Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 19 LAKE TEMPLE ROAD KOLKATA 700 029 | KOLKATA | KOLKATA | WEST BENGAL | 700029 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.6 L
EMD Value
₹5,120
Closing Date
4 Mar 2024, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR, NISER
DIRECTORATE, NISER
De-scaling of KIRLOSKAR make chiller 1800 TR (450TRX4) (Model No-KSC087) at NISER Campus, Jatni.
2024_NISER_796327_1
NISER/MECH/CHILLER/23-24/15_1
Open Tender
Machineries/ Mechanical Engg Items
Works
30 days
NISER, JATNI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,120
5 Mar 2024
19 Feb 2024
5 Mar 2024
19 Feb 2024
4 Mar 2024
19 Feb 2024
Descaling of condenser in kirloskar make chiller 450 TR • Process of descaling should be done by maintaining PH (potential of hydrogen) level in between 3-4 in gradually changing, as per site condition or as per engineer in charge instruction. • Condenser approach should be maintain in between 0-1.5 • 24 hour circulation of chemical water with two times changing the chemical water, in 3 hour interval. • Brushing should be done as per requirement for getting clean water without scaling • All other requirement for getting approach a mentioned above should be done by agency
Descaling of Evaporator in kirloskar make chiller 450 TR • Process of descaling should be done by maintaining PH (potential of hydrogen) level in between 3-4 in gradually changing, as per site condition or as per engineer in charge instruction. • Evaporator approach should be maintain in between 0-1 • 24 hour circulation of chemical water with two times changing the chemical water, in 3 hour interval. • Brushing should be done as per requirement for getting clean water, without any scaling. • All other requirement for getting approach a mentioned above should be done by agency
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .