Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.5 Laccepted-aoc | ₹19.5 L | accepted-aoc |
Tender Value
₹20.2 L
EMD Value
₹20,300
Closing Date
22 May 2026, 3:00 pmClosed
Executive Engineer-XIV, Tirupati
Tirupati
Erection and removal of pendals and summer pendals for various Festivals & functions in TTD Temples Vayalpadu, Tharigonda and Kosuvaripalli Temples in Annamaiah (Dist) for the year 2026-27
930229
4/EE-XIV/TTD/2026-27
OPEN - NCB
Civil Engineering Works
ANNAMAYYA
6 documents required · 6 mandatory
₹716
₹20,300
6 Jun 2026
7 May 2026
7 May 2026
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustavam period and should be removed after the same is over and should be repaired or replaced as and when torn out by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days .(The rate for pendals will be paid as per area of pendals measured on covering plan area) Note: If, there is any deviation in the usage of good quality of cloth effecting the pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer in charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing bunting cloth of white or red or green colour to the Casurinas or Eucalyptus posts etc., complete to the full height and cloth used preferably new or neatly washed and should be in good condition through out the Festival or Utsavam period and should be removed after the same is over as directed during execution and should be repaired without any extra rate if the cloth is spoiled due to any means. The Contractor should allow the Electric and flowers decoration over the cloth done Departmentally without any claim. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area). Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days .* The relevant conditions of the foot note mentioned at the end of these items
Hire charges for erection and removal of side curtains with white / colour design cloth and required frame work including using necessary bolts, nuts, etc., complete. The rate is including conveyance of all materials and labour charges for fixing and removal etc., complete .The Side curtains should be neat and with good appearance in all days , if spoiled in any manner and the same should be replaced immediately. The rate is for below mentioned calendar days .The rate is for below mentioned calendar days. The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-do- For 3 days
Hire charges for erection and removal of temporary Dias at a height of 60 cms to 120 cms (2' 0" to 4' 0") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals.The barricading provided such that it shall be 2m above ground level and 0.45 m pipe embedded in the ground with necessary earth work excavation in all soils up to 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals.The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc.,duly refilling the pits and levelling the surface etc.,complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges.The rate quoted is including conveyance of all materials and labour charges for fixing etc.,complete . The rate is for below mentioned calendar days.
-do- For 3 days
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia for veridical, horizontals bracings and roofing. The pendals are firmly fixed with bracings and with necessary frame work/rope etc., and the roof covered with thick white ceiling cloth along with all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area).Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for single side arch
Hire charges for erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes for verticals. horizontals and roof supports etc., fixing with, special type gripper MS clamps (Nandu clamps) , extra horizontal bracings should be provided from at 2.40 m to roof level and jointing with special type gripper MS clamps ( Nandu clamps)for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m. The vertical posts are to be fixed strongly without any shaking. The entre roof shall be made of one layer of nylon net with opening of size 100 x 100 mm .The nylon net must be provided with suitable openings alround for stiffness and for tying at the ends and over that the entire roof shall be covered suitably with Green shade net 125 GSM. The rate including conveyance and hire charges of all materials such as MS pips, Clamps, Green shade net and safety net etc. and labor charges for fixing and removal etc., complete. The rate is for below mentioned calendar days. *The relevant conditions of the foot note mentioned at the end of this items/chapter apply.
Painting Two coats for External walls - old with Acrylic Emulsion paint Exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/liter of approved brand and shade over a priming coat with ready mixed Cement primer (water thinnable) (Total Three Coats) for old plastered surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for External walls.
Rupees Twenty Lakh(s) Twenty Two Thousand Three Hundred Eighty And Paise Twenty Only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ _4.xlsx
TENDER_DOCUMENT • 0.37 MB
NIT_4.doc
TENDER_DOCUMENT • 0.52 MB
~WRL0003.tmp
TENDER_DOCUMENT • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].