| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L Quoted ₹2.2 L | L1 | Accepted-AOC L1- Hence accepted |
| 2 | L2₹2.3 LRejected-AOC | ₹2.3 L | L2 | Rejected-AOC L2- Hence rejected |
| Sl No | Description | Qty | Unit | MAS CONSTRUCTIONS L1 | SKYHIGH BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00Tidal bund formation | |||||
| 1.00 | OD12590/2025-2026:Approved data by CTE 3.4
supplaying and stacking well matured half split and straight 6 m long coconut post for driving down through various strata below bed level including cost conveyance ,labor charge etc complete | 149.6 | 1 metre | 173.09 ₹25,894.26 | 175.97 ₹26,325.11 |
| 1.00 | OD12591/2025-2026:Approved data by CTE 3.7
supplaying 1/4 spilt well matured and straight coconut wailing pieces 6m long and tied to the post with iron wires etc complete as per standard specification | 66 | 1 metre | 125.17 ₹8,261.22 | 127.26 ₹8,399.16 |
| 1.00 | OD12592/2025-2026:Approved data by CTE 3.5
Driving down coconut half split to line and levels through soft to medium clay soil starat including all hire charges and all other appliances necessary for pile driving down after pointing the bottom end | 74.8 | 1 meter | 226.76 ₹16,961.65 | 230.54 ₹17,244.39 |
| 1.00 | OD12593/2025-2026:Screening with double new coconut cadjan madals over 1/6th split bamboo reeper tied horizontally at 50 cm c/c and vertically at 100 cm. c/c with coir yarn etc. complete as per specification. | 39.6 | 1 sqm | 180.11 ₹7,132.36 | 183.11 ₹7,251.16 |
| 1.00 | OD12594/2025-2026:Filling and forming the bund to lines and levels with contractors own hard stiff clay cut and conveyed with all leads and lift consolidation etc complete as per specification | 52.8 | cum | 335.5 ₹17,714.40 | 341.09 ₹18,009.55 |
| 1.01 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 5.28 | cum | 875.35 ₹4,621.85 | 889.86 ₹4,698.46 |
| 1.01 | OD33761/2025-2026:Shutter for check dams- Supplying and providing good quality Anjily wood-made shutter planks and frames including cost of materials and labour charges for cutting, carpentry works etc complete | 5.4 | cud m | 104.95 ₹566.73 | 106.7 ₹576.18 |
| 1.01 | OD12596/2025-2026:Operating the sluice shutter at the commencement of low & high tide to facilitate lowering the water level in the field & also removing obstructions if any and Watching and maintaining the bund throughout the cultivation period or till the water outside become fresh whichever is earlier etc. complete as per specifications | 66 | Day | 1,298.62 ₹85,708.92 | 1,320.26 ₹87,137.16 |
| 1.01 | OD12597/2025-2026:Dismantling and removing 1/4 split coconut wailing pieces etc. complete as per specification. | 66 | metre | 57.98 ₹3,826.68 | 58.95 ₹3,890.70 |
Updated dates
Tender Value
₹1.9 L
EMD Value
₹4,653
Closing Date
6 Nov 2025, 4:00 pmClosed
Assistant Executive Engineer,
O/o the Assistant Executive Engineer, MI Sub division, 2nd floor, Civil station, Kakkanad
Annual Maintanance- Putting up tidal bund across Athikai thodu in Trikkakkara Municipality for the year 2025-26
2025_Irrig_816838_1
11/AEE/MISDN/EKM/2025-26
Open Tender
Civil Works - Others
300 days
Thrikkakkara Municipality
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹4,653
Yes
18 Apr 2026
29 Oct 2025
7 Nov 2025
29 Oct 2025
6 Nov 2025
29 Oct 2025
stage.html
html • 0.04 MB
techsummary_1368288.pdf
finsummary_1368288.pdf
aoc.pdf
finance_1368288.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1368288.xls
BOQ • 0.31 MB
epaymentt.rar
Other Document • 0.04 MB
viewsbd.pdf
Tender Documents • 1.92 MB
Download all tender documents and submit your bid