as per C-4, C-6
and C-7 of code of practice.
The vertical exposed face of the slab shall also be veneered with matching stone. The top of the slab shall
be suitably slopped towards sink as directed. The veneering shall be provided such that the edge of the
veneering shall not be less than 10 mm above the finished surface of the platform.
C-39 Application of Anti Termite Treatment :
The purpose of providing the treatment is to create a chemical barrier between the ground from where the termites
come and wood work cellulose material and other components of building, which may from food for the termite. The
treatment is expected to provide complete chemical barrier all around, which will prevent the termite from reaching
the super structure of the building and its contents, it may, therefore be understood clearly and distinctly that this is a
very important treatment is to be given to the building and therefore has to be carried out through specialized firms
only having established reputation and reputed past performance. The name of such specialized firms shall have to be
got approved from the Engineer-in- charge. Use of chemical and method of treatment shall be as detailed below:
(1) Chemical and Preparation :
(a) The chemicals used for soil treatment shall be any one or a combination of the following with the
concentration shown against each in emulsion :
Chemicals Concentration
Aldrin 0.51% (by weight)
Heptachlor 0.5%
(b) The dilution guide for preparing the emulsions is given below :
Emulsion liters
Aldrin30 EC Dieldrin 18 EC Chlordane 75 BC Heptachlor 29 20 EC
(2) Treatment of column pits, wall, trenches & basement excavation :
The bottom surface and (up to a height of 300mm from the bottom) of the excavation made for
column pits, trenches, and basements shall be treated with the chemical emulsion mentioned above at
5 lit. As per sq.mtr of surface area.
(3) Treatment to backfill earth :
After the column foundation, wall foundation, and retaining walls of the basement come up the
backfill in immediate contract with the foundation structure shall be treated with the chemical
emulsion at the rate of 15 lit. Per sq.m. of the vertical surface of the structure for each side. The
selected earth is to be refilled in layers and the treatment shall be carried out in similar stage.
Chemical emulsion shall be directed towards the concrete or masonry surface of the columns and
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
walls so that the earth in contract with this surface is well treated with the chemical.
(4) Treatment of top surface of plinth filling :
After the earth filling is completed with plinth area and before dry sand packing of sub grade is laid,
the entire surface of the filled earth shall be treated with chemical emulsion at 5 lit. per sq.m.
Light rodding of the surface may be carried out to facilitate proper absorption of the emulsion.
(5) Treatment at junction of walls and floor :
Special care shall be taken to establish continuity the vertical chemical barrier on inner wall surface
from the ground level (where it has stopped with the treatment described in 3 above) up to the level
of the filled earth surface. To achieve this a small channel 3x3 cm shall be made at all the junctions
of wall and columns with the floor (Before laying the sub-grade) and rod holes made in the channel
up to the ground level 15 cm apart and the road moved backward and forward to break up the earth
and chemical emulsion poured along the channel at the rate of 45 lit. per sq.m. of the area of the
vertical surface of the sub- structure so as to soak the soil right to the bottom. The soil should be
temped back into place after this operation.
(6) When the building is completed in all respects or when the plinth protection work is commenced.
Whichever is earlier, the earth around the external perimeter of the building up to a depth of 30 cm.
shall be finally treated at the rate of 4.5 liters per running meter of the plinth wall. To facilitate this
treatment, solid M.S. rods should be driven into the soil as close as possible to the plinth wall at
intervals of 15 cm. and up to a depth of 30 cm. and the rods moved backward and forward in a
direction parallel to the wall to break up the earth so that the chemical emulsion mixes immediately
(7) Treatment of soil surrounded pipes wastes and conduits :
When the pipes wet and conduits enter in side the area of the foundation, the soil surrounding the
point of entry must be loose around in such pipe, waste of conduit for a distance of 15 cm. and up to
a depth of 7.50 cm. before treatment is commenced. When they enter the soil external to the
foundation, they shall be similar treated unless they stand clear of the walls of the building by about
7.5 cm. for a distance of over 30 cm.
(8) Spraying Equipment :
A pressure pump shall be used to carry out spraying operations to facilitate proper penetration of
chemical into earth.
Guarantee of Anti-Termite Treatment:
The treatment against termite infestation shall remain fully effective for a period of not less than ten years from the
date of issue of the final certificate of completion of the work. If at any time during this period, any defect in any part
of the building or structure is noticed, the contractor shall have to rectify defects within fifteen days of receipt of the
notice from Engineer-in-charge. On the contractor’s failure to do so the Engineer-in-charge may get the same
rectified through any other agency at the contractors risk and cost and the decision of the Engineer-in-charge as the
cost payable by the contractor for the same shall be final and binding to the contractor.
A guarantee bond on appropriately stamped papers shall be given by the contractor to the department in the manner
and form as prescribed below:
Form of Guarantee Bond:
I/We (contractor) hereby guarantee that the work will remain unexpected and will not be in any way damaged by
white ant or any other germs of similar types for a period of 10 (ten) years after completion of the work of anti-
termite treatment as per terms and condition of the contract and the contractor hereby identifies and agree to save
harmless and GIDC from any loss and /or damage that might be caused on account of white ant and/or other similar
type of germs and hereby guarantees to make good and loss or damages suffered by GIDC and further guarantees to
redo the defective work without claiming any extra cost.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
This guarantee shall remain in force for the period of 10 years from the completion of the work under the contract
and it shall remain binding the contractor for the said period of 10 (ten) years.
The deposit at the rate of 5% of the cost of this item from the running and final bill shall be recovered and shall be
refunded only after the completion of the guarantee period.
C-40 Laying and fixing Galvanized Iron Pipes with fittings :
The trench of laying the pipes shall be excavated true to lines and levels as shown on the plans or as directed by the
Engineer-in-charge. The bed of the trench shall be made even. Unless otherwise specified as instructed by the
Engineer-in-charge. The trenches shall be excavated 30 cms. Wide and not less than 45 cms. Deep. All pipes, water
mains, cables etc. met in the excavation shall be carefully protected and supported. Any damages done shall be made
good by the contractor at his own cost. The refilling work in the trenches shall be done in layers and shall be properly
rammed except at joints. The refilling at joints shall be done after satisfactory testing of joints and on approval of the
Engineer-in-charge. Suitable additional filling shall be done to account for subsequent settlement. Any surplus
excavated stuff shall be disposed off as directed.
Laying & Fixing:
The completed lay out of the water supply system of the building shall be got approved from the Engineer-in-charge.
The pipes shall be laid plumb, and in straight and parallel lines unless directed otherwise.
In making the joints few turns of line hemp smeared with white zinc shall be taken over the threaded end of the pipes
and the socket shall be fastened with a pipe wrench. When the pipe is to be fixed clear to the walls, it shall be fixed
with standard brackets or clips held by wooden blocks. The supporting brackets clips etc. for the pipes shall be
spaced at an interval of 1 mtr. Or as directed.
Whenever such pipe is to be taken through wall or slab, suitable square hole shall be driven in the wall or slab
carefully without damaging the reinforcement or slab. After the pipe is laid, the hole shall be made good with cement
concrete and cement mortar. Finishing shall be done similar to wall and slab finishing.
The pipes laid under ground shall be painted with one coat of hot asphalt.
On completion of laying the pipe line shall be tested for any leakage at the joints. The defects if any revealed after
test shall be remedied to the satisfaction of the Engineer-in-charge.
C-41 Fixing Wash basin :
The code covers fulfilling of wash basin including assembling and fixing brass chromium plated pillar cock, cast iron
cantilever brackets, rubber plug, chromium plated brass chain, chromium plated brass stop cock, chromium plated
brass waste coupling 32mm diameter, P.V.C. bottle trap, P.V.C. connection etc.
The wash basin shall be fixed on the wall at the location and level as shown on the detail drawing or as directed by
the Engineer-in-charge. The wash basin shall be supported on brackets fixed to the wall with wooden cleats and
screws. The size of the brackets shall be as per detailed drawings or as directed by the Engineer-in-charge. The
brackets shall be securely fixed to the wall and the basin fixed on the brackets.
The PVC bottle trap and union shall be fixed in the hole waste kept at the bottom of wash basin. It shall be ensured
that the joints are water tight. This bottle trap shall be then coupled with the waste water pipe.
The waste pipe of required length shall run through the wall. If holes are not left in the wall, they shall be cut and the
chase surrounding the pipe made good after fixing the pipe.
C.P. brass stop cock of required size shall be fixed in the supply line. PVC flexible pipe of required diameter shall be
provided for supply of water from stopcock to pillar cock. The joints of PVC connections shall be made water tight.
The pillar cock shall be fixed on the hole provided in the wash basin. Chain and rubber plug shall be fixed in the hole
provided in the wash basin.
The exposed pipe & CI brackets shall be painted with one coat of red lead and three coats of approved oil paints as
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
per C-15 of this code.
The wash basin shall be with one tap hole unless otherwise specified in the item or as directed by the Engineer-in-
charge and the case when the tap holes are more than one, equivalent number of taps and allied provisions shall be
provided & appropriately connected as directed by the Engineer-in-charge.
C-42 Fixing Indian Type Water Closet :
The water closet pan shall be fixed into the place indicated on the drawing or as directed by the Engineer. The vent
and soil pipe shall run through the holes left in wall and the wall made good. If holes not left in the wall, they shall be
cut and the cavity surroundings the pipe made good properly after fixing the pipes. The pan shall be placed into
position with the trap jointed in cement mortar 1:11 and the connecting pipes duly connected including the flush
pipes from the flush cock. The jointing of cast iron pipes with the trap shall be with 1:1 cement mortar as directed.
Brick bat cement concrete 1.5:10 shall be cast and pressed around the embedded surface of the pan fittings and pipes
to get a solid embedment without any hollows. The whole are for W.C. shall be provided with 1.5:10 blocks bat
cement concrete. The pan shall be fixed at slightly lower level than the floor level of the general flooring which
should slope on side towards the pan. The pan shall be fixed such that its top glazed ring around under the
surrounding flooring shall be in the same level. After the flooring is completed the rectangular foot rests shall be
fixed in cement mortar 1:1
C-43 Fixing Orissa Type Water Closet Pan :
The work shall be carried out as per C -41 of the code of practice except that the Orissa type water closet pan shall be
provided instead of Indian type water closet pan and that the separate foot rests are not provided.
C-44 Fixing European Type Water Closet:
The European type water closet pan and the low level flushing tank shall be fixed at the places indicated on drawing
of as directed by the Engineer-in-charge. The vest and soil pipe shall run through the holes left in the wall and floor.
If the holes are not left in wall and floor, they will be cut. The cavity surrounding the pipes shall be made good
properly after fixing the pipe. The pan shall be fixed into the position in cement mortar 1:1 (1-cement: 1-sand) with
connecting pipe duly connected including flush pipe from the cistern. The joints at the lid then shall be fixed to the
pan with chromium plated hinges. The brackets shall be painted with white enamel paint.
C-45 Fixing of urinal :
This code includes fixing of floor mounted wall type urinal necessary spreader arrangement chromium plated pipe
connection with stop cock and C.P. brass tap etc. The wall urinal shall be fixed on to the wall as per the detailed
drawing or as directed by the Engineer-in-charge in mortar. The floor slab in not shall be suitably sunk to receive the
wall urinal. Where the floor slab is not sunk, the wall urinal shall be provided over platform. The lip of the wall
urinal shall be flushed with the finished plan level adjacent to it. The wall urinal shall be laid over a fine sand cushion
of average25mm thickness. A space of not less than 3 mm shall be provided all around in front and side and filled
with water proofing compound of approved quality.
The C.P. brass trap shall be fixed as directed by the Engineer-in-charge and the trap shall be connected with
necessary C.I. waste pipe, the waste pipe shall run through the wall or outside of the wall if necessary.
C.P. brass stop cock of specified diameter shall be provided as shown in the detailed drawing or as directed by the
Engineer-in-charge. Chromium plated flushing pipe of specified diameter and length shall be provided and fixed with
the stop cock and spreading arrangement.
Spreading arrangement shall be made by providing a spreader nozzle at the end of flushing pipe.
C-46 Fixing Nahni Trap :
The Nahni trap with bend and pipe price up to the outside face of the wall and grating as specified shall be fixed as
per drawing or instruction of the Engineer-in-charge. The joints shall be sealed with cement mortar.
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
The hole shall be kept in the floor and masonry if not left and the same be made good properly after the nahni trap
and pipe are fixed. The nahni trap in the white glazed tiles flooring shall be positioned that its grating shall replace
C-47 Fixing of Gully Trap :
The gully trap shall be set into 1:4:8 cement concrete extending 300 mm beyond the trap on three sides over which
shall be constructed one brick masonry chamber of the dimensions indicated on the drawings or as directed by the
Engineer-in-charge. The building wall will be the fourth side. The brick masonry shall be constructed in cement
mortar 1:3.The inside shall be plastered with cement mortar 1:3. The top lid of pre-cast concrete cover of 40mm
thickness of required size shall be provided on the chamber as directed. The trap in the chamber shall have cast iron
C-48 Fixing Cast Iron Pipes :
The code covers fixing of pipes on walls, filling joints with cement mortar 1:1. Cast iron pipe shall be secured to the
face of wall at all joints by standard holder bat clamp.
The bat clamps shall consist of a cast iron base with a projecting shaped lug, to the web of which the 2 semi circular
halves of the flat iron clamps are bolted. The base of the holder bat clamps shall be screwed on a pair of wooden
plugs fixed in the wall with wood screws driven through the holes in the base. The screws shall be not less than
75mm long for80mm diameter pipe and 100 mm long for 100 mm dia pipe. The plugs shall be fixed in the wall to
depth of 150mm in cement mortar 1:2 (1-cement: 2- fine sand) centrally to the holes in the base in the base of the bat
clamps and with the front face projecting to such a length from the brick face that when the bat clamps is fixed the
outer face of its base shall be flush with the plaster face of wall. The plugs shall be 110 mm x 50 mm wide at face
increasing to 160mm x 70mm wide at rear and shall be 70 mm deep throughout.
Laying of pipe & specials:
The pipes before being laid, shall be examined to see that there are no cracks or defects. Care shall be taken to clean
the pipes inside of the socket and outside of the spigot. Spigot of the upper pipe shall be properly fitted in the socket
of the lower pipe. The depth of the annular space between socket and spigot shall be filled in with cement mortar 1:1.
The joints shall be finished smooth and shall be flush with the top ring or the socket.
The joints of the horizontal pipes running below flooring shall also be filled with cement mortar 1:1.The joints ends
of the pipe coming out of the wall shall be provided with required specials, such as Tees, “Y” bends etc. with or
without inspection eyes as required and all the joints shall be filled with cement mortar 1:1 as above.
The pipe lines shall be truly vertical or to lines and slopping as directed and shall be at a uniform distance of 20mm
from the finished face of the wall.
C-49 Fixing Asbestos Cement pipes :
The provision made in C-48 of code of practice shall be followed in this case also excepting the following changes:
(1) Instead of cast iron pipes, this code provides for fixing of asbestos cement pipes.
(2) The joints shall be filled in with stiff cement mortar 1:1 (1-cement: 1- fine sand) instead of lead
(3) The joints shall be finished smooth at top at an angel of 45 degree sloped up with cement mortar and
will be cured for period of 7 days by tying piece of gunny bags to the joints keeping it wet.
C-50 Laying & stoneware pipe :
The trench shall be excavated to the exact grading and 450mm wide or as directed by the Engineer-in-charge. The
bottom of the trench shall be trimmed off to present a plane surface and excavation below joints shall be taken
sufficiently deep so as to accommodate the socket of pipe and all irregularities shall be removed.
Before laying the pipes all pipes and fittings shall be inspected and shall be rung with a light hammer to detect
cracks. The pipe shall then be laid in trench to the alignment, levels and gradients as shown. The spigot end of one
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
pipe shall be centered in the socket and of other pipe with socket up the gradient. The cutting of pipe for insetting fit
or close pipe shall be done in neat and workmanship like manner.
Jointing of pipe:
The stoneware pipe shall be jointed with cement mortar 1:1 (1-cement: 1- sand). The jointing shall be done as
In each joint spun yarn socked in a neat cement slurry shall be passed round the joint and inserted init by means of a
caulking tool. Yarn so rammed as shall not occupy more than ¼ the of the depth of socket. Cement mortar 1:1 (1-
cement: 1-sand) prepared as per M-11 of specification of materials. The mortar shall be slightly moistened and shall
be inserted by hand into remaining space of the joint after yarn. The mortar shall then be caulked into the jointed with
a caulking tool. More cement mortar shall be added until the space of the joint has been completely filled with
The joint shall then be finished off neatly outside the socket at angle of 45 degree.
The cement mortar joint shall be cured for seven days.
The pipe line shall be tested for leakage before refilling of the trenches etc.
After satisfactory testing the trenches shall be back filled as per C-53 of code of practice.
C-51 Constructing Inspection Chamber:
This code covers excavation for foundation, laying of cement concrete bedding brick masonry wall with cement
plaster on inside surface, cement concrete, benching (channel) fixing of inspection chamber frame and cover R.C.C.
The inspection chamber shall be of size as specified in the item or as shown on the drawing or as directed by the
Engineer. The various components shall be executed as detailed below.
The excavation shall be done as per C-1 of code of practice or as directed by the Engineer-in-charge so as to have at
least 150mm offset from outside face of the brick masonry.
Cement concrete:
The bedding of 150mm thick cement concrete shall be done as per C-2 of code of practice.
One thick brick masonry wall in cement mortar 1:6 shall be done as per C-10 of code of practice.
Plain cement concrete for benching (channel) of required thickness shall be done as per C-17 of code of practice.
Cement plaster:
Cement plaster work shall be carried out as per C-31 of code of practice, cast iron frame shall be fixed in the slab and
then concrete shall be cast. Concrete work shall be finished with cement mortar 1:3 (1-cement: 3 sand)
Pre-cast RCC slab with C.I. manhole cover & Frame:
C.I. manhole cover shall be placed into the CI frame fixed in the slab. It shall be painted with one coat of red lead
paint and two coats of black oil paint.
Cement plaster:
Cement plaster work shall be carried out as per C-31 of code of practice. Cast iron frame shall be fixed in the slab
and then concrete shall be cast. Concrete work shall be finished with cement mortar 1:4 (1-cement: 4- sand).
C-52 Filling in plinth with selected materials :
Sign of contractor Chief officer
NA,GIDC,Por-ramangamdi
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document.pdf
Form B-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .