Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹8.4 L+₹26,520.61 (3.27%)Accepted-Finance | 2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Vazhiparambil Constructions L1 | Jaice Kuriakose L2 |
|---|---|---|---|---|---|
| 1.00Road construction | |||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 289 | cum | 64 ₹18,496 Lowest | 66.04 ₹19,085.56 |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 67.05 | cum | 900 ₹60,345 Lowest | 930.53 ₹62,392.04 |
| 1.00 | OD112551/2025-2026:Earth filling (excluding rocks) in trenches , plinth, sides of foundation etc. in layers not exceeding 20 cm | 50 | cum | 316 ₹15,800 Lowest | 327.78 ₹16,389 |
| 1.00 | OD112561/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labor charges etc. complete as per direction of Departmental officers at sit | 62.25 | cum | 3,981 ₹2,47,817.25 Lowest | 4,110.3 ₹2,55,866.18 |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 1.05 | cum | 9,461 ₹9,934.05 Lowest | 9,768.4 ₹10,256.82 |
| 1.01 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.04 | tonne | 96,586 ₹3,573.68 Lowest | 99,715.01 ₹3,689.46 |
| 1.01 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 49.27 | cum | 9,151 ₹4,50,915.53 Lowest | 9,448.99 ₹4,65,598.98 |
| 1.01 | OD112550/2025-2026:Supplying and fixing granite name board | 1 | each | 3,821 ₹3,821 Lowest | 3,945.08 ₹3,945.08 |
Tender Value
₹8.5 L
EMD Value
₹21,185
Closing Date
4 Feb 2026, 10:00 amClosed
EXECUTIVE ENGINEER
LSGD DIVISION, JILLA PANCHAYATH, KOTTAYAM
LAC-ADS- 23298/2024-2025 MLA- LAC-ADS Kanjirapally Constituency- Sri.Jayaraj MLA Improvements to Varaputhripady Hidwayikunnu Road in Vellavoor GP- General Civil Work ( RETENDER)
2026_LSGD_827923_19
21/2025-26/EE/LID and EW
Open Tender
Civil Works - Roads
Item Rate
240 days
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
₹21,185
Yes
30 Apr 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
Road construction
3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
OD112551/2025-2026:Earth filling (excluding rocks) in trenches , plinth, sides of foundation etc. in layers not exceeding 20 cm
OD112561/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of Departmental officers at sit
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD112550/2025-2026:Supplying and fixing granite name board
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1396557.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
EPAY.pdf
Tender Documents • 0.23 MB
PRE12.pdf
Tender Documents • 0.26 MB
SBD12.pdf
Tender Documents • 1.84 MB
BOQ_1396557.xls
BOQ • 0.23 MB
IPACT.pdf
Tender Documents • 0.23 MB
AFFI12.pdf
Tender Documents • 0.24 MB
FOT12.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .