Rural Drinking Water and Sanitation Department
Arranging Power Supply to A/P/S to 10HP W/S B/W in the name of PDO GP Islampur spot at Illahal near nala Lingdalli Village in O&M Rajeshwar section of Basavkalyan Sub Division, Basavakalyan Taluka of Bidar District
RWSSD/2025-26/EL/WORK_INDENT9195
RWSSD/2025-26/EL/WORK_INDENT9195
Open
Electrical
Two Tender Document System(Two Cover)
RWSSD Division Office Bidar
₹500
₹21,000
7 May 2025
7 May 2025
17 May 2025
15 May 2025
Arranging Power Supply to A/P/S to 10HP W/S B/W in the name of PDO GP Islampur spot at Illahal near nala Lingdalli Village in O&M Rajeshwar section of Basavkalyan Sub Division, Basavakalyan Taluka of Bidar District
Material cost -200006-PSC Pole-9.0M Long,200 kg WL
Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth
Labour cost -Hard Soil
Labour cost -Head loading of the pole 25 to 105Mtrs
Labour cost -Loading & unloading of 9 mtr RCC/PSC poles
Material cost -200105-RCC Pole-9.0M Long,145 kg WL
Labour cost -Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth
Labour cost -Hard Soil
Labour cost -Head loading of the pole 25 to 105Mtrs
Labour cost -Loading & unloading of 9 mtr RCC/PSC poles
Material cost -27901206-11 kV Horizontal cross arm wit
Labour cost -Fixing of V-Shape/Horizontal
cross arm including single top support Braces and Insulators
Material cost -279100-11 KV D.P.Structure
Labour cost -Hard Soil
Labour cost -Same as above using RCC
Material cost -2811101-Guy with Complete set
Labour cost -a) Fixing of GUY Sets with
break insulators making use
Labour cost -b)Hard Soil
Material cost -281683-Spiral Earth Electrode
Labour cost -providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)
Material cost -283008-11kV,5KN Composite/Polymeric
Material cost -283320-silicon rubber composite insulator
Material cost -284108-Rabbit ACSR Conductor
Labour cost -Labour cost -For Rabbit ACSR
Material cost -285508-Rabbit to Rabbit (P G Clamps)
Material cost -200105-RCC Pole-9.0M Long,145 kg WL
Labour cost -Erection of RCC/PSC poles 9
to 10 mtr long but in a pit of
Labour cost -Hard Soil
Labour cost -Head loading of the pole 25 to 105Mtrs
Labour cost -Loading & unloading of 9 mtr
Material cost -279111-25/63kVA T.C.Sets(for star ra
Labour cost- for 25/63 kVA on the existing 9 mtrs. RCC pole (square section) (excluding erection of pole)
Material cost -279800-fish plate MS
Material cost -281008-8 SWG G.I.Wire
Material cost -281110-7/10 SWG Guy Wire
Material cost -2811101-Guy with Complete set
Labour cost -a) Fixing of GUY Sets with break insulators making use
Labour cost -Hard Soil
Material cost -2811103-Earthing Materials Type for gr
Labour cost -Hard Soil
Material cost -281674-GI Grounding Pipe B Class 4
Labour cost -2811103-Earthing Materials Type for gr
Material cost -284503-LT Spacer for TC Wiring
Material cost -284828-Pre Insulated lugs -CPTAU for 5
Material cost -288634-50Sq mm (AI end terminal Lug
Material cost -289029-PVC Wire-50 Sq.mm
Material cost -301107-L.T.Protection kit
Labour cost -Fixing of LT Protection Kit
Material cost -302122-11kV Class, Solid core
Labour cost -HG Fuse 11kv solid core type (3 no's)
Material cost -303200-L.A. 9kV, 5kA, Metal Oxide
Labour cost -Fixing of 3 Nos lightning
arrestors including wiring.
Material cost -304212-11kV G.O.S 200A Single break
Labour cost -Fixing of GOS including wiring
Material cost -321465-25 Kva,Aluminium wdg,star 2(5
Labour cost -a) Erection of 25-63 kVA Transformer of 25kVA
Labour cost -Loading of Transformer 25kVA
Labour cost -Unloading of Transformer 25kVA
Material cost -357511-L.T. Electronic Tri-Vector Met
Labour cost -LT Electroic Tri-Vector Meter
Material cost -358061-With CT ratio 100/5 for 50/63
Labour cost -LT Metering Box For Housing ETV Meter with CT
Material cost -200103-RCC Pole-8.0M Long,140 kg WL
Labour cost -Hard Soil
Labour cost -Head loading of the pole 25 to 105Mtrs
Labour cost -Loading & unloading of 8 mtr RCC/PSC poles
Labour cost -Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth.
Material cost -27901203- 4 Pin Cross Arm with Pole Clam
Labour cost -Fixing of 4 Pin Cross
Material cost -2811101-Guy with complete set
Labour cost -a)Fixing of GUY Sets
Labour cost -Hard Soil
Material cost -281683-Spiral Earth Electrode
Labour cost -Providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)
Material cost -283158-No.8 Strain Insulator
Material cost -284105-Weasel ACSR Conductor
Labour cost -Stringing of Conductor
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .