Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹9.2 L+₹2.6 L (39.9%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | PAREETH V V L2 | AL GAANAM ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00Dismantling and fixing-back of pipelines & fittings for choke clearing at NP Plant, FACT CD. | |||||
| 1.01 | Dismantling and Fixing back of FUME SCRUBBER RING HEADER & VENTURI SCRUBBER RING HEADER Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as fume scrubber ring header lines and nozzles, suction and discharge lines of fume scrubber pumps etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 6,600 | INM | 4,62,000 ₹4,62,000 | 3,63,000 ₹3,63,000 Lowest |
| 1.02 | Dismantling and Fixing back of DRYER SCRUBBER AND COOLER SCRUBBER RING HEADER Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as the suction and discharge lines of cooler and dryer scrubber pumps, inner and outer ring header lines, and nozzles for cooler and dryer scrubbers etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 2,000 | INM | 1,40,000 ₹1,40,000 | 90,000 ₹90,000 Lowest |
| 1.03 | Dismantling and Fixing back of OLD PAP AND NEW PAP ACID Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such old and new phosphoric acid lines from PAP (NP area only) to day tanks, PAT lines, etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 2,000 | INM | 1,40,000 ₹1,40,000 | 90,000 ₹90,000 Lowest |
| 1.04 | Dismantling and Fixing back of Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as both KO chambers ring header line and nozzles ,split box to reactor line,etc must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 2,500 | INM | 1,75,000 ₹1,75,000 | 1,12,500 ₹1,12,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
23 Nov 2026, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Dismantling and fixing-back of pipelines and fittings for choke clearing at NP Plant, FACT CD
2026_FACT_933612_1
4096/2026-2027/E34406
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
24 Nov 2026
7 Nov 2026
24 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling and fixing-back of pipelines & fittings for choke clearing at NP Plant, FACT CD. | |||||
| 1.01 | Dismantling and Fixing back of FUME SCRUBBER RING HEADER & VENTURI SCRUBBER RING HEADER Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as fume scrubber ring header lines and nozzles, suction and discharge lines of fume scrubber pumps etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 6,600 | INM | - | - |
| 1.02 | Dismantling and Fixing back of DRYER SCRUBBER AND COOLER SCRUBBER RING HEADER Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as the suction and discharge lines of cooler and dryer scrubber pumps, inner and outer ring header lines, and nozzles for cooler and dryer scrubbers etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 2,000 | INM | - | - |
| 1.03 | Dismantling and Fixing back of OLD PAP AND NEW PAP ACID Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such old and new phosphoric acid lines from PAP (NP area only) to day tanks, PAT lines, etc., must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 2,000 | INM | - | - |
| 1.04 | Dismantling and Fixing back of Pipelines & Fittings to Facilitate Choke Clearing in NP Plant A & B streams and Offsite area.
Work Involves: Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as both KO chambers ring header line and nozzles ,split box to reactor line,etc must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract. | 2,500 | INM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.09 MB
Tenderdocuments.pdf
Tender Documents • 1.34 MB
BOQ_981095.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .