Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.5 LAccepted-AOC | ₹36.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.1 LRejected-Finance | ₹40.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K.T. DEVASIA L2 | JOHN K U L1 |
|---|---|---|---|---|---|
| 1.00Side Protection | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 345 | sqm | 16.1 ₹5,554.50 | 14.6 ₹5,037 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 234.6 | cum | 228.18 ₹53,531.03 | 207 ₹48,562.20 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 80 | hour | 404.52 ₹32,361.60 | 368 ₹29,440 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 889.41 | cum | 3,537.14 ₹31.5 L | 3,216 ₹28.6 L |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 50.72 | cum | 9,290.25 ₹4.7 L | 8,447 ₹4.3 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,028.6 | kilogram | 99.57 ₹2.0 L | 90 ₹1.8 L |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 138.22 | sqm | 743.66 ₹1.0 L | 676 ₹93,437.40 |
Tender Value
₹42.3 L
EMD Value
₹50,000
Closing Date
24 Dec 2025, 6:00 pmClosed
Executive Engineer Minor Irrigation Division Kannu
Office of the Executive Engineer Minor Irrigation Division Kannur (PO) Civil station Kannur 670002
GENERAL Budget 2025 26 Cherupuzha thodu Urgent Side Protection work of Cherupuzha thodu in Cherupuzha Grama Panchayath Payyannur Constituency in Kannur District General Civil Work
2025_Irrig_822034_1
IRR/IA/TR/4051/2025_5_1_1/1
Open Tender
Civil Works - Others
180 days
Cherupuzha
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
7 Mar 2026
16 Dec 2025
27 Dec 2025
16 Dec 2025
24 Dec 2025
16 Dec 2025
Work Name:GENERAL-Budget 2025-26 Cherupuzha thodu -Urgent Side Protection work of Cherupuzha thodu in Cherupuzha Grama Panchayath Payyannur Constituency in Kannur District.-General Civil Work
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1377794.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 2.20 MB
BOQ_1377794.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid