| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.8 L+₹2.2 L (7.20%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHAFEEK K K L2 | JAMEEZ M L1 |
|---|---|---|---|---|---|
| 1.00Thoppilmukku Gurumandiram Road Concreting | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 57.75 | cum | 257 ₹14,841.75 | 250 ₹14,437.5 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 53.38 | cum | 310 ₹16,546.25 | 300 ₹16,012.5 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 300.77 | cum | 9,230 ₹27,76,097.87 | 8,600 ₹25,86,613.4 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.06 | cum | 9,960 ₹30,507.48 | 9,000 ₹27,567 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 153.15 | kilogram | 110 ₹16,846.5 | 100 ₹15,315 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 29.93 | sqm | 381 ₹11,401.43 | 380 ₹11,371.5 Lowest |
| 1.01 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 317.99 | kg | 220 ₹69,956.92 | 200 ₹63,597.2 Lowest |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 26.56 | kilogram | 110 ₹2,921.16 | 100 ₹2,655.6 Lowest |
| 1.01 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 13.49 | sqm | 252 ₹3,399.23 | 250 ₹3,372.25 Lowest |
Tender Value
₹33.0 L
EMD Value
₹50,000
Closing Date
19 Mar 2026, 6:00 pmClosed
Executive Engineer
o/o the Executive Engineer KIP LB Div no 5 kollam
LAC ADS KIP RB 2025 26 Thevalakkara Grama Panchayath Ward 6 Concreting of canal bund road from Thoppilmukku to Gurumandiram on the left bank of Chavara Distributary canal Ward 5 PulimoottilKadavu Karamel Bhagam bund road concreting second reach on
2026_Irrig_846252_1
IRR/PII/TR/797/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Thevalakkara
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹50,000
29 Jul 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
11 Mar 2026 - 19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Thoppilmukku Gurumandiram Road Concreting | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | - | - |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.006 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.007 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 0.4 | kg | - | - |
| 1.008 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kilogram | - | - |
| 1.009 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429602.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbdtg.pdf
Tender Documents • 2.44 MB
BOQ_1429602.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .