Project Implementation Unit, Health & Family Welfare Department
Construction of Nursing College & Hostel @ GMERS Morbi, Gujarat.
365809
108/02/2026-27
Open
Civil - All
Works
Rajkot
12 documents required · 9 mandatory · 3 optional
₹30,000
PIU – General Fund AC 11-114
₹51.5 L
17 Nov 2026
17 Nov 2026
17 Nov 2026
30 Nov 2026
17 Nov 2026
120 days
In Figure In Word
Providing and erecting 3.50 metre high temporary barricading at
site each panel of size 2.50 m x3.50 m made of 40x40x6 mm
angle iron or 50x50x3 mm hollow MS tube posts/horizontal
members/bracings covered with 1.63 mm thick MS sheet. The
sheet shall be fixed with 30x5 mm MS flat by suitable
welding/riveting. The panels shall be made so that gap of 30 cm
above the ground is available making overall height as 4.0 m. MS
channel ISLC 75 @ 5.70 kg/m, 50 cm long shall be provided at the
bottom having oval shaped holes of size 50x25 mm at both ends
with 50 cm long MS angle 40x40x6 mm bracing. Suitable
arrangement shall be made to fix the barricading to avoid from
Rupees Two
overturning by providing 250 mm long expansion fasteners at
Thousand Nine
both ends. The barricading must including solar powered LED
1 125.97 Rmt 2,943.98 Hundred Forty-
blinkers (amber color, visibility 500m, flashing 60–90/min) fixed
Three and Ninety-
at 10m intervals, and ACP/MS project name plate of size
Seven Paise Only
1200x600mm with retro-reflective lettering showing
project/client/contractor details, complete as directed at
site.”The work shall be executed as per drawing/direction of
Engineer-in-Charge which includes writing and painting,
arrangement for traffic diversion such as traffic signals during
construction at site for day and night, glow lamps, reflective
signs, marking, flags, caution tape as directed by the Engineer-in-
Charge. The barricading provided shall be retained in position at
site continuously including shifting of barricading from one
location to another location as many times as required during
the execution of the entire work till its completion. Rates include
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
its maintenance for damages, painting, all incidentals, labour
materials, equipment’s and works required to execute the job.
The barricading shall not be removed without prior approval of
Engineer-in-Charge.
(Note :- Onetime payment shall be made for providing
barricading from start of work till completion of work including
shifting. The barricading provided shall remain to be the property
of the contractor on completion of the work)
Clearing and grubbing road land includding uprooting trank
vegetation, grass, bushes, shrubs, saplings and trees girth upto Rupees Two and
2 3186.66 300mm removal of stumps of tress cut earlier and disposal of Sqm Eighty Four Paise
unserviceable materials. A) By Mechanical means in area of light Only
Excavation for foundation upto 1.5 mt.depth including All Type
of Soil Hard Murram, Soft Rock & Hard Rock (Not Required
Blasting) etc. including strutting, sorting & Dewatering out and
Rupees One
stacking of useful materials and disposing off the excavated stuff
Hundred Fifty Seven
3 3826.59 upto any lead and lift.(Excavated earth / Stuff to be stacked and Cum
157.33 and Thirty Two
surplus earth/unuseble material to be disposed with the
Paise Only
permission of local authority any lavies/charges to be paid by
agencies and no extra payments will be made and disposed at
non objectinable place to be found by the Contractor)
Excavation for foundation for 1.5 mt. to 3.0 mt. Including All Type Rupees One
of Soil Hard Murram, Soft Rock & Hard Rock (Not Required Hundred Seventy
Blasting) etc. including strutting, sorting & Dewatering out and 170.69 and Sixty Nine Paise
stacking of useful materials and disposing off the excavated stuff Only
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
upto any lead and lift.(Excavated earth / Stuff to be stacked and
surplus earth/unuseble material to be disposed with the
permission of local authority any lavies/charges to be paid by
agencies and no extra payments will be made and disposed at
non objectinable place to be found by the Contractor)
Excavation for foundation for 3.0 mt. to 5.0 mt. Including All Type
of Soil Hard Murram, Soft Rock & Hard Rock (Not Required
Blasting) etc. including strutting, sorting & Dewatering out and
Rupees One
stacking of useful materials and disposing off the excavated stuff
Hundred Eighty
5 2502.90 upto any lead and lift.(Excavated earth / Stuff to be stacked and Cum
184.77 Four and Seventy
surplus earth/unuseble material to be disposed with the
Six Paise Only
permission of local authority any lavies/charges to be paid by
agencies and no extra payments will be made and disposed at
non objectinable place to be found by the Contractor)
(excluding rock) (Earth which is stacked at any location outside
Rupees One
the campus non- objectionable place shall be found by the
Hundred Thirty Six
6 9149.14 contractor) in trenches, plinth, sides of foundations etc. in layers Cum
136.92 and Ninety One
not exceeding 20 cm. in depth consolidating 95% of MDD each
Paise Only
deposited layer by ramming and watering and Compaction with
Mechanical equipments if possible
Filling in plinth with Murram brought from outside including Rupees Three
watering, ramming, Compacting with Vibro Roller (If Possible) Hundred One and
consolidating and dressing etc. complete. (and compacting the 301.78 Seventy Seven Paise
layers to give at least 95% of maximum dry density). Royalty shall Only
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
be paid by contractor and supproting document submitted to
client for verification.
Filling in plinth with sand under floors including watering, Rupees Four
ramming, consolidating and dressing etc. complete.(Royalty shall Hundred Eighty One
be paid by contractor and supproting document submitted to 481.80 and Eighty Paise
client for verification.) Only
Providing and laying rubble soling, in a compact manner,
Rupees One
foudation, road, footpath etc. using 200 to 230 mm. cut size
Thousand Seven
stones, covering and levelling the surface with a layer of murrum
9 586.75 Cum Hundred Five and
after filling the voids with smaller sized stones or stone chips, 1,705.89
Eighty Nine Paise
including watering, ramming well and consolidating each layer,
as directed.
Providing and injecting Chemical emulsion for pre constructional
anti-termite treatment for all types of structure with / without
basement with RCC foundation/RCC wall or with load bearing
walled foundation or developing areas tree pits, water body etc.
The chemical used shall be chloropyriphos(1:19) / Biflex TC /
lindane or equivalent as per approved make as per latest IS code
Rupees Forty Four
no 6313 (Part II) . Plinth area in plan at GF shall only be measured
10 1835.21 Sqm and Forty Four Paise
and paid. A guarantee bond of 10 years shall be furnished. Rate 44.44
shall be inclusive of material required for Anti Termite Treatment
and labour for applying. a) Bottom surface and the sides of the
excavation made for masonry foundations at the rate of 4 liters/
of surface area (wherever applicable). b) At the rate of 7.5 liter/
Sqm of surface area to the backfill at the depth of 500mm below
the original ground level. The soil in the immediate contact with
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
the vertical surface of RCC column shall be treated. c) Top surface
of the plinth filling at the rate of 5 liter/Sqm of internal plinth
area etc. complete. d) Internal vertical surface from original
Ground level to top of the earth filled in the plinth at the rate of
7.5 liter/Sqm of surface area in contact. e) at the rate of 7.5 liter/
Sqm to the external vertical surface below finished Ground level
to the full depth of the filling complete by injecting chemical after
drilling the holes of 12 to 15mm dia, with depths of approx.
to 600 mm and at 150mm centre to centre and as close to the
wall as possible. f) All holes for electrical data, water supply,
drainage etc. shall be treated.
Providing and filling autoclave aerated concrete block
bats (broken pieces) in single or multiple layers in super
structure, filling the joints with sand mortar (Not more than 20%)
20 mm thick cement sand mortar screed in proportion 1:6 shall
be laid as per drawing. Crushing strength of aerated concrete Rupees One
block/ bats shall not be less than 40 KG/sqcm, minimum density Thousand Six
11 191.00 in oven dry condition between 651 to 750 KG/CUM, thermal Cum Hundred Ninety
conductivity shall not exceed 0.3 W/m.k, fire resistant 4 hours in Two and Forty Paise
true line level and plumb and cleaning the surface with necessary Only
tool tackles etc. at all floors, all heights, all levels and all places
including curing, scaffolding etc complete, as per drawing /
specification and as directed by Engineer -Incharge. For all civil,
plumbing, electrical & infrastructure works.
General Note : This shall be applicable to all concrete plan as well Rupees Three
as work. 3,784.74 Thousand Seven
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
1. Providing and laying in position Ready Mixed specified grade Hundred Eighty
concrete for PCC & reinforced cement concrete work , using Four and Seventy
cement content as per approved Design Mix manufactured in Four Paise Only
fully automatic batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having continuous agitated
mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C.
from transit mixer to site of laying, All Concrete Work content as
per grade (without fly ash as per item description) and as per
latest IS 456 for all PCC & RCC elements of all shape, all size, at
all places and heights/ depths including transporting, laying of
concrete to site by any means like pumping or tower crane etc.,
finishing and curing etc. and including Admixtures in
recommended proportions as per IS 9103 to accelerate, retard
setting of concrete as per direction of Engineer-in-charge. Rate
shall be inclusive of providing grooves, drip moulds, ghisis,
pockets, cutouts etc. and labour for insert sleeves if any
wherever required while casting. Rate also to include lift charges
and scaffolding for any heights / depths from FFL/GL.(unless
otherwise specified)
2. All formwork should be rigid & water tight using best quality
of laminated marine plywood boards minimum 18 mm thick
shuttering (Special) for external surfaces of super structure with
supporting system of MS adjustable steel props / spans / frames
for any shapes, sizes, planes including strutting, propping,
bracing, staging etc., complete to give smooth & fair finish up to
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
4.2 mtr. Height or specified in BOQ item. Providing and laying in
position machine mixed, machine batched plain cement
concrete (PCC) & Reinforced Cement Concrete (RCC) including all
necessary dewatering, casting in panels of any size and thickness
wherever necessary, to shape and depth as specified at all
locations and with all leads and lift/depth, compaction, vibration,
curing, finishing top surface to the required level, transporting
and pumping wherever necessary including the cost of form
work (if required) and removal of formwork etc. complete as
directed by the Engineer. for all civil, plumbing, electrical &
infrastructure works.
Providing & laying Ready Mixed Controlled cement concrete
1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggrt. 20 mm.
nominal size) and curing etc complete for Foundation and plinth.
Providing and laying in position M-350 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
Rupees Five
in transit mixer for any lead having continuous agitated mixer,
Thousand Nineteen
13 2675.00 manufactured as per mix design of specified grade for reinforced Cum
5,019.70 and Seventy Paise
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(A) Footing
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-350 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Six
in transit mixer for any lead having continuous agitated mixer, Thousand Nine
14 244.32 manufactured as per mix design of specified grade for reinforced Cum Hundred Fifty One
cement concrete work including pumping of batching plant from and Eighty Three
transit mixer to site of laying, cost of water tight Centering , Paise Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(B) Plinth Beam / Ground Beam / Tie Beam
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-350 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Seven
in transit mixer for any lead having continuous agitated mixer, Thousand Seven
15 95.39 manufactured as per mix design of specified grade for reinforced Cum Hundred Sixty Six
cement concrete work including pumping of batching plant from and Ninety Paise
transit mixer to site of laying, cost of water tight Centering , Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column
(i) Up to Plinth Lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Seven
in transit mixer for any lead having continuous agitated mixer,
16 106.12 Cum Hundred Twenty
manufactured as per mix design of specified grade for reinforced 7,721.45
One and Forty Five
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Ground Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Seven
in transit mixer for any lead having continuous agitated mixer,
17 92.85 Cum Hundred Sixty Two
manufactured as per mix design of specified grade for reinforced 7,762.86
and Eighty Six Paise
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to First Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Eight
in transit mixer for any lead having continuous agitated mixer,
18 79.34 Cum Hundred Four and
manufactured as per mix design of specified grade for reinforced 7,804.27
Twenty Seven Paise
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Second Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Eight
in transit mixer for any lead having continuous agitated mixer,
19 49.31 Cum Hundred Forty Five
manufactured as per mix design of specified grade for reinforced 7,845.68
and Sixty Eight Paise
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Third Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Eight
in transit mixer for any lead having continuous agitated mixer,
20 43.81 Cum Hundred Eighty
manufactured as per mix design of specified grade for reinforced 7,887.09
Seven and Nine
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Fourth Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Nine
in transit mixer for any lead having continuous agitated mixer,
21 43.81 Cum Hundred Twenty
manufactured as per mix design of specified grade for reinforced 7,928.50
Eight and Fifty Paise
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Fifth Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Nine
in transit mixer for any lead having continuous agitated mixer,
22 43.81 Cum Hundred Sixty Nine
manufactured as per mix design of specified grade for reinforced 7,969.91
and Ninety One
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Sixth Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Eight
in transit mixer for any lead having continuous agitated mixer, Thousand Eleven
manufactured as per mix design of specified grade for reinforced 8,011.32 and Thirty Two
cement concrete work including pumping of batching plant from Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Seventh Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Eight
in transit mixer for any lead having continuous agitated mixer, Thousand Fifty Two
manufactured as per mix design of specified grade for reinforced 8,052.73 and Seventy Three
cement concrete work including pumping of batching plant from Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Eighth Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Eight
in transit mixer for any lead having continuous agitated mixer, Thousand Ninety
manufactured as per mix design of specified grade for reinforced 8,094.14 Four and Fourteen
cement concrete work including pumping of batching plant from Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Nineth Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Eight
in fully automatic batching plant and transported to site of work
Thousand One
in transit mixer for any lead having continuous agitated mixer,
26 43.81 Cum Hundred Thirty Five
manufactured as per mix design of specified grade for reinforced 8,135.55
and Fifty Five Paise
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Tenth Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Eight
in fully automatic batching plant and transported to site of work
Thousand One
in transit mixer for any lead having continuous agitated mixer,
27 43.81 Cum Hundred Seventy
manufactured as per mix design of specified grade for reinforced 8,176.96
Six and Ninety Six
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column up to Eleventh Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Eight
in fully automatic batching plant and transported to site of work
Thousand Two
in transit mixer for any lead having continuous agitated mixer,
28 20.59 Cum Hundred Eighteen
manufactured as per mix design of specified grade for reinforced 8,218.37
and Thirty Seven
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Column Above Eleventh Floor Slab lvl.
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-350 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Eight
in transit mixer for any lead having continuous agitated mixer, Thousand Six and
manufactured as per mix design of specified grade for reinforced 8,006.27 Twenty Seven Paise
cement concrete work including pumping of batching plant from Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wall
A) Up to Plinth
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured Rupees Eight
in fully automatic batching plant and transported to site of work Thousand Four
30 119.12 in transit mixer for any lead having continuous agitated mixer, Cum Hundred Twenty
manufactured as per mix design of specified grade for reinforced Five and Forty Two
cement concrete work including pumping of batching plant from Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wall
B) Ground Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
Rupees Eight
using cement content as per approved Design Mix manufactured
Thousand Four
in fully automatic batching plant and transported to site of work
31 104.24 Cum Hundred Sixty Six
in transit mixer for any lead having continuous agitated mixer, 8,466.83
and Eighty Three
manufactured as per mix design of specified grade for reinforced
Paise Only
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wall
C) First Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work Rupees Eight
using cement content as per approved Design Mix manufactured Thousand Five
32 111.65 in fully automatic batching plant and transported to site of work Cum Hundred Eight and
in transit mixer for any lead having continuous agitated mixer, Twenty Four Paise
manufactured as per mix design of specified grade for reinforced Only
cement concrete work including pumping of batching plant from
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(D) Second Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
Rupees Eight
reinforced cement concrete work, using cement concrete work
Thousand Five
using cement content as per approved Design Mix manufactured
33 103.50 Cum Hundred Forty Nine
in fully automatic batching plant and transported to site of work 8,549.65
and Sixty Five Paise
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Third Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for Rupees Eight
reinforced cement concrete work, using cement concrete work Thousand Five
34 71.16 using cement content as per approved Design Mix manufactured Cum Hundred Ninety
in fully automatic batching plant and transported to site of work One and Six Paise
in transit mixer for any lead having continuous agitated mixer, Only
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Fourth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
Rupees Eight
reinforced cement concrete work, using cement concrete work
35 71.16 Cum Thousand Six
using cement content as per approved Design Mix manufactured 8,632.47
Hundred Thirty Two
in fully automatic batching plant and transported to site of work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
in transit mixer for any lead having continuous agitated mixer, and Forty Seven
manufactured as per mix design of specified grade for reinforced Paise Only
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Fifth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for Rupees Eight
36 71.16 reinforced cement concrete work, using cement concrete work Cum Thousand Six
using cement content as per approved Design Mix manufactured Hundred Seventy
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
in fully automatic batching plant and transported to site of work Three and Eighty
in transit mixer for any lead having continuous agitated mixer, Eight Paise Only
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Sixth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for Rupees Eight
reinforced cement concrete work, using cement concrete work 8,715.29 Thousand Seven
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
using cement content as per approved Design Mix manufactured Hundred Fifteen
in fully automatic batching plant and transported to site of work and Twenty Nine
in transit mixer for any lead having continuous agitated mixer, Paise Only
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Seventh Floor
Note:- Refer General Note for Concrete as per Item No.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc. Rupees Eight
propping and centering below supporting floor to ceiling and Thousand Seven
38 71.16 removal of the same for in situ reinforced concrete and plain Cum Hundred Fifty Six
concrete work in flat surfaces such as soffits of suspended floors and Seventy Paise
slabs Landings walls, Fins and beams, column and the like, floors Only
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(E) Eighth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Rupees Eight
including centring shuttering strutting and propping etc.
Thousand Seven
propping and centering below supporting floor to ceiling and
39 71.16 Cum Hundred Ninety
removal of the same for in situ reinforced concrete and plain 8,798.11
Eight and Eleven
concrete work in flat surfaces such as soffits of suspended floors
Paise Only
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(D) RCC Wall / Shear Wallup
(E) Nineth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system Rupees Eight
including centring shuttering strutting and propping etc. Thousand Eight
40 71.16 propping and centering below supporting floor to ceiling and Cum Hundred Thirty Nine
removal of the same for in situ reinforced concrete and plain and Fifty Two Paise
concrete work in flat surfaces such as soffits of suspended floors Only
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(D) RCC Wall / Shear Wallup
(E) Tenth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Rupees Eight
shuttering & Providing formwork of steel cup lock system
Thousand Eight
including centring shuttering strutting and propping etc.
41 71.16 Cum Hundred Eighty and
propping and centering below supporting floor to ceiling and 8,880.93
Ninety Three Paise
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring, Rupees Eight
shuttering & Providing formwork of steel cup lock system Thousand Nine
42 91.98 including centring shuttering strutting and propping etc. Cum Hundred Twenty
propping and centering below supporting floor to ceiling and Two and Thirty Four
removal of the same for in situ reinforced concrete and plain Paise Only
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(D) RCC Wall / Shear Wallup
(E) Above Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring, Rupees Seven
shuttering & Providing formwork of steel cup lock system Thousand Thirty
including centring shuttering strutting and propping etc. 7,032.63 Two and Sixty Three
propping and centering below supporting floor to ceiling and Paise Only
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Ground FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
Rupees Seven
shuttering by using 18 mm thick water proof ply in centring,
Thousand Seventy
44 233.65 shuttering & Providing formwork of steel cup lock system Cum
7,074.04 Four and Four Paise
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) First FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
Rupees Seven
transit mixer to site of laying, cost of water tight Centering
Thousand One
shuttering by using 18 mm thick water proof ply in centring,
45 221.32 Cum Hundred Fifteen
shuttering & Providing formwork of steel cup lock system 7,115.45
and Forty Five Paise
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Second FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from Rupees Seven
transit mixer to site of laying, cost of water tight Centering , Thousand One
46 145.82 shuttering by using 18 mm thick water proof ply in centring, Cum Hundred Fifty Six
shuttering & Providing formwork of steel cup lock system and Eighty Six Paise
including centring shuttering strutting and propping etc. Only
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Third FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Rupees Seven
cement concrete work including pumping of batching plant from
Thousand One
transit mixer to site of laying, cost of water tight Centering
47 145.82 Cum Hundred Ninety
shuttering by using 18 mm thick water proof ply in centring, 7,198.27
Eight and Twenty
shuttering & Providing formwork of steel cup lock system
Seven Paise Only
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Fourth FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced Rupees Seven
cement concrete work including pumping of batching plant from Thousand Two
48 145.82 transit mixer to site of laying, cost of water tight Centering , Cum Hundred Thirty Nine
shuttering by using 18 mm thick water proof ply in centring, and Sixty Eight Paise
shuttering & Providing formwork of steel cup lock system Only
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Fifth FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced Rupees Seven
cement concrete work including pumping of batching plant from Thousand Two
transit mixer to site of laying, cost of water tight Centering , 7,281.09 Hundred Eighty One
shuttering by using 18 mm thick water proof ply in centring, and Nine Paise Only
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Sixth FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer, Rupees Seven
manufactured as per mix design of specified grade for reinforced Thousand Three
50 145.82 cement concrete work including pumping of batching plant from Cum Hundred Twenty
transit mixer to site of laying, cost of water tight Centering , Two and Fifty Paise
shuttering by using 18 mm thick water proof ply in centring, Only
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Seventh FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
Rupees Seven
in transit mixer for any lead having continuous agitated mixer,
Thousand Three
manufactured as per mix design of specified grade for reinforced
51 145.82 Cum Hundred Sixty Three
cement concrete work including pumping of batching plant from 7,363.91
and Ninety One
transit mixer to site of laying, cost of water tight Centering
Paise Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Eighth FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Seven
in transit mixer for any lead having continuous agitated mixer, Thousand Four
52 145.82 manufactured as per mix design of specified grade for reinforced Cum Hundred Five and
cement concrete work including pumping of batching plant from Thirty Two Paise
transit mixer to site of laying, cost of water tight Centering , Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Nineth FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Seven
in fully automatic batching plant and transported to site of work
Thousand Four
in transit mixer for any lead having continuous agitated mixer,
53 145.82 Cum Hundred Forty Six
manufactured as per mix design of specified grade for reinforced 7,446.73
and Seventy Three
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Tenth FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured Rupees Seven
in fully automatic batching plant and transported to site of work Thousand Four
54 145.82 in transit mixer for any lead having continuous agitated mixer, Cum Hundred Eighty
manufactured as per mix design of specified grade for reinforced Eight and Fourteen
cement concrete work including pumping of batching plant from Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Eleventh FLoor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
Rupees Seven
using cement content as per approved Design Mix manufactured
Thousand Five
in fully automatic batching plant and transported to site of work
55 37.87 Cum Hundred Twenty
in transit mixer for any lead having continuous agitated mixer, 7,529.55
Nine and Fifty Five
manufactured as per mix design of specified grade for reinforced
Paise Only
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Floor Beam
i) Above Eleventh Floor Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work Rupees Seven
using cement content as per approved Design Mix manufactured Thousand Six
56 26.38 in fully automatic batching plant and transported to site of work Cum Hundred Sixty Nine
in transit mixer for any lead having continuous agitated mixer, and Ninety Four
manufactured as per mix design of specified grade for reinforced Paise Only
cement concrete work including pumping of batching plant from
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Ground Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
Rupees Seven
reinforced cement concrete work, using cement concrete work
Thousand Seven
using cement content as per approved Design Mix manufactured
57 25.02 Cum Hundred Eleven and
in fully automatic batching plant and transported to site of work 7,711.35
Thirty Five Paise
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) First Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for Rupees Seven
reinforced cement concrete work, using cement concrete work Thousand Seven
58 20.85 using cement content as per approved Design Mix manufactured Cum Hundred Fifty Two
in fully automatic batching plant and transported to site of work and Seventy Six
in transit mixer for any lead having continuous agitated mixer, Paise Only
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Second Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
Rupees Seven
reinforced cement concrete work, using cement concrete work
59 17.27 Cum Thousand Seven
using cement content as per approved Design Mix manufactured 7,794.17
Hundred Ninety
in fully automatic batching plant and transported to site of work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
in transit mixer for any lead having continuous agitated mixer, Four and Seventeen
manufactured as per mix design of specified grade for reinforced Paise Only
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Third Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for Rupees Seven
60 16.49 reinforced cement concrete work, using cement concrete work Cum Thousand Eight
using cement content as per approved Design Mix manufactured Hundred Thirty Five
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
in fully automatic batching plant and transported to site of work and Fifty Eight Paise
in transit mixer for any lead having continuous agitated mixer, Only
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Fourth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for Rupees Seven
reinforced cement concrete work, using cement concrete work 7,876.99 Thousand Eight
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
using cement content as per approved Design Mix manufactured Hundred Seventy
in fully automatic batching plant and transported to site of work Six and Ninety Nine
in transit mixer for any lead having continuous agitated mixer, Paise Only
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Fifth Floor
Note:- Refer General Note for Concrete as per Item No.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Rupees Seven
propping and centering below supporting floor to ceiling and
Thousand Nine
62 16.49 removal of the same for in situ reinforced concrete and plain Cum
7,918.40 Hundred Eighteen
concrete work in flat surfaces such as soffits of suspended floors
and Forty Paise Only
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
i) Sixth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Rupees Seven
including centring shuttering strutting and propping etc.
Thousand Nine
propping and centering below supporting floor to ceiling and
63 16.49 Cum Hundred Fifty Nine
removal of the same for in situ reinforced concrete and plain 7,959.81
and Eighty One
concrete work in flat surfaces such as soffits of suspended floors
Paise Only
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(C) RCC Lintel, sill and Mullians Bands
i) Seventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Rupees Eight
including centring shuttering strutting and propping etc.
Thousand One and
64 16.49 propping and centering below supporting floor to ceiling and Cum
8,001.22 Twenty Two Paise
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(C) RCC Lintel, sill and Mullians Bands
i) Eighth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system Rupees Eight
including centring shuttering strutting and propping etc. Thousand Forty Two
propping and centering below supporting floor to ceiling and 8,042.63 and Sixty Three
removal of the same for in situ reinforced concrete and plain Paise Only
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Nineth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Rupees Eight
shuttering & Providing formwork of steel cup lock system
Thousand Eighty
66 16.49 including centring shuttering strutting and propping etc. Cum
8,084.04 Four and Four Paise
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Tenth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
Rupees Eight
shuttering by using 18 mm thick water proof ply in centring,
Thousand One
shuttering & Providing formwork of steel cup lock system
67 16.49 Cum Hundred Twenty
including centring shuttering strutting and propping etc. 8,125.45
Five and Forty Five
propping and centering below supporting floor to ceiling and
Paise Only
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering , Rupees Eight
shuttering by using 18 mm thick water proof ply in centring, Thousand One
68 2.97 shuttering & Providing formwork of steel cup lock system Cum Hundred Sixty Six
including centring shuttering strutting and propping etc. and Eighty Six Paise
propping and centering below supporting floor to ceiling and Only
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Lintel, sill and Mullians Bands
i) Above Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
Rupees Five
transit mixer to site of laying, cost of water tight Centering
Thousand Seven
shuttering by using 18 mm thick water proof in centring,
69 13.17 Cum Hundred Forty Nine
shuttering & Providing formwork of steel cup lock system 5,749.93
and Ninety Three
including centring shuttering strutting and propping etc.
Paise Only
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Ground Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from Rupees Five
transit mixer to site of laying, cost of water tight Centering , Thousand Seven
70 13.17 shuttering by using 18 mm thick water proof ply in centring, Cum Hundred Ninety
shuttering & Providing formwork of steel cup lock system One and Thirty Four
including centring shuttering strutting and propping etc. Paise Only
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) First Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Rupees Five
cement concrete work including pumping of batching plant from
Thousand Eight
transit mixer to site of laying, cost of water tight Centering
71 13.17 Cum Hundred Thirty Two
shuttering by using 18 mm thick water proof ply in centring, 5,832.75
and Seventy Five
shuttering & Providing formwork of steel cup lock system
Paise Only
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Second Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced Rupees Five
cement concrete work including pumping of batching plant from Thousand Eight
72 4.78 transit mixer to site of laying, cost of water tight Centering , Cum Hundred Seventy
shuttering by using 18 mm thick water proof ply in centring, Four and Sixteen
shuttering & Providing formwork of steel cup lock system Paise Only
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Third Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
Rupees Five
manufactured as per mix design of specified grade for reinforced
Thousand Nine
cement concrete work including pumping of batching plant from
73 1.93 Cum Hundred Fifteen
transit mixer to site of laying, cost of water tight Centering , 5,915.57
and Fifty Seven
shuttering by using 18 mm thick water proof ply in centring,
Paise Only
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Fourth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer, Rupees Five
manufactured as per mix design of specified grade for reinforced Thousand Nine
74 1.93 cement concrete work including pumping of batching plant from Cum Hundred Fifty Six
transit mixer to site of laying, cost of water tight Centering , and Ninety Eight
shuttering by using 18 mm thick water proof ply in centring, Paise Only
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Fifth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
Rupees Five
in transit mixer for any lead having continuous agitated mixer,
Thousand Nine
manufactured as per mix design of specified grade for reinforced
75 1.93 Cum Hundred Ninety
cement concrete work including pumping of batching plant from 5,998.39
Eight and Thirty
transit mixer to site of laying, cost of water tight Centering
Nine Paise Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Sixth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
Rupees Six
in transit mixer for any lead having continuous agitated mixer,
Thousand Thirty
76 1.93 manufactured as per mix design of specified grade for reinforced Cum
6,039.80 Nine and Eighty
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Seventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Six
in transit mixer for any lead having continuous agitated mixer, Thousand Eighty
manufactured as per mix design of specified grade for reinforced 6,081.21 One and Twenty
cement concrete work including pumping of batching plant from One Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Eighth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured Rupees Six
in fully automatic batching plant and transported to site of work Thousand One
78 1.93 in transit mixer for any lead having continuous agitated mixer, Cum Hundred Twenty
manufactured as per mix design of specified grade for reinforced Two and Sixty Two
cement concrete work including pumping of batching plant from Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Nineth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work
Rupees Six
using cement content as per approved Design Mix manufactured
Thousand One
in fully automatic batching plant and transported to site of work
79 1.93 Cum Hundred Sixty Four
in transit mixer for any lead having continuous agitated mixer, 6,164.03
and Three Paise
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Tenth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
reinforced cement concrete work, using cement concrete work Rupees Six
using cement content as per approved Design Mix manufactured Thousand Two
80 1.93 in fully automatic batching plant and transported to site of work Cum Hundred Five and
in transit mixer for any lead having continuous agitated mixer, Forty Four Paise
manufactured as per mix design of specified grade for reinforced Only
cement concrete work including pumping of batching plant from
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for
Rupees Six
reinforced cement concrete work, using cement concrete work
Thousand Two
using cement content as per approved Design Mix manufactured
81 1.11 Cum Hundred Forty Six
in fully automatic batching plant and transported to site of work 6,246.85
and Eighty Five
in transit mixer for any lead having continuous agitated mixer,
Paise Only
manufactured as per mix design of specified grade for reinforced
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Weathershed
i) Above leventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-250 grade concrete for Rupees Five
reinforced cement concrete work, using cement concrete work Thousand Seven
82 278.68 using cement content as per approved Design Mix manufactured Cum Hundred Forty
in fully automatic batching plant and transported to site of work Seven and Ninety
in transit mixer for any lead having continuous agitated mixer, One Paise Only
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) Grade Slab
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for Rupees Six
reinforced cement concrete work, using cement concrete work Thousand Five
83 284.68 using cement content as per approved Design Mix manufactured Cum Hundred Eight and
in fully automatic batching plant and transported to site of work Forty Four Paise
in transit mixer for any lead having continuous agitated mixer, Only
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i)Ground Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
Rupees Six
reinforced cement concrete work, using cement concrete work
84 279.10 Cum Thousand Five
using cement content as per approved Design Mix manufactured 6,549.85
Hundred Forty Nine
in fully automatic batching plant and transported to site of work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
in transit mixer for any lead having continuous agitated mixer, and Eighty Five
manufactured as per mix design of specified grade for reinforced Paise Only
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) First Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for Rupees Six
85 275.39 reinforced cement concrete work, using cement concrete work Cum Thousand Five
using cement content as per approved Design Mix manufactured Hundred Ninety
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
in fully automatic batching plant and transported to site of work One and Twenty Six
in transit mixer for any lead having continuous agitated mixer, Paise Only
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Second Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for Rupees Six
reinforced cement concrete work, using cement concrete work 6,632.67 Thousand Six
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
using cement content as per approved Design Mix manufactured Hundred Thirty Two
in fully automatic batching plant and transported to site of work and Sixty Seven
in transit mixer for any lead having continuous agitated mixer, Paise Only
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Third Floor
Note:- Refer General Note for Concrete as per Item No.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc. Rupees Six
propping and centering below supporting floor to ceiling and Thousand Six
87 184.42 removal of the same for in situ reinforced concrete and plain Cum Hundred Seventy
concrete work in flat surfaces such as soffits of suspended floors Four and Eight Paise
slabs, incline slab, Landings walls, Fins and beams, column and Only
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
i) Fourth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Rupees Six
including centring shuttering strutting and propping etc.
Thousand Seven
propping and centering below supporting floor to ceiling and
88 184.42 Cum Hundred Fifteen
removal of the same for in situ reinforced concrete and plain 6,715.49
and Forty Nine Paise
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(C) RCC Slab
i) Fifth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system Rupees Six
including centring shuttering strutting and propping etc. Thousand Seven
89 184.42 propping and centering below supporting floor to ceiling and Cum Hundred Fifty Six
removal of the same for in situ reinforced concrete and plain and Ninety Paise
concrete work in flat surfaces such as soffits of suspended floors Only
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(C) RCC Slab
i) Sixth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Rupees Six
shuttering & Providing formwork of steel cup lock system
Thousand Seven
including centring shuttering strutting and propping etc.
90 184.42 Cum Hundred Ninety
propping and centering below supporting floor to ceiling and 6,798.31
Eight and Thirty One
removal of the same for in situ reinforced concrete and plain
Paise Only
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Seventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring, Rupees Six
shuttering & Providing formwork of steel cup lock system Thousand Eight
91 184.42 including centring shuttering strutting and propping etc. Cum Hundred Thirty Nine
propping and centering below supporting floor to ceiling and and Seventy Two
removal of the same for in situ reinforced concrete and plain Paise Only
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Eighth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
Rupees Six
shuttering by using 18 mm thick water proof ply in centring,
Thousand Eight
shuttering & Providing formwork of steel cup lock system
92 184.42 Cum Hundred Eighty One
including centring shuttering strutting and propping etc. 6,881.13
and Thirteen Paise
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Nineth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering , Rupees Six
shuttering by using 18 mm thick water proof ply in centring, Thousand Nine
93 184.42 shuttering & Providing formwork of steel cup lock system Cum Hundred Twenty
including centring shuttering strutting and propping etc. Two and Fifty Four
propping and centering below supporting floor to ceiling and Paise Only
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Tenth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
Rupees Six
transit mixer to site of laying, cost of water tight Centering
Thousand Nine
shuttering by using 18 mm thick water proof ply in centring,
94 184.42 Cum Hundred Sixty Three
shuttering & Providing formwork of steel cup lock system 6,963.95
and Ninety Five
including centring shuttering strutting and propping etc.
Paise Only
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
recommended proposition as per IS:9103 to accelerated, retard,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering , Rupees Seven
95 55.73 shuttering by using 18 mm thick water proof ply in centring, Cum Thousand Five and
shuttering & Providing formwork of steel cup lock system Thirty Six Paise Only
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs, incline slab, Landings walls, Fins and beams, column and
the like, floors etc & sides and soffits of beams, Haunching
cantilevers Girders, using grouting if required, admixture in
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
recommended proposition as per IS:9103 to accelerated, retard,
setting of concrete, improve workability as per direction of
engineer in charge and approved , rates includes all
levels/Height/Depth of work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Slab
i) Above Eleventh Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Rupees Six
cement concrete work including pumping of batching plant from
Thousand Six
transit mixer to site of laying, cost of water tight Centering
96 19.16 Cum Hundred Fourteen
shuttering by using 18 mm thick water proof ply in centring, 6,614.49
and Forty Nine Paise
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) Ground Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced Rupees Six
cement concrete work including pumping of batching plant from Thousand Six
97 19.16 transit mixer to site of laying, cost of water tight Centering , Cum Hundred Fifty Five
shuttering by using 18 mm thick water proof ply in centring, and Ninety Paise
shuttering & Providing formwork of steel cup lock system Only
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) First Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer,
Rupees Six
manufactured as per mix design of specified grade for reinforced
Thousand Six
cement concrete work including pumping of batching plant from
98 19.16 Cum Hundred Ninety
transit mixer to site of laying, cost of water tight Centering , 6,697.31
Seven and Thirty
shuttering by using 18 mm thick water proof ply in centring,
One Paise Only
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) Second Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer, Rupees Six
manufactured as per mix design of specified grade for reinforced Thousand Seven
99 19.16 cement concrete work including pumping of batching plant from Cum Hundred Thirty
transit mixer to site of laying, cost of water tight Centering , Eight and Seventy
shuttering by using 18 mm thick water proof ply in centring, Two Paise Only
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) Third Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work
in transit mixer for any lead having continuous agitated mixer, Rupees Six
manufactured as per mix design of specified grade for reinforced Thousand Seven
cement concrete work including pumping of batching plant from 6,780.13 Hundred Eighty and
transit mixer to site of laying, cost of water tight Centering , Thirteen Paise Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) Fourth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work Rupees Six
in transit mixer for any lead having continuous agitated mixer, Thousand Eight
101 19.16 manufactured as per mix design of specified grade for reinforced Cum Hundred Twenty
cement concrete work including pumping of batching plant from One and Fifty Four
transit mixer to site of laying, cost of water tight Centering , Paise Only
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
including centring shuttering strutting and propping etc.
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) Fifth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Six
in fully automatic batching plant and transported to site of work
Thousand Eight
in transit mixer for any lead having continuous agitated mixer,
102 19.16 Cum Hundred Sixty Two
manufactured as per mix design of specified grade for reinforced 6,862.95
and Ninety Five
cement concrete work including pumping of batching plant from
Paise Only
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
shuttering & Providing formwork of steel cup lock system
Sr. Estimate Estimated Rate
Description of item Unit Amount
In Figure In Word
including centring shuttering strutting and propping etc.
propping and centering below supporting floor to ceiling and
removal of the same for in situ reinforced concrete and plain
concrete work in flat surfaces such as soffits of suspended floors
slabs Landings walls, Fins and beams, column and the like, floors
etc & sides and soffits of beams, Haunching cantilevers Girders,
using grouting if required, admixture in recommended
proposition as per IS:9103 to accelerated, retard, setting of
concrete, improve workability as per direction of engineer in
charge and approved , rates includes all levels/Height/Depth of
work, excluding reinforcement.
(No extra will be paid in variation of cement level, minimum
cement level will be as per IS 456) for reinforced concrete work
(C) RCC Stair Case
i) Sixth Floor
Note:- Refer General Note for Concrete as per Item No.
Providing and laying in position M-300 grade concrete for
reinforced cement concrete work, using cement concrete work
using cement content as per approved Design Mix manufactured
Rupees Six
in fully automatic batching plant and transported to site of work
Thousand Nine
103 19.16 in transit mixer for any lead having continuous agitated mixer, Cum
6,904.36 Hundred Four and
manufactured as per mix design of specified grade for reinforced
Thirty Six Paise Only
cement concrete work including pumping of batching plant from
transit mixer to site of laying, cost of water tight Centering
shuttering by using 18 mm thick water proof ply in centring,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
03-Specification Plumbing Work.pdf
04-General Technical Specifications Electrical Works.pdf
05-Specifications Safety Norms.pdf
06-Specifitions Shuttring.pdf
07-Specifications_ELV 17.7.24.pdf
08-Specification Fire fighting Work.pdf
09-Special Condition.pdf
11-Instruction on site.pdf
12-Defects Libility GR R B.pdf
13-GR-Cement Cosmptn TMT.pdf
14-Labour Cess - GR - Page-01 (1).pdf
15-Labour Cess - GR - Page-02 (1).pdf
16-Labour Cess - GR - Page-03.pdf
17-Above below GR.pdf
18-GTS Ele.pdf
19-ijaradar-ok.pdf
10 6372 Make List HO 15.10.2025-1.pdf
20.1-GTS Civil compressed.pdf
20-GTS Civil compressed.pdf
03.1-Technical Specification Civil.pdf
03.2-Technical Specification Plumbing.pdf
03.3-Technical Specification_ELECTRICAL_NURSING MORBI.pdf
03.4-Technical Specification_ELV_NURSING MORBI.pdf
03.5-Technical Specification_HVAC_Nursing College Morbi.pdf
03.6-Technical Specification_LIFT_NURSING MORBI_23.09.2026.pdf
04. Special Condition of Contract.pdf
05A. Standard of Work_Applicable_900.pdf
06.Building-Specification-Part-I.pdf
06.Building-Specification-Part-II.pdf
06.Building-Specification-Part-III.pdf
06.Building-Specification-Part-IV.pdf
06A Special Condition of Contract - 2.pdf
06B Health and Safety Work.pdf
07 General Condition of Contract.pdf
07.Electrcial specification booklet_1.pdf
07.Electrcial specification booklet_2.pdf
07.Electrcial specification booklet_3.pdf
07.Electrcial specification booklet_4.pdf
07.Electrcial specification booklet_5.pdf
07.Electrcial specification booklet_6.pdf
Schedule - B.pdf
Drawing page 3.pdf
Page 2.pdf
Page 1.1.pdf
Page 1.2.pdf
01.-SBD - MORBI NURSING COLLEGE_16.11.2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .