| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹50.5 LAdmitted-Finance 183 NS ROAD DEBASISH GHOSH UTTARPARA HOOGHLY UTTARPARA HOOGHLY WEST BENGAL 712258 | HOOGHLY | WEST BENGAL | 712258 | ₹50.5 L | Admitted-Finance |
| 2 | ₹51.1 LAdmitted-Finance GROUND FLOOR KHASRA NO KOTLA HOUSE 12 BISWA HOLI GROUND GURGAON VILLAGE NEAR SECTOR 5 POLICE STATION GURUGRAM | ₹51.1 L | Admitted-Finance |
| 3 | ₹62.0 LAdmitted-Finance 1 336 VIRAT KHAND VIRAT KHAND VIRAT KHAND VIRAT KHAND VILLAGE TOWN VIRAT KHAND CITY GOMTINAGAR LUCKNOW UTTAR PRADESH 226010 INDIA | LUCKNOW | UTTAR PRADESH | 226010 | ₹62.0 L | Admitted-Finance |
| 4 | ₹94.6 LAdmitted-Finance | ₹94.6 L | Admitted-Finance |
| 5 | ₹1.3 CrAdmitted-Finance 215 STADIUM ROAD NARANPURA AHMEDABAD GUJARAT 380013 | AHMADABAD | GUJARAT | 380013 | ₹1.3 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | Emeral Energy Solutions pvt ltd | Oorja On Move Infra Pvt Ltd | DHRUVNANDA VENTURES PRIVATE LIMITED | OXYBEE SOLUTIONS PVT LTD | Sunshell Power Ventures Private Limited |
|---|---|---|---|---|---|---|---|---|
| 1.00For Services (Maintenance of SPP 1850 kWp, 1st year) | ||||||||
| 1.01 | Maintenance of SPP SB-Pipe Shop(90kWp), 1st year | 24 | Nos | 2,16,000 ₹2,54,880 | 99,696 ₹1,17,641.28 | 1,10,160 ₹1,29,988.8 | 1,72,800 ₹2,03,904 | 76,872 ₹90,708.96 Lowest |
| 1.02 | Maintenance of SPP EY-Pipe Shop(191kWp), 1st year | 24 | Nos | 4,56,000 ₹5,38,080 | 2,11,560 ₹2,49,640.8 | 2,33,784 ₹2,75,865.12 | 3,66,720 ₹4,32,729.6 | 1,45,505.52 ₹1,71,696.51 Lowest |
| 1.03 | Maintenance of SPP P&A Shop(67kWp), 1st year | 24 | Nos | 1,60,800 ₹1,89,744 | 74,208 ₹87,565.44 | 82,008 ₹96,769.44 | 1,28,640 ₹1,51,795.2 | 57,776.16 ₹68,175.87 Lowest |
| 1.04 | Maintenance of SPP Bond Store(42kWp), 1st year | 24 | Nos | 1,00,800 ₹1,18,944 | 46,512 ₹54,884.16 Lowest | 51,408 ₹60,661.44 | 80,640 ₹95,155.2 | 3,12,001.92 ₹3,68,162.27 |
| 1.05 | Maintenance of SPP SB-Sheet Metal Shop(100kWp), 1st year | 24 | Nos | 2,30,400 ₹2,71,872 | 95,256 ₹1,12,402.08 | 1,22,400 ₹1,44,432 | 1,92,000 ₹2,26,560 | 86,232 ₹1,01,753.76 Lowest |
| 1.06 | Maintenance of SPP NY Assembly Shop(280kWp), 1st year | 24 | Nos | 6,72,000 ₹7,92,960 | 1,66,320 ₹1,96,257.6 Lowest | 3,42,720 ₹4,04,409.6 | 5,37,600 ₹6,34,368 | 2,41,452.96 ₹2,84,914.49 |
| 1.07 | Maintenance of SPP FOB Shop rooftop(80kW), 1st year | 24 | Nos | 1,92,000 ₹2,26,560 | 47,520 ₹56,073.6 Lowest | 97,920 ₹1,15,545.6 | 1,53,600 ₹1,81,248 | 68,986.56 ₹81,404.14 |
| 1.08 | Maintenance of SPP Alcock Yard Workshop(350KWp), 1st year | 24 | Nos | 8,40,000 ₹9,91,200 | 3,33,408 ₹3,93,421.44 | 4,28,400 ₹5,05,512 | 6,72,000 ₹7,92,960 | 3,01,816.32 ₹3,56,143.26 Lowest |
| 1.09 | Maintenance of SPP Cradle Assembly Shop & EY Store Building terrace (200kWp), 1st Year | 24 | Nos | 4,80,000 ₹5,66,400 | 1,90,512 ₹2,24,804.16 | 2,43,288 ₹2,87,079.84 | 3,84,000 ₹4,53,120 | 1,72,466.4 ₹2,03,510.35 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
14 Jul 2025, 3:00 pmClosed
Subhashini Kanwar
OTS, MDL, Dockyard Road, Mumbai
Bi-annual Rate Contract BRC for Maintenance of 1850 Kwp Solar Power Plants Installed at Various Rooftops in Mazagon Dock Shipbuilders Ltd. And Supply of Spares
2025_MDL_97618_1
6000001670
Open Tender
Miscellaneous Services
Service
730 days
MDL, Dockyard Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.5 L
Yes
3 Oct 2025
16 Jun 2025
16 Jul 2025
16 Jun 2025
14 Jul 2025
16 Jun 2025
For Services (Maintenance of SPP 1850 kWp, 1st year)
Maintenance of SPP SB-Pipe Shop(90kWp), 1st year
Maintenance of SPP EY-Pipe Shop(191kWp), 1st year
Maintenance of SPP P&A Shop(67kWp), 1st year
Maintenance of SPP Bond Store(42kWp), 1st year
Maintenance of SPP SB-Sheet Metal Shop(100kWp), 1st year
Maintenance of SPP NY Assembly Shop(280kWp), 1st year
Maintenance of SPP FOB Shop rooftop(80kW), 1st year
Maintenance of SPP Alcock Yard Workshop(350KWp), 1st year
Maintenance of SPP Cradle Assembly Shop & EY Store Building terrace (200kWp), 1st Year
Maintenance of SPP Anik Chembur Yard Shed A & PPT Plant (450kWp), 1st Year
For Services (Maintenance of SPP 1850 kWp, 2nd year)
Maintenance of SPP SB-Pipe Shop(90kWp), 2nd Year
Maintenance of SPP EY-Pipe Shop(191kWp), 2nd Year
Maintenance of SPP P&A Shop(67kWp), 2nd Year
Maintenance of SPP Bond Store(42kWp), 2nd Year
Maintenance of SPP SB-Sheet Metal Shop (100kWp), 2nd Year
Maintenance of SPP NY Assembly Shop(280kWp), 2nd Year
Maintenance of SPP FOB Shop rooftop(80kW), 2nd Year
Maintenance of SPP Alcock Yard Workshop(350KWp), 2nd Year
Maintenance of SPP Cradle Assembly Shop & EY Store Building terrace (200kWp), 2nd Year
Maintenance of SPP Anik Chembur Yard Shed A & PPT Plant (450kWp), 2nd Year
For Spares
Supply, Installation and commissioning 25kW Inverter with inbuilt display (preferably) as & When required with 1 Year OEM Warranty after commissioning (KSolar/SMA/DELTA/ABB/KACO/Waaree or equivalent make)
Supply, Installation and commissioning 30kW Inverter with inbuilt display (preferably) as & When required with 1 Year OEM Warranty after commissioning (KSolar/SMA/DELTA/ABB/KACO/Waaree or equivalent make)
Supply, Installation and commissioning 50 kW Inverter with inbuilt display (preferably) as & When required with 1 Year OEM Warranty after commissioning (KSolar/SMA/DELTA/ABB/KACO/Waaree or equivalent make)
Supply, replacement, installation testing and commissioning of Grade-A, Solar module(monocrystalline) of capacity from 250 Wp to 350 Wp as & when required with minimum 1 Year OEM Warranty after commissioning (Dimensions and bolting arrangement should match as per existing structure, All the technical parameter should not violate). Vendor to quote per unit rate that is 1 Wp or 1 Was 1 Number.
Supply, replacement, installation testing and commissioning of Grade-A, Solar module (Poly crystalline) of capacity from 300 WP to 550Wp as & when required with minimum 1 Year OEM Warranty after commissioning (Dimensions and bolting arrangement should match as per existing structure, All the technical parameter should not violate). Vendor to quote per unit rate that is 1 Wp or 1 W as 1 number.
Supply, Installation and commissioning MC4 Connectors, Rated Voltage 1000 V DC
Supply, Installation and commissioning Solar DC flexible Cable 1core x 4 Sq.mm Vendor to quote per unit rate that is 1 Meter as 1 Number.
Supply, Installation and commissioning Solar DC flexible Cable 1core x 6 Sq.mm Vendor to quote per unit rate that is 1 Meter as 1 Number
Supply, Installation and commissioning Solar DC flexible Cable 1core x 10 Sq.mm Vendor to quote per unit rate that is 1 Meter as 1 Number.
Supply, Installation and commissioning Supply of water pipe (CPVC) – 25mm, Dia. Vendor to quote per unit rate that is 1 Meter as 1 Number.
Supply, Installation and commissioning of Water tap for Water pipeline(CPVC) – 25 mm ,Dia
Supply, Installation and commissioning of Elbows for Water pipeline(CPVC) – 25mm Dia
Supply, Installation and commissioning of PVC Flexible Hose Pipe 25mm, Dia Vendor to quote per unit rate that is 1 Meter as 1 number.
Supply, Installation and commissioning of DCDB /AJB (Array Junction Box), Polycarbonate material 6 in 6 out with 3 SPD , 20KW to 35KW
Supply, Installation and commissioning of DCDB /AJB (Array Junction Box), Polycarbonate material 4 in 4 out with 3 SPD , 20KW to 35KW
Supply, Installation and commissioning of DCDB /AJB (Array Junction Box), Polycarbonate material 10 in 10 out with 5 SPD, 45KW to 60KW
3 Phase water pump with motor of 1.5hp.
1 Phase water pump of 5hp.
Supply, Installation and commissioning of Water tank (5000 liters)
Supply, Installation and commissioning of Water tank (7500 liters)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .