Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC Shaji KK Executed the agreement | |
| 2 | L2₹1.4 L+₹2,837.07 (2.04%)Rejected-AOC | L2 | Rejected-AOC Shaji KK Executed the agreement |
| Sl No | Description | Qty | Unit | SHAJI.K.K L1 | K K VINCENT L2 |
|---|---|---|---|---|---|
| 1.00Plumbing & Cleaning | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.4 | cum | 2,923.34 ₹7,016.02 Lowest | 2,983.62 ₹7,160.69 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.8 | sqm | 328.6 ₹1,905.88 Lowest | 335.31 ₹1,944.8 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 10.7 | sqm | 702.85 ₹7,520.5 Lowest | 717.2 ₹7,674.04 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.7 | cum | 10,734.93 ₹18,249.38 Lowest | 10,954.02 ₹18,621.83 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 2.7 | cum | 8,903.42 ₹24,039.23 Lowest | 9,085.13 ₹24,529.85 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 294 | kilogram | 96.33 ₹28,321.02 Lowest | 98.3 ₹28,900.2 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.1 | cum | 6,678.58 ₹7,346.44 Lowest | 6,814.88 ₹7,496.37 |
| 1.01 | 50.18.9.8.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 75 mm dia 6 Kgf/ cm2 | 10 | metre | 353.16 ₹3,531.6 Lowest | 360.37 ₹3,603.7 |
| 1.01 | 50.18.9.9.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2 | 10 | metre | 515.65 ₹5,156.5 Lowest | 526.18 ₹5,261.8 |
Tender Value
₹1.4 L
EMD Value
₹3,542
Closing Date
24 Sept 2024, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Harbour Engineering subdivision Chettuva Thrissur
Repairs to Plumbing of Various Buildings and Cleaning of Harbour and Office Premises including Water Tanks Drains ETP etc at Chettuva Fishing Harbour
2024_HED_690217_1
HED/CEHED/TR/70/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
60 days
Chettuva harbour
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹3,542
Yes
27 Oct 2025
10 Sept 2024
26 Sept 2024
10 Sept 2024
24 Sept 2024
10 Sept 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1074451.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .