| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹2.5 CrAccepted-Finance | ₹2.5 Cr | H1 | Accepted-Finance As per NIT conditions. |
| 2 | H2₹2.7 CrAccepted-Finance | ₹2.7 Cr | H2 | Accepted-Finance As per NIT conditions. |
| 3 | H3₹2.4 CrAccepted-Finance | ₹2.4 Cr | H3 | Accepted-Finance As per NIT conditions. |
| 4 | H4₹2.9 CrAccepted-Finance | ₹2.9 Cr | H4 | Accepted-Finance As per NIT conditions. |
| 5 | H5₹2.6 CrAccepted-Finance | ₹2.6 Cr | H5 | Accepted-Finance As per NIT conditions. |
| Sl No | Description | Qty | Unit | Dhrupad Consultants Pvt.Ltd L2 | CRAPHTS Consultants (I) Pvt. Ltd. L1 | Park Projects Consultancy Private Limited L5 | SPARSH ENGINEERING COMPANY PRIVATE LIMITED L3 | URS SCOTT WILSON INDIA PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Lump sum fees for providing consultancy for Geometric design, traffic management, environment impact study and formulation of proposal for Consultancy services for Feasibility study for construction of flyover from Kanjhawala Chowk to Mangolpuri Outer Ring Road, Delhi. including submission to UTTIPEC, DDA, MCD, DUAC, Railways etc., providing necessary support / input till final approval of scheme from UTTIPEC, DDA, MCD, DUAC, Railway, IGL etc. complete all as per scope of work for | ||||||||
| 1.101. (a). Pre-feasibility :-:- i. Reconnaissance survey as per IRC SP 19-2001 and Traffic survey. ii. Preliminary Topographical survey. iii. Broad Structural features including lane configuration. iv. Lane configuration and intersections/ Junction / service roads. v. Utility shifting requirement along with tentative estimates. vi. Forest /Environmental /CRZ clearance requirement. vii. Tentative/ Normative cost estimate with reasonable accuracy. viii. Land acquisition tentative cost assessment. ix. Submission of PPR for acceptance of E-in-Charge as per Chapter 3, Annexure 14A of SOP to CPWD works manual and other provisions of PWD CPWD works Manual and Directions of UTTIPEC and Delhi government as modified from time to time (to be suitably modified for infrastructure work) x. Feasibility of 3 proposals based on these surveys. | ||||||||
| 1.20(b) Detail Feasibility:- i. Submission of inception report for scrutiny and approval of PWD, Govt. of Delhi. ii. Alignment option in consideration of tree detailed and other features. Detailed traffic survey as per IRC codes Detailed Topographical study iii. Approval of conceptual plans various options of proposal from UTTIPEC Core Group. iv. Approval of various options/plan by UTTIPEC working groups along with cost benefit analysis of scheme. v. Approval of final plan by UTTIPEC Governing body. vi. Preparation of 3D Walkthrough as per guideline of DUAC. vii. Approval of plans and architectural 3D views by DUAC, NOC from ASI and Fire Service Department and other relevant approval from concern bodies. viii. Submission of final Drawings (Detailed drawings based on Street Design Guidelines of UTTIPEC and complete in all respect as per TOR) and DPR of the project to the Department. ix. Payment to GSDL or any other Government approved GIS provider of underground utilities as per actual demand. x. Submission of detailed estimate from concerned department regarding shifting of utilities i.e. DJB, BSES, DTL, Tata Power, IGL, MTNL, Telecom Services or any other concerned department. xi. Submission of Details of trees in dwg. Format, Kml file or any other format required as per forest department along with processing the case and requisite approval from forest department. (The cost of tree cutting/ transplantation and corresponding requisite land will be paid directly to beneficiary/ forest department) xii. Submission of Land acquisition details from Govt., Private, Agriculture, Commercial, forest and any other, along with processing the case and requisite land acquisition from concern. (The cost of land acquisition will be paid directly to beneficiary) xiii. Submission, processing and obtaining mandatory approval / NOC from concern bodies. xiv. The Consultant shall carryout Geo-technical investigation and the bore holes will be taken at a distance of 1 km for the elevated section and 2 bore holes will be done at the location of proposed underpass. The depth of the bore holes will be minimum 35 m. xv. Preparation of storm water drain plan co-align existing network of storm water and other services. xvi. Preparation of conceptual structural drawings with technical specification for NIT. xvii. Preparation of detailed methodology of construction with technology required. xviii. Details of projects for pre-construction activities as per for acceptance of E-in-Charge as per Chapter 3 and Annexure-C of SOP to CPWD works manual, other provisions of CPWD works Manual and Directions of UTTIPEC and Delhi government as modified from time to time (to be suitably modified for infrastructure work) & any other details relevant to project. xix. Finalization of EPC tender document for the department and as per direction of the Engineer-in-Charge. | ||||||||
| 1.30 | Total Cost of item no. 1 ((a) +(b)) | 1 | Job | 2,45,00,000 ₹2,45,00,000 | 2,44,00,000 ₹2,44,00,000 Lowest | 2,92,00,000 ₹2,92,00,000 | 2,63,53,000 ₹2,63,53,000 | 2,70,00,000 ₹2,70,00,000 |
Tender Value
₹3.4 Cr
EMD Value
₹6.9 L
Closing Date
15 May 2026, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer, Flyover Project Division F-14, PWD, GNCTD, Mukarba Chowk, Delhi-110033
Consultancy services for feasibility study for construction of flyover from Kanjhawala Chowk to Mangolpuri Outer Ring Road, Delhi. (Recall of Tender ID 2025_PWD_280235_1)
2026_PWD_289964_1
13/SE/F5/PWD/GNCTD/2025-26 (Recall)
Open Tender
Consultancy
Item Rate
150 days
Kanjhawala to Mangolpuri
As per NIT
19 documents required · 19 mandatory
₹0
₹6.9 L
Yes
O/o SE, Flyover Circle, F-5, PWD, Opposite Gate no
16 Jun 2026
17 Apr 2026
15 May 2026
17 Apr 2026
15 May 2026
24 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Lump sum fees for providing consultancy for Geometric design, traffic management, environment impact study and formulation of proposal for Consultancy services for Feasibility study for construction of flyover from Kanjhawala Chowk to Mangolpuri Outer Ring Road, Delhi. including submission to UTTIPEC, DDA, MCD, DUAC, Railways etc., providing necessary support / input till final approval of scheme from UTTIPEC, DDA, MCD, DUAC, Railway, IGL etc. complete all as per scope of work for | |||||
| 1.1 | 1. (a). Pre-feasibility :-:-
i. Reconnaissance survey as per IRC SP 19-2001 and Traffic survey.
ii. Preliminary Topographical survey.
iii. Broad Structural features including lane configuration.
iv. Lane configuration and intersections/ Junction / service roads.
v. Utility shifting requirement along with tentative estimates.
vi. Forest /Environmental /CRZ clearance requirement.
vii. Tentative/ Normative cost estimate with reasonable accuracy.
viii. Land acquisition tentative cost assessment.
ix. Submission of PPR for acceptance of E-in-Charge as per Chapter 3, Annexure 14A of SOP to CPWD works manual and other provisions of PWD CPWD works Manual and Directions of UTTIPEC and Delhi government as modified from time to time (to be suitably modified for infrastructure work)
x. Feasibility of 3 proposals based on these surveys. | - | - | - | - |
| 1.2 | (b) Detail Feasibility:-
i. Submission of inception report for scrutiny and approval of PWD, Govt. of Delhi.
ii. Alignment option in consideration of tree detailed and other features. Detailed traffic survey as per IRC codes Detailed Topographical study
iii. Approval of conceptual plans various options of proposal from UTTIPEC Core Group.
iv. Approval of various options/plan by UTTIPEC working groups along with cost benefit analysis of scheme.
v. Approval of final plan by UTTIPEC Governing body.
vi. Preparation of 3D Walkthrough as per guideline of DUAC.
vii. Approval of plans and architectural 3D views by DUAC, NOC from ASI and Fire Service Department and other relevant approval from concern bodies.
viii. Submission of final Drawings (Detailed drawings based on Street Design Guidelines of UTTIPEC and complete in all respect as per TOR) and DPR of the project to the Department.
ix. Payment to GSDL or any other Government approved GIS provider of underground utilities as per actual demand.
x. Submission of detailed estimate from concerned department regarding shifting of utilities i.e. DJB, BSES, DTL, Tata Power, IGL, MTNL, Telecom Services or any other concerned department.
xi. Submission of Details of trees in dwg. Format, Kml file or any other format required as per forest department along with processing the case and requisite approval from forest department. (The cost of tree cutting/ transplantation and corresponding requisite land will be paid directly to beneficiary/ forest department)
xii. Submission of Land acquisition details from Govt., Private, Agriculture, Commercial, forest and any other, along with processing the case and requisite land acquisition from concern. (The cost of land acquisition will be paid directly to beneficiary)
xiii. Submission, processing and obtaining mandatory approval / NOC from concern bodies.
xiv. The Consultant shall carryout Geo-technical investigation and the bore holes will be taken at a distance of 1 km for the elevated section and 2 bore holes will be done at the location of proposed underpass. The depth of the bore holes will be minimum 35 m.
xv. Preparation of storm water drain plan co-align existing network of storm water and other services.
xvi. Preparation of conceptual structural drawings with technical specification for NIT.
xvii. Preparation of detailed methodology of construction with technology required.
xviii. Details of projects for pre-construction activities as per for acceptance of E-in-Charge as per Chapter 3 and Annexure-C of SOP to CPWD works manual, other provisions of CPWD works Manual and Directions of UTTIPEC and Delhi government as modified from time to time (to be suitably modified for infrastructure work) & any other details relevant to project.
xix. Finalization of EPC tender document for the department and as per direction of the Engineer-in-Charge. | - | - | - | - |
| 1.3 | Total Cost of item no. 1 ((a) +(b)) | - | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.81 MB
BOQ_384981.xls
BOQ • 0.39 MB
corritendum2date15052026.pdf
PDF • 0.86 MB
corrigendumI29042026date.pdf
PDF • 2.41 MB
corrigendumI29042026.pdf
PDF • 2.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].