Loading…
Loading…
Tender Value
₹18.1 Cr
EMD Value
₹36.3 L
Closing Date
19 Aug 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
SNL TO KJY
2 conditions · 2 needing a document upload
As per attached Tender Document
As per attached Tender Document
7 conditions · 2 needing a document upload
As per attached Tender Document
As per attached Tender Document
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Signalling and Telecommunication maintenance work including replacement /re- fixing works, supply of minor spares for Sahnewal-New Khurja section of Eastern Dedicated Freight Corridor (EDFC) for Two years.
CGM-UMB-SNT-MTCE-2026-01
CGM-UMB-SNT-MTCE-2026-01
Open
Works - General
24 Months
Ambala, Haryana
₹0
₹36.3 L
28 Jul 2026
28 Jul 2026
5 Aug 2026
269 items across 8 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,88,46,391.5 | ||
| — | 336.00 | — | — | ||
| Carrying Out P1 activity of Electrically Operated Point involving checking of point gear assembly, slides, rollers, setting of switches, lubrication, obstruction test, checking of brackets etc. with all labour, materials T&P as complete-Junction Station | — | — | — | 79,23,343.68 | |
| — | 168.00 | — | — | ||
| Carrying Out P2 activity of Electrically Operated Point measurement of operating voltage, checking of feed disconnection time, checking of housing Pipe/GI pipe, lubrication, brackets etc. with all labour, materials T&P as complete-Junction Station | — | — | — | 52,82,227.44 | |
| — | 56.00 | — | — | ||
| Carrying Out P3 activity of Electrically Operated Point measurement of Joint Point & Crossing for levelling, squaring, creeping, packing, clearance of ballast etc. with all labour, materials T&P as complete-Junction Station | — | — | — | 13,20,557.28 | |
| — | 56.00 | — | — | ||
| Carrying Out P4 activity of Electrically Operated Point measurement of smoothness & cleaning of commutator, carbon bushes, apply grease oiling of Point Gear Assembly etc. with all labour, materials T&P as complete-Junction Station | — | — | — | 8,80,371.52 | |
| — | 28.00 | — | — | ||
| Carrying Out P5 activity of Electrically Operated Point for checking for detector contacts, friction clutch, testing of point tail cable from K rack in N& R position of point with 100V megger etc. with all labour, materials T&P as complete-Junction Station | — | — | — | 6,60,278.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
UMBTD.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].