Loading…
Loading…
Tender Value
₹2.8 L
EMD Value
₹7,093
Closing Date
9 Oct 2026, 11:00 am7d left
Assistant Executive Engineer
Assistant Executive Engineer O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram. Thiruvananthapuram 695033
GENERAL PTC compound wall and cladding stone work-Reconstruction of compound wall and providing and fixing cladding stones on gate pillars at Police Training college Thiruvananthapuram General Civil Work
2026_PWD_874370_1
PWD/BLDG/TR/15082/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹630
Yes
₹7,093
Yes
29 Sept 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11 | |||||
| 1.001 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 14.88 | cum | - | - |
| 1.002 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 3.8 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.33 | cum | - | - |
| 1.004 | OD137961/2026-2027:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.56 | cum | - | - |
| 1.005 | OD137962/2026-2027:Random rubble masonry with departmental hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.42 | cum | - | - |
| 1.006 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 18.46 | sqm | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 188.37 | kilogram | - | - |
| 1.008 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.09 | cum | - | - |
| 1.009 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1.51 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
declaration.pdf
Tender Documents • 0.00 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
epayment.pdf
Tender Documents • 0.05 MB
BOQ_1483841.xls
BOQ • 0.31 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .