Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹24,000
Closing Date
14 Aug 2020, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Urgent fabrication joining and fitting of dismantling joint and by pass arrangement system on delivery side of lift irrigation scheme Unisoo New of MISD Handwara.
2020_IFC_101942_5
eNIT 34 of 2020-21
Open Tender
Repair and Maintenance Works
Item Rate
3 days
Baramulla
Please refer Tender documents.
4 documents required · 4 mandatory
₹100
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
Mech. Irrig. Div. Baramulla
24 Aug 2020
8 Aug 2020
17 Aug 2020
8 Aug 2020
14 Aug 2020
8 Aug 2020
11 Aug 2020
Amount
Dismantling of damaged sluice valve (dia =8’’) on the delivery side of rising main and placing it on safer side of the pump house. The job includes fabrication of new dismantling joint at sluice valve place by way of: a). fabrication of flanged dismantling joint 8’’ dia having pipe length of 1’ (t=6 mm) and two flanges having inner diameter 8’’ (t =13mm), welded at both ends of this pipe length. B). fabrication of by-pass arrangement system out of GI pipes having following speciation’s as : I). total overall length of GI Pipe = 6’ ii). Dia of GI pipe= 1.5’’ iii). Elbow (dia 1.5’’) = 02 No. Iv). Gate valve Heavy duty make =01 N0. Job includes making of 02 No. suitable size holes on the delivery line by using oxy acetylene gas cutter at site after proper washing out the rising main by using portable dewatering pump at site. c). Reassembling, joining & fitting back already fabricated flanged dismantling joint in place of already existing sluice valve involving use of two number (dia=8’’) rubber gaskets , 16 No. bolts of assorted size. The job also includes fitting of the fabricated by pass arrangement at delivery side of this pumping unit. The job involves use of DG set and highly skilled labourers for the fabrication of dismantling joint and by pass arrangement system as per requisite measurement at the respective site. The job also includes testing of this arrangement system on full load showing satisfactory result at said LIS.
M/s BUHROO MECHANICAL WORKS
SULTAN ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .