| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.4 CrAccepted-AOC | ₹72.4 Cr | L1 | Accepted-AOC Lowest Rate (L1) |
| 2 | L2₹83.0 CrRejected-Finance | ₹83.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹88 CrRejected-Finance | ₹88 Cr | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
8 Dec 2023, 11:00 amClosed
EE, Resources Divn., PHE Dte.
Janaswasthya Karigari Bhawan (NIJALAYA), 2nd Floor, CN8, Street Number 18, CN Block, Sector V, Bidhannagar, Pin-700091
Supplying,laying of 9 nos zone Distribution System including specials,valves pipe carrying structure,Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC schedule 80 20mm OD HDPE PE100,PN16 pipe with all necessary spec
2023_PHED_592375_1
WBPHED/EE/RS/e16/2023-24/3rdCl
Open Tender
CIVIL WORKS
2555 days
Kolkata
Please Refer Tender Documents
5 documents required · 5 mandatory
₹50 L
Janaswasthya Karigari Bhawan (NIJALAYA), CN8
24 Dec 2025
13 Oct 2023
11 Dec 2023
13 Oct 2023
8 Dec 2023
14 Oct 2023
2 Nov 2023
Amount
Supplying, laying of 9 nos zone Distribution System including specials, valves & pipe carrying structure, Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, 10 mm gun metal ferrule (dept. supply), saddle piece etc. all complete, Construction of 9 Nos. various capacities of 20 Mtr. staging height RCC Over Head Reservoir including pile foundation, pipe connection and cost of pipes, specials., Soil Investigation for the work of construction of OHR, Construction of Switch room cum Chlorine Room Including Chlorination & Sanitary Arrangement, Boundary Wall, Service Road for 50 M length, Improvement of Land for each site, Renovation of 4 nos. Existing OHRs. surface Drain, Campus lighting & other provisional works etc for Pingla Block on EPC turnkey basis in a single package as per detail scope of work / direction of the E-I-C including 6(six) months Trial Run and Operation & Maintenance for 5(five) years for SURFACE WATER BASED PIPED WATER SUPPLY SCHEME for Pingla Block, District Paschim & Purba Medinipur under Western Circle, PHE Dte. (Phase-I)
GBC INFRASTRUCTURE PRIVATE LIMITED
AVIAN INFRASTRUCTURE AND ENERGY PVT
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf