| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹9.6 L+₹0.01 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SHARVANI CONSTRUCTIONS L2 | Shri Pravin Namdev Rathod L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :All kinds of soil. | 56 | Cu.m | 214.54 ₹12,014.24 | 214.53 ₹12,013.68 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 16.8 | Cu.m | 1,658.5 ₹27,862.8 Lowest | 1,659.05 ₹27,872.04 |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 131.6 | Cu.m | 5,535.99 ₹7,28,536.28 | 5,471.45 ₹7,20,042.82 Lowest |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete. | 207.2 | Sqm | 305.32 ₹63,262.3 | 305.25 ₹63,247.8 Lowest |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge: 110 mm dia | 57.12 | Rm | 272.41 ₹15,560.06 | 272.26 ₹15,551.49 Lowest |
| 6.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to a length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile | 210 | Metre | 145.9 ₹30,639 Lowest | 162.9 ₹34,209 |
| 7.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured): Upto 2.5 meters long pile | 168 | Metre | 230.99 ₹38,806.32 Lowest | 278.11 ₹46,722.48 |
| 8.00 | Earthwork in Embankment with approved earth (Contractors earth)/moorum including spreading the earth in layers not exceeding 250mm in depth, breaking clods, watering, rolling each layer with half ton roller or wooden hammer including filling up ground depression, dressing etc. complete with all leads and lifts and as directed by engineer -in -charge. | 108.5 | Cu.m | 424.96 ₹46,108.16 | 397.51 ₹43,129.84 Lowest |
Tender Value
₹14.2 L
EMD Value
₹28,402
Closing Date
10 Sept 2026, 10:00 amClosed
Executive Engineer VII WRD Dhargal
O/o EE VII WRD Dhargal
Improvement to the existing retaining wall behind Padri Ghor Church in Survey No 16 1 of village Terekhol V P Keri Terekhol in Mandrem Constituency
2026_WRD_31563_1
WRD/WDVII/2026-27/TN-11/L3
Open Tender
Civil Works
Item Rate
45 days
village Terekhol V P Keri Terekhol in Mandrem
As per tender document
3 documents required · 3 mandatory
₹5,000
₹28,402
22 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :All kinds of soil. | 56 | Cu.m | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 16.8 | Cu.m | - | - |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 131.6 | Cu.m | - | - |
| 4 | Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete. | 207.2 | Sqm | - | - |
| 5 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge: 110 mm dia | 57.12 | Rm | - | - |
| 6 | Supplying jamba wooden bally piles 150 mm mean diameter cut to a length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile | 210 | Metre | - | - |
| 7 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured): Upto 2.5 meters long pile | 168 | Metre | - | - |
| 8 | Earthwork in Embankment with approved earth (Contractors earth)/moorum including spreading the earth in layers not exceeding 250mm in depth, breaking clods, watering, rolling each layer with half ton roller or wooden hammer including filling up ground depression, dressing etc. complete with all leads and lifts and as directed by engineer -in -charge. | 108.5 | Cu.m | - | - |
stage.html
html • 0.02 MB
finance_31946.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_31946.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .