Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
25 Oct 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE CD PWD Haldwani
EE CD PWD Haldwani
Beautification of Panchakki Chauraha near Damuwadhunga Haldwani Under Horble CM Announce No 07 2018
2021_pwd_37589_1
3213/2AC, Dt. 14-10-2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
EE CD PWD Haldwani
₹1 L
26 Oct 2021
19 Oct 2021
26 Oct 2021
19 Oct 2021
25 Oct 2021
19 Oct 2021
19 Oct 2021 - 25 Oct 2021
120 days
Amount
"Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. Note:- The top 300mm of existing soil needs to be preserved as per Green Building norms." a) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Excavating , supplying and filling of local earth ( including royalty ) by mechanical transport upto lead a lead of 5 Km also including ramming and watering of earth in layers not exceeding 20cm in trenches , plinth side of foundation etc complete
Extra for every additional lift of 1.5m or part thereof in excavation / banking excavated and stacked material All kind of soil
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil.
CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
RCC WORKS Centering and shuttering including strutting, propping etc. and removal of form for : Note:- Use of steel / Ply shuttering are permitted for all non exposed concrete works., However, for exposed concrete works the contractor shall consider use of only ply shuttering which shall be used for a maximum of 3 repetitions as per the approval of Engineer-in-charge. Foundation, footing, bases of columns etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Note:- Use of steel / Ply shuttering are permitted for all non exposed concrete works., However, for exposed concrete works the contractor shall consider use of only ply shuttering which shall be used for a maximum of 3 repetitions as per the approval of Engineer-in-charge. Walls (any thickness ) including attached pilaster ,butteresses, Plinth and string courses etc
Centering and shuttering including strutting, propping etc. and removal of form for : Note:- Use of steel / Ply shuttering are permitted for all non exposed concrete works., However, for exposed concrete works the contractor shall consider use of only ply shuttering which shall be used for a maximum of 3 repetitions as per the approval of Engineer-in-charge. Lintel , Beam , Plinth Beam
Centering and shuttering including strutting, propping etc. and removal of form for : Note:- Use of steel / Ply shuttering are permitted for all non exposed concrete works., However, for exposed concrete works the contractor shall consider use of only ply shuttering which shall be used for a maximum of 3 repetitions as per the approval of Engineer-in-charge. Columns ,piillars, pier, Abutment, post and Strut
Steel Reinforcement for RCC work including straightening , cutting , bending , placeing in position and binding all complete upto plinth level Thermo - Mechanical Treated bars for grade Fe500 or more
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. NOTE :- (1) Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. (2) Fly ash conforming to grade I of IS 3812 (Part-1) only be used as part replacement of OPC as per IS : 456. Uniform blending with cement to be ensured in accordance with clauses 5.2 and 5.2.1 of IS:456 -2000 in the items of BMC and RMC. All works upto Plinth level
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. NOTE :- (1) Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. (2) Fly ash conforming to grade I of IS 3812 (Part-1) only be used as part replacement of OPC as per IS : 456. Uniform blending with cement to be ensured in accordance with clauses 5.2 and 5.2.1 of IS:456 -2000 in the items of BMC and RMC. All works above Plinth level
Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand ) With F.P.S.(non modular) bricks
SCULPTURE Designing, Providing,Fixing of Sculpture of as per attached approved Design, with "GLOBE" of Fiberglass casting with minimum 6 mm thickness. Use of Gel coat with colour pigment mixed resin for the top layer (of finished model). All artwork is required to be done using realistic technique of painting. MS frame work with suitable Tubular section for strenthning and structural stablity. As per the design the Bronze "Hand" Casted and Placed on plinth of Bronze, with structural MS tubalor Section, plates, bolts and everything required for the stability of the structure as per approval of Architect and EIC.
stage.html
html • 0.02 MB
finance_44294.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .