| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance 86 HARIDAS DUTTA ROAD JAYNAGAR DIST SOUTH 24 PARGANAS PIN 743337 | 24 PARAGANAS SOUTH | WEST BENGAL | 743337 | ₹3.8 L | L1 | Accepted-Finance L 1 |
| 2 | L 2₹4.4 LRejected-Finance DREAM APARTMENT ARABINDA PALLY BARASAT N 24 PGS KOL 700125 | BARASAT | NORTH 24 PARGANAS | WEST BENGAL | 700125 | ₹4.4 L | L 2 | Rejected-Finance L 2 |
| 3 | L 3₹5.1 LRejected-Finance BOICHIPOTA ANANDANAGAR SINGUR DIST HOOGHLY PIN 712409 WEST BENGAL | SINGUR | HOOGHLY | WEST BENGAL | 712409 | ₹5.1 L | L 3 | Rejected-Finance L 3 |
| 4 | L 4₹5.9 LRejected-Finance | ₹5.9 L | L 4 | Rejected-Finance L 4 |
| 5 | L 5₹6.4 LRejected-Finance 722 NETAJI BLOCK P O CHOWHATI P S SONARPUR DIST SOUTH 24 PARGANAS PIN 700149 | SONARPUR | SOUTH 24 PARGANAS | WEST BENGAL | 700149 | ₹6.4 L | L 5 | Rejected-Finance L 5 |
Tender Value
₹14.8 L
EMD Value
₹29,610
Closing Date
9 Feb 2026, 1:00 pmClosed
EXECUTIVE ENGINEERS BNED PWDTE
ROOM NO 118 and 119, 1ST FLOOR, PURTA BHAVAN, DF BLOCK, SECTOR I, SALT LAKE, KOLKATA 700 091
Geotechnical Sub soil investigation for the proposed Building at New Town Campus of IISWBM,at New Town under Bidhannagar East Division.
2026_WBPWD_993169_1
WBPWD/EE/BNED/NIeT31/25-2026
Open Tender
CIVIL WORKS
90 days
New Town
Please refer Tender documents.
4 documents required · 4 mandatory
₹29,610
Yes
27 Feb 2026
22 Jan 2026
11 Feb 2026
23 Jan 2026
9 Feb 2026
23 Jan 2026
Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge a) Detailed Investigation
Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation. Some samples are to be kept at Sub-Division Office for Additional testing By the Engineer-in-Charge.
Labour for making Bore-Holes of 150mm to 250mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting Disturbed & Un disturbed soil samples, conducting Standard Penetration Test at suitable intervals etc.) including preparation and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of Specifications for Road & Bridge Works (5th Revision), Published by IRC, and also including hire charges of tools and plants complete as per the direction of Engineer-in-Charge. a) When Casing pipe is used to prevent collapse of bore hole (casing pipe to be finally withdrawn) (i) Depth 0m to 10m
(ii) Depth greater than 10m and upto 20m
(iii) Depth greater than 20m and upto 30m
(iv) Depth greater than 30m. and upto 40m
A. Field Investigation: i) Collection of Samples from the bore hole made as per depth 0m-6m a) Undisturbed
ii) Standard Penetration Tests (S.P.T.) by Split Spoon Sampler in the bore hole as per IS 2131 (a) 0.0m - 10.0 m
iii) Load Tests of Soils (Loading arrangement shallbe done by the client) as per IS 1888. b) For evaluation of sub-grade modulus
B. Laboratory Investigation: i) Liquid Limit as per IS 2720 (Part – V).
ii) Plastic Limit as per IS 2720 (Part – V)
iii) Grain size analysis by Sieving as per IS 2720 (Part – IV).
iv) Grain size analysis by Hydrometer Method as per IS 2720 (Part – IV).
v) Determination of Water Content as per IS 2720 (Part – II)
vi) Determination of Specific Gravity as per IS 2720 (Part – III)
vii) Direct Shear Test as per IS 2720 (Part – XIII).
viii) Determination of Unconfined Compression Strength as per IS 2720 (Part – X). (a) Undisturbed
ix) Tri-Axial Shear Test. a) Determination of Shear strength Parameters of a specimen tested in Unconsolidated Undrained Tri-axial compression without measurement of pore water pressure as per IS 2720 (Part –XI).
x) Determination of Consolidation Properties as per IS 2720 (Part – XIV).
Preparation and submission of report in 6 (Six) copies, giving all relevant information data like site plan, Bore log and water table, test results, calculations, discussions, suggestions and recommendations in respect of suitable foundation etc. including determination of silt factor calculation of waterways and complete design of foundation including analysis of Bearing Capacities and settlements in bound and presentable form complete as per direction of Engineer-in-Charge. b) Detailed Investigation
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
2911ii.pdf
Additional Documents • 0.88 MB
BOQ_2428979.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid