| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹12.9 L+₹86,452.69 (7.16%)Rejected-Finance | L2 | Rejected-Finance HIGHER | |
| 3 | L3₹13.4 L+₹1.4 L (11.3%)Rejected-Finance | L3 | Rejected-Finance HIGHER | |
| 4 | L4₹14.1 L+₹2.1 L (17.0%)Rejected-Finance | L4 | Rejected-Finance HIGHER | |
| 5 | L5₹14.3 L+₹2.3 L (18.7%)Rejected-Finance | L5 | Rejected-Finance HIGHER |
Tender Value
₹17.0 L
EMD Value
₹34,000
Closing Date
4 Mar 2024, 5:00 pmClosed
NAVEEN KHATRI
PD YamunaNagar
Widening and strengthening of Chhachhrauli Kot road to Salempur Khadar (ID-705) km 0.00 to 0.36 in Yamuna Nagar District.
2024_HRY_359785_1
20241AB36D9C F398 4680 9D5C 0CBDEFD93F44618BAR
Open Tender
Civil Works
Works
90 days
SALEMPUR KHADAR
2 documents required · 2 mandatory
₹1,000
₹34,000
Yes
21 Mar 2024
26 Feb 2024
5 Mar 2024
26 Feb 2024
4 Mar 2024
26 Feb 2024
Amount
[17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material
[17.22.2]Water Bound Macadam Gr I 2. Water Bound Macadam Grading I with screening Type A Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications
[17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam - II with Screening Type A / Type B Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications
[17.43.2]Laying of recycled Bituminous Pavement with Central Recycling Plant upto 75mm 2. Milling on Bituminous surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site.
[17.66.1]Rectangular Concrete Block Pavement 1. Providing and laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m of cement concrete (C.C) M30 grade and spreading 25 mm thick sand underneath filling joints with sand on existing W.B.M. base as per technical specification clause 1503
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect.
[17.7]Construction of Embankment with Material Deposited from Roadway Cutting or Excavation Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.as per technical clause 305 of MORT&H specifications (Use Excavated Earth)
[17.75]Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Scarified material @ Rs. 1330.00 Per Cum
Good bricks @ Rs.4.00 Each
Brick bats @ Rs.357.00 per cum
Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and the given in HSR, the unit of nomenclature given in HSR shall be applicable. In case of any difference in the unit of any non schedule item depicted in this DNIT and the conventional unit of that N.S. item as per practice in this department, the conventional unit as per practice shall be applicable
M/s Subhana Contractor
THE NARENDER COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED
Randeep Construction
HIMANSHU RANJAN
Raghbir singh Construction company
M/s Competent Construction
GOYAL CONSTRUCTION COMPANY
SK Infrastructure
The Sunrise Co op LandC Society ltd.
THE MAA BHUMIKA COOP L AND C SOCIETY LTD.
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .