Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹26.6 L
EMD Value
₹27,000
Closing Date
21 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Surat Canal Division, Surat
Emergency Repairing of Canal Syphon at Ch.14.000 RD on Katargam Distry Canal.
363671
NIT-05 of 2026-27
Open
Civil - All
Works
Surat
13 documents required · 11 mandatory · 2 optional
₹1,500
Executive Engineer, Surat Canal Division, Surat
₹27,000
7 Nov 2026
7 Nov 2026
7 Nov 2026
21 Nov 2026
7 Nov 2026
120 days
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer may
fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter
a rate or price shall be deemed to be covered by other rates and prices entered in the Bill
of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections of
the contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work : Emergency Repairing of Canal Syphon at Ch.14.000 RD on Katargam
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantit Unit Rate Amount
No specification and reference to book of y in
specifications) Figur
1 Dismantling the R.C.C. work & disposing off
the stuff including stacking of the useful
materials etc. complete as directed. (a) Light
reinforcement. (Main bar up to 16 mm dia.)
2 Dismentaling the existing R.C.C.pipes of the
following diameter including sorting out and
stacking of the useful materials including
refilling the trenches etc. complete as
directed.(NP.2 pipes) (d) 1000 mm to
3 Dismentaling the existing R.C.C.pipes of the
following diameter including sorting out and
stacking of the useful materials including
refilling the trenches etc. complete as
directed.(NP.2 pipes) (c) 600 mm to 900 mm
4 Excavation for foundation in all sorts of
soil including sandy and gravelly soil,
inclunding yellow, sandy, gravelly soil, soft &
hard murrum etc. dry condition depositing the
excavated stuff in uniform layers in bank or
as directed etc. complete for lead upto
Km and all lifts. (By machinery) (a) Above
5 Providing and laying plain/ reinforced Nominal
Mix cement concrete of various grade with
cement, sand and coarse aggregates
including centering, shuttering, batching,
mixing, transporting, placing, vibrating,
smooth finishing, curing etc. complete for all 254.00 Cmt. 4559.30
lead and lift. (Manually with Conventional
Mixer, excluding dewatering) B-Raft, Bottom
slab of barrel, footing of columns, piers,
abutment and bottom slab of sump etc. (i) M-
6 Providing and placing in position
reinforcement bars including cutting, bending
welding, joints where necessary, hooking etc. 100.66 Qtl. 7194.00
complete as per drawing for all lead and
7 Providing and fixing in position (different
diameter) I.S NP3 class reinforced pipe with
caulking the joints with cement mortar 1:1
proportion using jute string soaked in cement
slurry, finishing joints, and laying pipes to the
designed grade and levels, curing etc.
complete for all lead and lifts. NP3 class
mm dia pipe. For Canal
8 Providing and fixing in position (different
diameter) I.S NP3 class reinforced pipe with
caulking the joints with cement mortar 1:1
proportion using jute string soaked in cement
slurry, finishing joints, and laying pipes to the
designed grade and levels, curing etc.
complete for all lead and lifts. (e) NP3 class
900 mm dia pipe. For Drain
9 Providing and laying plain / Reinforced
cement concrete lining of 1:2:4 proportion
(Nominal mix) in bed, side slope and
curveture including mixing transporting,
placing, smooth finishing, curing including
dewatering where required (Manually with
Conventional Mixer Without Paver). (b)
cm in Bed & slope (with water curing)
Rupees Twenty-Six Lakh Fifty-Eight Thousand Three Hundred Forty-Nine And Paisa
Twenty Nine Only
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD- 14 RD CSY KATARGAM CORRECTED 27-10-2026.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .