Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC NEAR PETROL PUMP TALLI BAGHI BHAGIRATHI PURAM TEHRI GARHWAL PIN 249131 | BHAGIRATHI PURAM | TEHRI GARHWAL | UTTARAKHAND | 249131 | ₹31.5 L | L1 | Accepted-AOC ok |
| 2 | L2₹32.1 LRejected-AOC GRAM ONALGAON POST LAMBGAON DISTRICT TEHRI GARHWAL 249001 | TEHRI GARHWAL | UTTARAKHAND | 249001 | ₹32.1 L | L2 | Rejected-AOC not ok |
| 3 | L3₹32.8 LRejected-AOC B 3 9C BAURARI NEW TEHRI DISTRICT TEHRI GARHWAL PIN 249001 | TEHRI GARHWAL | UTTARAKHAND | 249001 | ₹32.8 L | L3 | Rejected-AOC not ok |
Tender Value
₹31.6 L
EMD Value
₹63,262
Closing Date
22 Jan 2026, 5:00 pmClosed
AGM(PLANNING/PROCUREMENT)
THDC INDIA LIMITED, Bhagirathi Bhawan, Bhagirathipuram, Tehri, Pin-249124
Miscellaneous Civil Maintenance and Painting work in Rehabilitation Building at New Tehri
2026_THDC_893107_1
THDC/TEHRI/PROC/LIMITED/ 2025-26/45
Limited
Civil Works
THDCIL, New Tehri
As per Tender Document
3 documents required · 3 mandatory
₹1,770
Yes
THDC India Limited
₹63,262
23 Feb 2026
8 Jan 2026
23 Jan 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
1. Annual Operation of Koteshwar Colony at (Intake & Jaurasi Nala) pumping station under KHEP Water supply Scheme by deploying skilled and un skilled Man power in three shift as and when required for operation of various type of pump sets of different capacities installed at both pumping station as per direction of Engineering incharge including watch and ward of pumping station and its surrounding area, minor maintenance of valves. taking for one year, average 08 Hrs per day for Intake P/S and 16 Hrs per day for Jaurasi Nala P/S. Intake P/s (365*08)= 2920 Hrs. and Jaurasi Nala Main P/S (365*16)= 5840 Hrs (Total 2920 + 5840 = 8760 Hrs)
Note: 1. GST will be paid extra & Labour cess @ 1 % will also be paid extra ,if apllicable , as per law/rules of Govt. of India . 2. EPF,ESI & Bonus shall be paid to the contractor based on documentary proof, Limited to EPF & ESI (Rs. 2,76,570/-) and Bonus (Rs. 1,41,774/-) . . 3. T&P to execute the subject work shall be provided by the contractor and shall be part of C.P. & OH To be quoted by contractor.
Summary Sheet
Miscellaneous Civil Maintenance & Painting work in Rehabilitation Building at New Tehri.
EPF/ESI on employer's part
Total
Labour Cess(@1%)
Total Cost of Estimate
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
TenderDocument.pdf
Tender Documents • 2.28 MB
BOQ_938735.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid