| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-Finance | ₹4.4 Cr | L1 | Accepted-Finance lowest |
| 2 | L2₹4.5 Cr+₹8.4 L (1.92%)Rejected-Finance V P O SHARLI MANPUR TEHSIL PAONTA DISTT SIRMOUR H P | SIRMAUR | HIMACHAL PRADESH | 173001 | ₹4.5 Cr+₹8.4 L (1.92%) | L2 | Rejected-Finance Not lowest |
| 3 | L3₹5.2 Cr+₹85.0 L (19.4%)Rejected-Finance 601 6TH FLOOR SURYA ICON NEAR TORRENT POWER OFFICE NEAR SURYA KUTIR NARANPURA AHMEDABAD AHMEDABAD GUJARAT 380013 | AHMADABAD | GUJARAT | 380013 | ₹5.2 Cr+₹85.0 L (19.4%) | L3 | Rejected-Finance Not lowest |
| 4 | L4₹5.2 Cr+₹86.5 L (19.8%)Rejected-Finance HIMACHAL PRADESH HP | BILASPUR | HIMACHAL PRADESH | 174001 | ₹5.2 Cr+₹86.5 L (19.8%) | L4 | Rejected-Finance Not lowest |
| 5 | L5₹6.8 Cr+₹2.4 Cr (55.0%)Rejected-Finance | ₹6.8 Cr+₹2.4 Cr (55.0%) | L5 | Rejected-Finance Not lowest |
Tender Value
₹7.6 Cr
EMD Value
₹15.3 L
Closing Date
23 Feb 2026, 10:00 amClosed
Executive Engineer
HP PWD Division Shillai
Construction of link Road from Chilogn Bag Tilwagi Chowki Margwal Km. 0/0 to 8/0 (SH- C/o Earth work, cross Drainage work, unlined drain, soling crash barrier and dumping structure in Km. 0/0 to 8/0 (Under NABARD RIDF-XXXII
2026_PWD_128409_1
NIT-13867-13867Dt.09-02-2026
Open Tender
Civil Works - Roads
Percentage
365 days
Shillai
Please refer to tender Document
23 documents required · 23 mandatory
₹10,000
EE Shillai
₹15.3 L
10 Apr 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD 2014 technical specification Clause 1603.1, 1603.2 section 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones that tune of 18758.61 Cum quantity (Eighteen thousand seven hundred fifty eight point sixty one) cubic metres at the rate of 300/- (Rupees three hundred ) per cubic metre shall be effected from the contractor's running bills on pro-rate basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Earth work in excavation for all type of road structure such as retaining walls,Breast walls,culverts,drainds and parapets etcetra. in all types of classification of soil comprising of ordinary soil ,ordinary rock and hard rocks, chiselling/wedging out of rock (where blasting is prohibited) as per drawing and MORD 2014 Technical specifications Clause 305, 1101.4, 1603.4 section 300 & 1600 and as per direction of Engineer in Charge including setting out, shoring and bracing, removal of stumps and other deleterious material and disposal of material up to any lead and upto any lift, including dressing of sides and bottom and back filling in trenches with excavated suitable material to the orignal surface in layers not exceeding 150 mm (one hundred fifty milimeters) compected thickness including sorting and sturting and pumping and bailing out water (surface and sub soil water) up to all depth or any quantum of water including cleaning of slush which may arise out during dewatering . Protection work ,The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
RCC Box Culvert
RCC Slab Culvert
Crash Barrier
Parapet
Dumping Structure
Providing and Laying mechanically mixed and vibrated concrete for plain cement concrete nominal mix 1:4:8 (one cement : four sand : Eight graded crushed / broken stone agregate 40 mm (Forty milimetre) nominal size for plain/reinforced concrete in open foundation complete in or under water complete including pumping or bailing out water dewatering removal of slush as required at site which may arrise at the time of laying under water complete for all heights/depths as per drawings and M O R D 2014 Specifications Clause 802, 803, 1202 and 1203 section 800 & 1200 including the cost of form work and curring complete. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Providing and laying cement concrete grade M 10 (Ten) nominal mix 1:3:6 (one cement:three sand:six graded stone graded stone aggregate 40 mm (Forty milimetre) nominal size concrete for plain/reinforced concrete in open foundations complete including form work as per drawings and M.O.R.D. 2014 technical specifications Clause 802, 803, 1202 & 1203 and section 800 & 1200 . RCC Box Culvert,The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
RCC Slab Culvert
Crash Barrier
Providing concrete for plain/ reinforced concrete in open, foundation complete as per drawings and M.O.R.D 2014 technical specification clause 802, 803, 1202 & 1203 section 800, 1200. Nominal mix 1:2.5:5 (one cement:two point five sand : five graded stone graded stone aggregate M 15 (fifteen) 40 mm (Forty milimetre) nominal size including carriage of all labour, equipments and materials to various location through all modes of transportation . RCC Box Culvert, The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Parapet
Providing concrete for plain/reinforced concrete in open Foundation complete as per drawing and technical specification clause 802, 803, 1202 & 1203. Nominal mix RCC/P.C.C. ( C.C. 1:2:4 ) ( one cement : two sand : four graded stone aggregate 20 mm (Twenty milimeter) nominal size and curing complete in all depths and heights including carriage of all labour, equipments and materials to various location through all modes of transportation . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Providing and laying RCC M25 (M-Twenty Five) with 20 mm (Twenty milimeter) nominal size reinforced cement concrete in foundation as per drawing and technical specifications Clauses 800, 1206.3. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Providing and laying RCC M25 (M- Twenty Five) 20 mm (Twenty milimeter) nominal size reinforced cement concrete in Sub-Structure as per drawing and technical specifications Clauses 800, 1206.4 . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Providing and laying RCC M25 (M-Twenty Five) 20 mm (Twenty milimeter) nominal size reinforced cement concrete in Super-Structure as per drawing and technical specifications Clauses 800, 1206.3. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202.RCC Box Culvert, The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
RCC Slab Culvert
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm ( six hundred milimeter) with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. GI Pipe 100mm Dia. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Providing and fixing Drainage spout complete as per drawing and technical specification clause 1209. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Providing and laying of boulder apron laid in wire crates with 4 mm (four milimeter) dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm (one hundred into one hundred milimeter) mesh (woven diagonally) including 10 (ten) per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg (twenty five kilograms) each as per drawing and M.O.R.D. 2014 specifications Clause 1301. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Back filling with granular material behind retaning walls, abutment wing wall and return wall complete as per drawing and M.O.R.D. 2014 specification Clause 305.3.9 & 302.3.6 section 300 Protection work .The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
RCC Slab Culvert
Providing weepholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm (one hundred milimeter) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1206.6 section 600, 700 & 1200 .Protection work , The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
RCC Box Culvert
RCC Slab Culvert
Construction of unlined surface drains of average cross-sectional area 0.40 sqm (zero point forty square meter) in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m (three meter) and lead of 50 m (fifty meter) (average lead 25 m (twenty five meter)) as per Technical Specification Clause 307. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Preparation of sub grade by dressing to camber (Earth work for the cutting involved for sub-grade to be paid for separatly) depending upon the classification of soil) completed as per M.O.R.D. 2014 Technical Specification Clause 303.1 and Section 300. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Consolidation of subgrade with road roller with three wheel steel/vibratory 80-100KN (eighty to hundred kilo Newton) including making good the undulation etc. with earth or quarry soil etc.and re-rolling the sub- grade complete as per M.O.R.D. 2014 Technical Specification Clause 303.1 and section 300. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per M.O.R.D. 2014 Technical Specification clause 303.1 and section 300.The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 150-200 mm thick (one hundred to Two Hundred milimeter).RCC Slab Culvert, The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
Soling
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm (three milimeter) thick corrugated sheet metal beam rail, 70 cm (seventy centimeter) above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm (one fifty into seventy five into five milimeter) spaced 2 m (two meter) centre to centre, 1.8 m (one point eight meter) high, 1.1 m (one point one meter) below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm (one fifty into seventy five into five milimeter), 330 mm (three hundred thirty milimeter) long complete as per clause 810. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.
stage.html
html • 0.05 MB
technical_189769.pdf
techsummary_189769.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Limitofwork.pdf
Additional Documents • 1.05 MB
BOQ_189769.xls
BOQ • 0.33 MB
SBD.pdf
Tender Documents • 1.48 MB
GST.pdf
Additional Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .