Loading…
Loading…
Tender Value
₹47.2 L
EMD Value
₹47,200
Closing Date
25 Jun 2026, 4:00 pm
D C Patel
Bi- Annual Rate Contract for restoration of various 66kV Class Transmission lines, damaged due to natural calamity / any other abnormality under various transmission divisions of Bharuch Circle.
311566
TCBRH/26-27/E-113
Open
Electrical - All
Bharuch
15 documents required · 14 mandatory · 1 optional
₹1,180
GETCO
₹47,200
5 Jun 2026
5 Jun 2026
5 Jun 2026
25 Jun 2026
5 Jun 2026
“Tender for Bi- Annual Rate Contract for restoration of various 66kV Class
Transmission lines, damaged due to natural calamity / any other abnormality
under various transmission divisions of Bharuch Circle.
GENERAL TERMS & CONDITIONS
WITH TECHNICAL BID
(TO BE SUBMITTED ONLINE – N-Code Only)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
TENDER NOTICE No: TCBRH/26-27/ E-113
SE (TR) Bharuch invites “On line Tenders” (e-tendering) for the works of following items. Tender Papers &
Specifications may be down loaded from Web site https://tender.nprocure.com (For view, down load and on
line submission) and GUVNL/GETCO web site www.gseb.com & www. getcogujarat.com (For View & down load
only). Tender fee including GST may be paid along with submission of tender with EMD in online form only for
respective tender. “All the relevant documents of tender to be upload (Notarized/self-attested copies of
original-as specified in tender document) through online only (mandatory) on (n) procure portal including
tender fee & EMD. Tender fee & EMD are to be submitted in online form only . “NO COURIER SERVICE OR
HAND DELIVERY” will be allowed.
All the bidders, in respect of tender item must have vendor registration with the GETCO viz. prior to the date
of opening of technical bid of the tender otherwise their bids will not be considered eligible for technical
scrutiny and as such, their technical bids will not be opened.
1 Tender No. TCBRH/26-27/E-113
Bi- Annual Rate Contract for restoration of various
Works of 66kV Class Transmission lines, damaged due to
2 natural calamity / any other abnormality under
various transmission divisions of Bharuch Circle.
3 Estimated cost with GST in
4 Tender Fee (non-refundable)including GST Rs. 1180 {1000 + 180 (18% GST) }
5 Earnest Money Deposit amount in Rs.
On line (E-tendering) tender/ offer
6 submission last date up to 16.00 hours only As per Schedule
(This is mandatory)
Date of opening of Tender fee, EMD cover,
7 Vendor registration and technical bid on – As per Schedule [Tentative]
line opening at 16.00 Hours.
Tentative Date of on – line opening of Price Shall be intimated separately
bid, (if possible), at 11.00 Hours
11 Time Limit 24 Month
12 Validity of Bid 180 days
1. All tender documents, scanned copies of original (Notarized / self-attested copies of original – as
specified in tender document) documents with bid and no physical document including EMD and
Tender Fee to be submitted by the bidder .
2. Bidder has to submit tender fee , EMD in form of RTGS/NEFT/ONLINE only as per date shown in table.
3. In case of Short submission of document with bid and or clarification required if any required from the
4. It is mandatory for all the bidders to submit their tender documents by on – line (E-tendering) in
schedule time. If tender documents submitted physically in that case the same tender will not be
5. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain
legible (readable) and should not be password protected.
6. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s
letterhead), Tender acceptance letter (on bidder’s letterhead), price bid, tender documents specified
in the tender must be submitted through online on n-procure portal (mandatory) (All the documents
to be duly self-attested by the bidder). For any differences or wrong entry bidder shall be sole
responsible for that documents.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7. Tender will be evaluated on Data / Details / Documents of the online offer only.
8. The bidders are required to upload complete technical bid duly filled, sealed & signed by bidder (all
the appendices (annexure)/forms etc). This is intended for transparency and speedy evaluation of the
bids. Instead of simply confirming/attached in bid/refer physical offer, the bidder shall fill in the
particulars against appropriate place in respect of each line appearing in Technical bid (In the
absence of required details in uploaded tender documents, technical bid, the purchaser has every
right to evaluate the bids accordingly and bidder cannot raise any objection against any point during
9. In the absence of required details in the online annexure, the purchaser has every right to evaluate
the bids accordingly and bidder cannot raise any objection against any point during evaluation
10. Payment of Tender fees & Earnest Money Deposit EMD. Amount should be paid by Online-payment.
Payment of Tender Fees & EMD by RTGS/NEFT/on line only. In case of payment through RTGS/NEFT
bidder has to mail following details:
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details on the same date of payment so that receipt can
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
3 Name of Bank BANK OF BARODA
4 Branch Code DBBHRU
Shalimar Complex, Station Road,Bharuch-
5 Address of Bank
6 IFSC Code BARB0DBBHRU
7 PAN No AABCG4029R
8 TAN No BRDG01026E
9 GST No 24AABCG4029R2ZC
11. Bidders are requested to remain in touch with the website for any amendment/ corrigendum or
extension of due date etc.
12. Tender without EMD and tender fee plus GST as applicable shall be rejected.
13. No tender shall be accepted/opened in case of receipt after due date and time of tender, irrespective
of delay due to postal services or any other reasons and the Corporation shall not assume any
responsibility for late receipt of tender.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
14. The GETCO reserves the right to award the work to one or more bidders, considering their technical
and financial capacity OR to reject any or all tenders or accept any tender without assigning any
reason thereof.
15. As per new guideline –It is mandatory to use CBud app.
(1) To do any type of digging only after prior intimation through “Call Before U Dig” App & as per
its term & condition.
(2) To use the App before commencing any type of digging anywhere in the state
Any technical questions, information and clarifications that may be required pertaining to
this enquiry should be referred to The Superintending Engineer (TR), Gujarat Energy
Transmission Corporation Limited, Circle office, Bharuch. GETCO reserves the right to reject
any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
GETCO, C.O., Bharuch
Download Tender Documents in (PDF Format) which consists of:
Part – I: Commercial Terms & Conditions
Part – II: Technical Specifications & GTP’S, Schedule “A” indicating the quantities & items, drawing if
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe”
Note: In case bidder needs any difficulty in accessing / submission of on line bid / clarification or
if training required for participating in online tender, they can contact the following office:(n)
Procure Cell, (n) code solutions-A division of GNFC Ltd., 403, GNFC Infotower, S.G. Road, Bodakdev
Ahmedabad – 380054 ( Gujarat ) Toll Free: 1-800-233-1010 ( Ext. 501, 512,516 , 517 , 525 ) , Phone
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Tender No. TCBRH/26-27/E-113
Sub: Bi- Annual Rate Contract for restoration of various 66kV Class Transmission lines, damaged
due to natural calamity / any other abnormality under various transmission divisions of
Bharuch Circle.
In connection with above subject, I/we confirm the following:
1) I/we, the undersigned, have read and examined the above tender documents in detail.
2) I / we declare that our bid is strictly in line with Tender Specification and there is
no deviation. Further, I / we also agree that additional conditions / deviations, if
any, found in bid, the offer shall be out rightly rejected without assigning any
reason thereof.
Signature of Authorized Representative of
Company / Agency
Name of tendering Company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
DETAILS OF THE FIRM
NAME OF THE FIRM:
1 Address of Registered Office
2 Contact Personal
4 Residential Address
5 Phone Nos. (Office and
7 Telegraphic code
1 Address of works
2 Contact Personal
4 Residential Address
5 Phone Nos. (Office and
7 Telegraphic code
8 Email Address
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
DETAILS OF THE EXPERIENCE FOR ERECTION WORK IN LAST THREE YEARS FROM THE DUE
DATE OF TENDER:
Sr No Name of Order Order Length Date of Order Status if order
Transmis reference value of line completion fully under
sion line no. & executed execution
A Gujarat Energy Transmission Corporation Ltd., GETCO:
B OTHER STATE ELECTRICITY BOARD:
C PRIVATE FIRMS:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
List of work completion certificate submitted with technical bid
Sr Name of Work Name of Authority by Reference no. & Date
completion certificate
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Qualification Requirement
To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of
his capability and adequacy of resources:
Sr.No. Qualifying Requirements
1. Registration : The bidder shall be strictly a GETCO register contractor of any class
2. Technical Criteria:
1) Length of transmission line on towers/H frame to be tenderize – The bidder
should have erected transmission lines including foundation, tower erection
and stringing of conductor and earthwire of 66kV and/or above class lines on
towers/H frame as a Main contractor or as a Sub Contractor in single or
multiple orders for length -
(a) Line length less than 5 km –
Minimum 3 km line in last 3 financial years
(b) Line length 5km to 15 km –
(i) 5kM to 10kM - Minimum quantity shall be equal to the tender quantity of the
line in last 3 financial years
(ii) From 10 to 15kM - Minimum 10 km line in last 3 financial years.
(c) Line length above 15 km –
(i) 15kM to 20kM - Minimum quantity shall be equal to the tender quantity of
the line in last 3 financial years.
(ii) 20kM and above - Minimum 20 km line in last 3 financial years.
i) As a main contractor - workorder copy and experience certificate of similar
nature work to be submitted to ascertain experience of line erection work of
66kV and/or above class in GETCO or other STU or CTU as mentioned in Cl.-2.1
& Cl.-2.2, failing in which bidder shall be evaluated accordingly by order
placing authority as per DOP.
ii) As a sub-contractor – workorder/PO copy of original contract and sub-
contract, experience certificate from main contractor and statement of
financial transactions for the same workorder/PO are to be submitted to
ascertain experience of line erection work of 66kV and/or above class in
GETCO or other STU or CTU as mentioned in Cl.-2.1 only, failing in which
bidder shall be evaluated accordingly by order placing authority as per DOP.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3. Financial Criteria:
1) The bidder shall submit the Bank solvency of the amount which is 20% of the
total estimated cost of tender.
4. Financial Criteria
1. Bidder's Minimum Average Annual Turnover (MAAT)^ for best three years out
of last five financial years as annualized shall not be less than the estimated
amount of this tender.
^Note- “Annual gross revenue from operations / gross operating income as
incorporated in the profit & loss account excluding other operative income/other
2. Last quarter’s Liquid Assets should not be less than 20 % of estimated
amount as on date of invitation of tender.
Note: For the purpose of arriving at LA Current Assets Less Inventories shall be
3. Bidder’s Net Worth for Last 3 financial years should be positive.
1. Audited, Verified and Certified Practicing Chartered Accountant certificate will
be considered forMinimum Average Annual Turnover, Liquid Assets and Net worth.
The provisional certificates will not be entertained.
2. Under taking in respect of reference to NCLT under Insolvency & Bankruptcy
Code. The undertaking
is to be furnished by the bidder in its bid as per the format attached and shall be
deemed to be part of
the bidding schedule and submitted along with QR Bid
Subject :- Work Name including tender No.
In connection with above subject, I / We confirm that our firm is not declared in
NCLT under Insolvency &
Bankruptcy Code. Further, I / We also agree that, if any found NCLT under
Insolvency & Bankruptcy Code,
the offer shall be out rightly rejected without assigning any reason thereof.
(Seal, Sign & Name of Authorized Signatory of Bidder)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Additional Documents:
1. Electrical Contractor License with latest validation
2. Payment of Tender fee and EMD [ RTGS/NEFT].
3. GST registration certificate. (Certificate of Provisional GST
registration shall not be accepted).
4. Nature of Firm: Details of Proprietorship / Partners/Directors of the
Firm/Company. Partnership deed, MOA, BR, if applicable.
5. Copy of power of attorney as the case may be.
6. PF registration
7. The Bidder should have to submit copy of PAN card.
8. Profit & Loss Account Statement: Financial turn over for last three years
shall be submitted along with bid duly approved by charted accountant & IT
returns along with profit Loss and Balance sheet of Last three financial
9. Labor License: Bidder has available labor licensee for his firm as per Govt.
rules. Registration of Workers Welfare Cess.
10. List of Tools & Tackles: Bidders mentioned available tools with requirement
Note: Above technical criteria is for technical scrutiny after opening the technical bid.
However, the GETCO reserves the right to award the work to one or more bidders,
considering their technical and financial capacity OR to reject any or all tenders or
accept any tender without assigning any reason thereof.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
CHECK LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars
1 Scan copy of online payment receipt of Tender fee & EMD
All Pages of Technical Bid with Bidder Signature and Rubber Stamp
(encouraged for digitally signed)
3 Registration document as Approved Contractor in Appropriate Class
Work completion certificate in Form No.3A (Experience Certificate as main
contractor) only as Per Qualification Requirement
5 Bank Solvency Certificate
6 Provident Fund Code Number Documents
7 GST Registration Number Documents
Income Tax Return, Profit Loss Accounts and Balance sheet of Last Three
Financial Years
9 Nature of Firm:
Partnership deed/Latest Form-G/ POA/Authorized Signatory Certificate for
Self-Affidavit/POA/Authorized Signatory Certificate for Proprietorship
10 PAN Number Document
11 Filling all Annexure
12 Electrical Contractor license
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
E-TENDER FOR THE WORK OF
Bi- Annual Rate Contract for restoration of various 66kV Class Transmission lines, damaged due
to natural calamity / any other abnormality under various transmission divisions of Bharuch
Instructions to Bidders
General Conditions of Contract
Erection Conditions of Contract
Special Conditions of Contract
Technical particulars
Forms & Appendices to be filled in by the bidders.
GENERAL TERMS & CONDITIONS WITH COMMERCIAL BID
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Bharuch hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids for Bi- Annual Rate Contract for restoration of various 66kV Class
Transmission lines, damaged due to natural calamity / any other abnormality under
various transmission divisions of Bharuch Circle.as detailed in the accompanying specifications in
accordance with Terms and Conditions herein. The bids shall be prepared and furnished as per these
2.0 Qualification Requirements of Bidders
2.1 To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of his
capability and adequacy of resources:
a) He is a qualified and registered contractor of GETCO who is regularly executing jobs of Work of
erection of 66/132/220KV D/C, M/C lines under any construction Division of GETCO
including all works in the scope of the tender specification and has adequate technical knowledge
and practical experience (the Bidder shall submit documents defining legal status, registration and
principal place of business; written power of attorney of the signatory of the bid to commit the
bidder, performance record as contractor for erection of equipments in the last three years and
details of works on hand in the past three years & contracts on hand.
b) He has adequate financial capability and stability to meet the financial obligations arising out of
the scope of works.
c) In addition, the Qualifying Requirements if any, in the ‘Special Conditions of Contracts ‘shall also
d) The registration with P.F. authority and labor license as per GETCO norms is mandatory
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition any other
relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in the
Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform the
Contract satisfactorily.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable for
these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Document
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein,
which may in any manner, affect the scope & content of work and the costs thereof. Submission of a
Bid not substantially responsive to the Bid Document in all respects and/or failure to furnish all
information required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or is
in doubt as to the true meaning of any part, he shall make a request, in writing not later than the date
of pre Bid discussion, to the owner in triplicate. The owner will issue explanations, interpretations and
clarifications as deemed fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and time stipulated in the
Bid invitation, all such explanations, interpretations and clarifications from the Owner shall be deemed
as part of Bid Documents and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at his
own initiative or in response to a clarification requested by the intending Bidder, modify the Bidding
Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received
the Bidding Document at the address contained in the letter of request for issue of bidding document
from the Bidders. Owner will bear no responsibility or liability arising out of non-receipt of the same in
time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into account in
preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of bids.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration by
the Bidders while they submit their bids and shall invariably enclose such documents as a part of the
C. PREPARATION OF BIDS
8.0 Language of Bids
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged
by the Bidder and the Owner, shall be written in the English language, provided that any printed
literature furnished by the Bidder may be written in another language so long as accompanied by an
English translation of its pertinent passages. Failure to comply with this may disqualify a bid. For
purposes of interpretation of the bid, the English translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding
any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which
may have any effect on the execution of the Contract covered under these documents and
specifications. The Owner shall not entertain any request for clarifications from the bidders, regarding
such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and considered
while submitting the proposals. No claim for financial adjustment to the Contract awarded under these
specifications and documents will be entertained by the owner. Neither any change in the time
schedule of the Contract nor any financial adjustments arising thereof shall be permitted by the
Owner, which are based on the lack of such clear information or its effect on the cost of the works to
10.0 Documents comprising the Bid:
furnished in the Bidding Documents, indicating, for the services to be rendered, a brief description of
services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the Qualification
Requirements as detailed in Clause 2.0 above and Special Conditions of Contract (including Clause 11 of
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and signed by
wherever the Company Authorized Signatory specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific ITB.
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering
all the equipment erection and other installation services specified under the accompanying Technical
Specifications. It will include among others as specified therein the following: -
a) Receipt of equipments and material from GETCO Haldarwa / Bharuch Transmission/ Construction
store and transportation, storage, preservation and conservation of equipment at the Site.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
b) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
c) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions of the
bidding documents permitted by the Owner and therefore, the Bidders are advised that while making
Bid Proposals and quoting prices these conditions may appropriately be taken into consideration.
Bidders are required to furnish a certificate in this regard as per the format provided in Special
Conditions of Contract in a separate sealed envelope containing Bid security, which shall accompany
the Technical Bid. Any Bid not accompanied by such certificate shall be rejected by the Owner and
shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data
Sheets and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid
Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
schedules, enclosed in bid proposal sheets for erection, and other services it proposes to furnish under
the contract. The %(Percentage) above/below indicated shall be inclusive of GST applicable on
required inputs and services.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation
of the Supplier from Composition scheme during the tenure of the contract, the rate (i.e. price)
mentioned in the price bid shall be final and any additional GST will have to be borne by the tenderer
himself. In no case additional amount towards GST or otherwise will be paid / reimbursed to
supplier/contractor. Further Statutory Variation clause will not be applicable in case of Supplier
/Contractor has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will have the
option to take the prices as exclusive of taxes and duties at maximum higher slab rates for the
evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B). The
price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends to
supply the goods / services, meaning thereby the bidder has to supply the goods / services from the
relevant declared / registered place of supply only.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and
shall not be subject to variation on any account saving for change in quantity. A bid submitted with an
adjustable price quotation shall be treated as non-responsive and rejected.
14.0 Taxes and Duties: -
14.1 As regards the income Tax, surcharge on income tax and any other tax excluding GST & welfare cess
at prevailing rate, the owner shall not bear any tax liability whatsoever. The bidder shall be liable and
responsible for payment of such taxes as attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause 14.1 above the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on the
cost of items of supply included in the works contract) as may be mandatory in terms of the law. The
owner shall not bear any liability in this regard but shall issue necessary certificate in respect of such
deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract with effect
from the next day of the date submission of the bid and if the contractor is required to pay additional
tax or duty, then the owner shall reimburse the contractor the additional tax or duty so paid by the
contractor against submission by the contractor of documentary evidence to the satisfaction of the
owner. This provision will not be applicable to transaction between the contractor and his sub-
contractors. Besides the said statutory variation, no other statutory variation shall be payable by the
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to those indicated by
the Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per Clause
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by any
order, regulation or bye-law having the force of law the amount of such increase or reduction shall be
added to or deducted from the “Contract Price” as the case may be for direct transactions between
contractor & owner, and not for bought out items. It is the Bidders responsibility to furnish details of
taxes, duties, levies etc. applicable as on the date of submission of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing tax or
duty or introduction of a new tax or duty applicable shall be entertained by the Owner during the
extended period of contract, if any, provided the extension of the contract is required by causes
attributable to the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a
new tax or duty will be applicable only to the direct transaction between the contractor and the
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat
the applicability of Tax (GST) etc in respect of this work and include the same in the quoted price. No
separate claim in this regard will be entertained by the Owner, as it is the responsibility of the Bidder
to pay all these taxes.
14.8 In addition, the conditions detailed under Special Conditions of Contract shall apply.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule
for performing the specified works.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying
Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the major
factors in consideration of the bids.
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in General Terms and Conditions of Contract and in Erection Conditions of this Part-I.
Bidder’s attention is specifically invited to these clauses. Bid price shall include all the costs in
fulfilling all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment tools
& tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing and
commissioning including performance and guarantee tests of the equipment. If any such equipment is
listed anywhere else in the proposal and not specially mentioned in the above schedule, it shall be
deemed to have been included in the Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1: The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated
cost plus GST to be paid through RTGS/NEFT only
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be
made payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive. No
exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender.
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies
within thirty days of letter of award of contract)
21.0 Contract Quality assurance:
21.1 The Bidder shall include in his proposal the Quality Assurance Programme containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during
various phases as detailed in relevant clause of the General Technical Conditions.
21.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be followed for the
execution of the Contract will be mutually discussed and agreed and such agreed Programme shall form
a part of the Contract.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
21.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being
supplied wherever specifically indicated in the tender document shall supply only from those vendors.
Such details shall be accompanied by their list of previous supplies made performance reports etc.
However, in case of orders are placed, specific approval shall be obtained from the owner for the
vendor-supplied materials.
22.0 Signature of Bids:
22.1 The bid must contain the name, residence and place of business of the person or persons making the
bid and must be signed and sealed by the Bidder with his usual signature. The names of all persons
signing should also be typed or printed below the signature.
22.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s) or other
authorized representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf
of such Corporation/Company in the matter.
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
22.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such bids
will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of the
Bidder shall be furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
24.0 Deadline for submission of bids:
24.1 Bids submitted by telex/telegram will not be accepted. No request from any Bidder to the Owner to
collect the proposals from airlines, cargo agent etc. shall be entertained by the Owner.
24.3 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the
Bidding Document in which case all rights and obligations on the Owner and Bidders previously subject
to the deadline will thereafter be subject to the deadline as extended.
25.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
26.0 Modification and withdrawal of bids:
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the
expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its bid
E. BID OPENING AND EVALUATION
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids in the presence of Bidder’s representatives who choose to
attend on the date and time mentioned for opening of bids in the Invitation to Bid or in case any
extension has been given thereto, on the extended bid opening date and time notified to all the
Bidders who have purchased the bidding document. The Bidder’s representatives who are present shall
sign a register evidencing their attendance.
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the Owner, at
his discretion may consider appropriate, will be announced in the Technical Bid Opening.
27.3 The price bids (On line) of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present. The date &
time of opening the Price Bid shall be intimated to all such qualified bidders by Fax/Telex, at least one
week in advance besides inviting final price bid if found appropriate after evaluation of Technical bids.
27.4 The Bidder’s name, lumpsum Bid Price, all discounts if any, modifications in the Price Bid and any such
other details as the Owner, at his discretion, may consider appropriate, will be announced/ furnished
in the Price Bid (On line) Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these specifications
and documents. All technically responsive bids shall then be examined to determine the LOWEST
EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids
are under consideration, Bidders and/or their representatives and other interested parties are advised
to refrain from contacting by any means, the owner and/or his employees/representatives on the
matters related to Bids under consideration.
29.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing
and no change in the price or substance of the bid shall be sought, offered or permitted.
30.0 Preliminary Examination:
30.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed, and whether the bids are generally in order.
30.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the
unit price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the
total bid amount will be corrected accordingly. If there is a discrepancy between words and figures,
the amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
errors as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder
case of any inconsistency in the prices furnished in the specified prices schedules to be identified in Bid
Form for this purpose, the Owner shall be entitled to consider the highest price for the purpose of
evaluation and for the purpose of award of Contract use the lowest of the prices in these schedules.
30.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid
to the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one, which
conforms to all the terms and conditions of the Bidding Document without material deviations. A
material deviation is one which affects in any way the prices, quality, quantity or delivery period of
the equipment, completion of works or which limits in any way the responsibilities or liabilities of the
Bidder of any right of the Owner as required in these specifications and documents. The Owner’s
determination of a bid’s responsiveness shall be based on the contents of the bid itself without
recourse to extrinsic evidence.
30.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
30.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
attribute to material deviation, provided such waiver does not prejudice or affect the relative ranking
31.0 Evaluation of Price Bids:
31.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
31.2 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall
be derived as under:
Differential Price (DP)=n1F1+n2F2….+nnFn, where F1, F2…..Fn are the various factors in Indian Rupees
per unit of parameter differential or deficiency in the equipment and services offered as stipulated in
these specifications: n1, n2…nn are the respective parameter differential or deficiency in the
corresponding units to be determined from the Bidder’s proposal. The above factors and corresponding
units of parameter differential are derived from the Technical Specifications, Data sheets and/or
Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D)
and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
31.3 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be rendered
as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
W = Q + DP + D, Where
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other components
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
evaluated bid and, as a result of this comparison, the lowest bid will be selected for the award of the Contract.
AWARD OF CONTRACT
32.0 Award Criteria
32.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that
the Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the
sole judge in this regard.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with
the terms and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject
all bids at time prior to award of contract, any without thereby incurring any liability to the affected
Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the
Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or e mail or FAX, to be confirmed in writing
by registered letter, that his bid has been accepted.
34.2 The notification of award will attribute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 38 .0,
the Owner will promptly notify each unsuccessful Bidder and will discharge his bid security, pursuant to
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the
Owner will send the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 7 days of receipt of the detailed of Award, the successful bidder shall sign the same with date
and return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 15 (Fifteen) days of notification of Award.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
35.4 The contractor will have to give indemnity bond for material on Non-judicial Stamp paper of value Rs.
300/- to GETCO as per attached format. The cost of stamp paper will be borne by the contractor.
35.5 The contractor will have to give safety cum indemnity bond on Non-Judicial Stamp paper of value Rs.
300/- to GETCO against any possible claim of compensation for damage to contractor’s staff or any of
third party during the execution of work. The cost of stamp paper will be borne by the contractor.
35.6 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Transmission Circle, GETCO, Bharuch before commencement of works as per GETCO’s prescribed
Proforma .The cost of stamp paper will be borne by the contractor.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be
required to furnish a performance guarantee in form of Bank guarantee from a Public Sector Indian
bank/Scheduled, Commercial Bank in the form to be furnished. The guarantee amount shall be equal to
ten percent (10%) of the Contract price and it shall guarantee the faithful performance of the Contract
in accordance with the terms and conditions specified in these documents and specifications. The
guarantee shall be valid up to 90 days after the end of Warranty Period.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and
installed by him shall be free from all defects in design, material and workmanship and shall upon
written notice from the Owner fully remedy free of expenses to the Owner such defects as
developed under the normal use of the said equipment within the period of guarantee specified in
the relevant clause of the General Terms and Conditions in the Part-I/Special Conditions of
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be trued as limiting the damages under clause entitled “Equipment Performance
Guarantee” in Technical Specifications, Part-II and damages stipulated in other clauses in the Bid
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period,
unless otherwise specified in Special Conditions of Contract.
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR.) CIRCLE GETCO, Bharuch or any of its subsidiaries
and shall include its legal representatives, successors and assigns.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and
shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to
time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and
materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and
such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir which
may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the contract
agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works
including erection, testing and putting into satisfactory operation including successful completion of
performance and guarantee tests to be performed at Site by the Contractor including cost of
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized representative
1.12 ‘Notice of Award of Contract’/’Letter of Award’ shall mean the official notice issued by the Owner
notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over signature
and/or seal as the case may be.
1.20 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’,
‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words
and phrases of like importance are used the approval, judgment, direction etc. is understood to be a
function of the Owner/Engineer.
1.17 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.18 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine
and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract
1.19 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in the
1.20 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which
cannot be detected during inspection, testing etc, based on the technology available for carrying out
1.21 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any :
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter
of the Contract.
1.22 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.23 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by provisions in other
parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be deemed to form an
integral part of the Contract:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract, the Special Conditions of Contract. and all other
documents included under Part-I, Part-II and Part-III.
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special terms
and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be referred to
the Engineer whose decision shall be considered as final and binding upon the parties.
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or
on behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be made
in confidence and shall extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
4.3 The Contractor shall not communicate or use in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the
site, dimensions, quantity, quality or other information, concerning the works unless prior written
permission has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain
the property of the Owner and shall be returned (in all copies) to the Owner on completion of the
Contractor’s performance under the Contract if so required by the Owner.
5.0 TRANSMISSION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will
be treated as a single Contract. Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of all
the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site installation
testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch
documents be required to execute an Indemnity Bond in favour of the Owner in the form acceptable to
the Superintending Engineer (TR.) GETCO Bharuch for keeping the equipment in safe custody and to
utilize the same exclusively for the purpose of the said Contract. Samples of proforma for the
Indemnity Bond will be furnished during award of Contract.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
5.3 The Contract shall in all respects be trued and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Bharuch shall have
exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 15 days of the acceptance of the
Letter of Award, at the office the Owner at Bharuch on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated time,
the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one
signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be trued to be a waiver of
such provisions, rights or options or in anyway to affect the validity of the Contract. The exercise by
either party of any of its rights herein shall not preclude or prejudice either party from exercising the
same or any other right it may have under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the
clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
11.0 TIME – THE ESSENCE OF CONTRACT
11.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner
without or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to
be the essence of the Contract. The Contractor shall so organize his resources and perform his work as
to complete it not later than the date agreed to.
11.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as design, procurement,
manufacturing, shipment and field erection activities within seven (7) days of the date of LOI.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
11.3 The above bar chart shall be compatible with the Owner’s computer environment and furnished to the
Owner on such media as may be desired by the Owner.
12.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given
by the respective Transmission sub division unless otherwise provided in LOI.
13.0 PENALTY FOR DELAY
13.1 If the Contractor fails to successfully complete the commissioning within the time fixed under the
Contract, the Contractor shall pay to the Owner as penalty a sum specified for each specified period of
delay. The details of such penalty are brought out in the accompanying Special Conditions of Contract
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
Contract prices plus GST detailed in the Special Conditions of Contract (SCC).
14.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss
or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified promptly
and he shall assist wherever possible in making necessary corrections. This shall not relieve the
Contractor of his liabilities under the terms and conditions of the Contract.
14.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so rectified or corrected until the expiry of
six (6) months from the date of such rectification or correction. If any defects are not rectified within a
reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost but
without prejudice to any other rights which the Owner may have against the Contractor in respect of
14.3 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
14.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
15.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the
Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be responsible
for payment of all Indian duties, levies and taxes lawfully assessed against the Contractor for his
personal income & property only.
16.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the
failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or
things under the Contract, or for damage or injury caused by the alleged omission or negligence on the
part of the Contractor, his agents, representatives or his Sub-Contractors, or in connection with any
claim based on lawful demands of Sub-Contractors, workmen, suppliers or employees, the Contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
shall in all such cases indemnify and keep the Owner, and the Engineer and/or his representative,
harmless from all losses, damages, expenses or decrees arising of such action.
17.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor
from all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as
the Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments
made under the Contract shall be treated as on-account payments.
18.0 ENGINEER’S DECISION
19.0 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
19.1 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days
after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
19.2 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent
to the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to
as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the
Contractor except as directed in writing by the Engineer, but the Engineer shall have full powers
subject to the provisions hereinafter contained, from time to time during the execution of the
Contract, by notice in writing to instruct the Contractor to make such variation without prejudice to
the Contract. The Contractor shall carry out such variation and be bound by the same conditions as far
as applicable as though the said variations occurred in the Contract Documents. If any suggested
variations would, in the opinion of the Contractor, if carried out, prevent him from fulfilling any of his
obligations or guarantees under the Contract, he shall notify the Engineer thereof in writing and the
Engineer shall decide forthwith whether or not, the same shall be carried out and if the Engineer
confirms his instructions, the Contractor’s obligations and guarantees shall be modified to such an
extent as may be mutually agreed. Any agreed difference in cost occasioned by any such variation
shall be added to or deducted from the Contract Price as the case may be.
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials
are already prepared or any design, drawings or pattern made or work done as per the contract
requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement
of carrying out the alterations or additional or substituted work which either then or later on, will in
the opinion of the Contractor, involve a claim for additional payment, the Contractor shall immediately
and in no case later than thirty (30) days, after receipt of the instructions aforesaid and before
carrying out the instructions, advise the Engineer to that effect. But the Engineer shall not become
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
liable for payment of any charges in respect of any such variations, unless the instructions for the
performance of the same shall be confirmed in writing by the Engineer.
20.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing,
so to the extent of any change in the price, before the Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct
the Contractor, in writing, during the execution of the Contract to vary the quantities of the items or
groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section
GCC of this Volume-I. The Contractor shall carry out such variations and be bound by the same
conditions as though the said variations occurred in the Contract Documents. However, the Contract
Price shall be adjusted at the rates and the prices provided for the original quantities in the Contract.
21.0 CHANGE OF QUANTITY
21.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms &
conditions. Such variations unless otherwise specified in the accompanying Special Conditions of
Contract and/or Technical Specifications, shall not be subjected to any limitation for the individual
items but the total variations in all such items under the Contract shall be limited to a percentage of
the Contract price as specified in the Special Conditions of Contract.
21.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above.
22.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers
and freely exchange with them such technical information as is necessary to obtain the most efficient
and economical design and to avoid unnecessary duplication of efforts. The Engineer shall be provided
with three copies of all correspondence addressed by the Contractor to other Contractors and
Consulting Engineers of the Owner in respect of such exchange of technical information, wherever
23.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor
any order by the Owner or the Engineer for payment of money or any payment for or acceptance of,
the whole or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any
possession taken by the Engineer shall operate as a waiver of any provision of the Contract, or of any
power herein reserved to the Owner or any right to damages herein provided nor shall any waiver of
any breach in the Contract be held to be a waiver of any other or subsequent breach.
24.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the
rights of the Owner against the Contractor or relieve the Contractor of his obligation for the due
performance of the Contract, or be interpreted as approval of the Works done or of the equipment
furnished and no certificate shall create liability for the Owner to pay for alterations, amendments,
variations or additional works not ordered, in writing , by the Engineer or discharge the liability of the
Contractor for the payment of damages whether due, ascertained, or certified or not or any sum
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
against the payment of which he is bound to indemnify the Owner, nor shall any such certificate nor
the acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of the
Owner against the Contractor.
25.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own cost
submit periodic progress reports as may be reasonably required by the Engineer with such materials as,
charts, net-works, photographs, test certificates, etc. Such progress reports shall be in the form and
size as may be required by the Engineer.
26.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished and
erected by the Contractor, the Engineer shall issue to the Contractor a Taking Over Certificate as a
proof of the final acceptance of the equipment. Such certificate shall not unreasonably be withheld nor
will the Engineer delay the issuance thereof on account of minor omissions or defects which do not
affect the commercial operation and/or cause any serious risk to the equipment. Such certificate shall
not relieve the Contractor of any of his obligations which otherwise survive, by the terms and
conditions of the Contract after issue of such certificate.
27.1 The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract.
27.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
28.0 Payment Schedule
28.1 Application for Payment
28.2 The Contractor shall submit application for the payment in the prescribed Performa of the Owner.
Performa for application for payment will be as prescribed.
29.1 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the equipment
shipped/brought on to the site pursuant to the Contract up to the date mentioned in the application
and for the period covered since the last preceding certificate, if any.
29.2 Every interim payment certificate shall certify the Contract value of the Works executed upto the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any
interim payment certificate in respect of the works that, according to the decision of the Engineer,
does not comply with the Contract.
29.3 Mode of Payment
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
29.4 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank or directly
to the Contractor as per the payment schedule.
29.5 The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland
transportation (including port handling), insurance and the erection portion of the Works shall be made
direct to the Contractor by the Owner.
29.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after
signing the Contract Agreement. The payments linked with the dispatch of materials shall only be made
after production of all dispatch documents as specified in the relevant Contract conditions which will
interalia include the Material Inspection Clearance Certificate issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of
quality check points involved in the quantum of work billed.
30.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. The Owner to the
Contractor shall bill all such claims regularly as and when they fall due. Such bills shall be supported by
appropriate and certified vouchers or explanations, to enable the Contractor to properly identify such
claims. Such claims shall be paid by the Contractor within thirty (30) days of the receipt of the
corresponding bills and if not paid by the Contractor within the said period, the Owner may then
deduct the amount, from any money due or becoming due by him to the Contractor under the Contract
or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
31.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all perils
detailed herein. The form and the limit of such insurance as defined herein together with the under-
writer in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period of Contract shall
be of Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of his
contractual responsibilities and obligations. The insurance covers to be taken by the Contractor shall
be in the joint name of the Owner and the Contractor. The Contractor shall, however, be authorized
to deal directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely convertible currency.
31.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into
satisfactory operation and all activities to be performed till the successful completion of commissioning
of the equipment shall be to the account of the Contractor. The Contractor shall be responsible for
preference of all claims and make good the damages or loss by way of repairs and/or replacement of
the equipment, damaged or lost. The transfer of title shall not in any way relieve the Contractor of
the above responsibilities during the period of Contract. The Contractor shall provide the Owner with
copy of all insurance policies and documents taken out by him in pursuance of the Contract. Such
copies of documents shall be submitted to the Owner immediately after such insurance coverage. The
Contractor shall also inform the Owner in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc., as
may be necessary well in time.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
31.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in
transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions,
accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be
liable to make good the full replacement/rectification value of all equipment/materials and to ensure
their availability as per project requirements.
31.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account
and will be included in Contract Price, However, the Owner may from time to time, during the
pendency of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and in
such a case, the parties to the Contract will agree for a mutual settlement, for reduction in Contract
price to the extent of reduced premia amount. The Contractor, while arranging the insurance shall
ensure to obtain all discounts on premia, which may be available for higher volume or for reason of
financing arrangement of the project.
31.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
31.6 Special Conditions of Contract details out the various insurance liabilities.
32.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
33.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
34.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or
his authorized agents, then the Contractor shall be given due extension of time for the completion of
the Works, to the extent such omission on the part of the Owner has caused delay in the Contractor’s
performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be
35.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if
such delays have resulted in any increase in cost. The Owner shall examine the justification for such a
request for claim and if satisfied, the extent of compensation shall be mutually agreed depending upon
the circumstances at the time of such an occurrence.
36.0 FORCE MAJEURE
36.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics:
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, embargoes.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the
other in writing of such causes.
36.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
37.0 SUSPENSION OF WORK
37.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the
Works will be issued by the Engineer to the Contractor in writing. The time for completion of the works
will be extended for a period equal to duration of the suspension.
37.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the
works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to some
default on the part of the Contractor or his Sub-Contractor.
38.0 CONTRACTOR`S DEFAULT
38.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse
or neglect to comply with any reasonable order given to him, in writing by the Engineer in connection
with the works or shall contravene the provisions of the Contract, the Owner may give notice in writing
to the Contractor to make good the failure, neglect or contravention complained of. Should the
Contractor fail to comply with the notice within thirty (30) days from the date of serving the notice,
then and in such case the Owner shall be at liberty to employ other workmen and forthwith execute
such part of the works as the Contractor may have neglected to do or if the Owner shall think fit,
without prejudice to any other right he may have under the Contract to take the work wholly or in part
out of the Contractor’s hands and re-contract with any other person or persons to complete the works
or any part thereof and in that event the Owner shall have free use of all Contractor’s equipment that
may have been at the time on the Site in connection with the works without being responsible to the
Contractor for fair wear and tear thereof and to the exclusion of any right of the Contractor over the
same, and the Owner shall be entitled to retain and apply any balance which may otherwise be due on
the Contract by him to the Contractor, or such part thereof as may be necessary, to the payment of
the cost of executing the said part of the Works or of completing the Works as the case may be. If the
cost of completing of works or executing part thereof as aforesaid shall exceed the balance due to the
Contractor shall pay such excess. Such payment of excess amount shall be independent of the
liquidated damages for delay which the Contractor shall have to pay if the completion of works is
38.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
38.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time
thereof. The Contract Performance Guarantee shall be valid for the full value and for the full period
of the Contract including guarantee period.
39.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
39.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other
than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event
give fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
39.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to
the extent they are related to the work terminated and terms satisfactory to the Owner, stop all
further sub-contracting or purchasing activity related to the work terminated, and assist Owner in
maintenance, protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
39.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and
if the Contractor is a partnership concern and one of the partners dies then unless the Owner is
satisfied that the legal representatives of the individual Contractor or of the proprietor of the propriety
concern and in the case of partnership, the surviving partners, are capable of carrying out and
completing the Contract the Owner shall be entitled to cancel the Contract as to its incompleted part
without being in any way liable to payment of any compensation to the estate of deceased Contractor
and/or to the surviving partners of the Contractor’s firm on account of the cancellation of the
Contract. The decision of the Owner that the legal representatives of the deceased Contractor or
surviving partners of the Contractor’s firm cannot carry out and complete the Contract shall be final
and binding on the parties. In the event of such cancellation the Owner shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the
surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
40.0 FRUSTRATION OF CONTRACT
40.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section
of the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance
portion of the Contract, subject to provisions contained in sub-clause 45.3 below.
40.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason
of willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties
hereto shall be relieved from carrying out further obligations under the Contract treating it as
frustration of the Contract.
40.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on
quantum merit_ basis, which shall be determined by mutual agreement between the parties.
41.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor
or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their
behalf in relation to the obtaining or to the execution of this or any other Contract with the Owner,
shall in addition to any criminal liability which it may incur, subject the Contractor to the cancellation
of this and all other Contracts and also to payment of any loss or damage to the Owner resulting from
any cancellation. The Owner shall then be entitled to deduct the amount so payable from any money
otherwise due to Contractor under the Contract.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
RESOLUTION OF DISPUTES
42.0 SETTLEMENT OF DISPUTES
42.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
42.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the progress
of the Works or after its completion or whether before or after the termination, abandonment or
breach of the Contract, it shall, in the first place, be referred to and settled by the Engineer, who,
within a period of thirty (30) days after being requested by either party to do so, shall give written
notice of his decision to the Owner and the Contractor.
42.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by the
Contractor who shall proceed with the Works with all due diligence, whether he or the Owner requires
arbitration as hereinafter provided or not.
42.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the
said decision shall become final and binding on the parties.
42.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with
any such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty
days, as the case may be, either party may require that the matters in dispute be referred to
arbitration as hereinafter provided.
43.0 ARBITRATION
43.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become
final or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
43.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the Contractor
and the Owner and the third to be appointed as an umpire by both the arbitrators in accordance with
the Indian Arbitration Act. If either of the parties fails to appoint its arbitrator within sixty (60) days
after receipt of a notice from the other party invoking the Arbitration clause, the arbitrator appointed
by the party invoking the arbitration clause shall become the sole arbitrator to conduct the arbitration.
43.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration Act,
or any statutory modification thereof. The venue of arbitration shall be Bharuch.
43.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for making
the award. In the event of any of the aforesaid arbitrators dying, neglecting, resigning or being unable
to act for any reason, it will be lawful for the party concerned to nominate another arbitrator in place
of the outgoing arbitrator.
43.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party shall be
limited in the proceedings before such arbitrators to the evidence or arguments put before the
Engineer for the purpose of obtaining the said decision.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
43.4 No decision given by the Engineer in accordance with the foregoing provisions shall disqualify him as
being called as a witness or giving evidence before the arbitrators on any matter whatsoever relevant
to the dispute or difference referred to the arbitrators as aforesaid.
43.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to carry out
their respective obligations under the Contract.
44.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every month, a statement covering payments claimed and the
payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The
Contractor shall also prepare and submit a detailed account of Owner Issue materials received and
utilized by him for reconciliation purpose in a format to be discussed & finalized with the Owner before
the award of Contract.
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these specifications
& document and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative
at Site suitably designated for the purpose of overall responsibility and coordination of the works to be
performed at Site. Such person shall function from the Site office of the Contractor during the
pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the
Payment of Wages Act (both of the Government of India) and the rules made thereunder in respect of
any employee or workman employed or engaged by him or his Sub-Contractor. He shall abide by labour
laws and others as specified in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract
shall be to the account of the Contractor. Should any such inspection or registration need to be re-
arranged due to the fault of the Contractor or his Sub Contractor, the additional fees to such
inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection, testing and
commissioning of the equipment to be supplied & erected under the Contract. The Owner shall
continue to hold the lien on all such equipment throughout the period of Contract. No material brought
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
to the Site shall be removed from the Site by the Contractor and/or his Sub-Contractors without the
prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the
Owner may approve and the Owner shall give the Contractor reasonable facilities for carrying out the
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site, except by the
special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative, shall
be communicated to the said authorized resident representative of the Contractor and the
representative shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner
and doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange to
perform his work as to minimize, to the maximum extent possible, interference with the work of other
Contractors and their workmen. Any injury or damage that may be sustained by the employees of the
other Contractors and the Owner, due to the Contractor’s work shall promptly be made good at the
Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such
employee has misconduct himself or is incompetent or negligent or otherwise undesirable and then the
Contractor shall remove such a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method of
work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the field
activities. Such reviews shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor will be entertained
because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The
Contractor shall be solely responsible for the safety, adequacy and efficiency of plant and equipment
and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the
safety of all persons employed by him or his Sub–Contractor and all the properties under his custody
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
during the performance of the work. This requirement shall apply continuously till the completion of
the Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall highlight
comparison to the schedules. The report shall also indicate the reasons for the variance between the
scheduled and actual progress and the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule for
the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances
and other payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency under
any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour
Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner may
make such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at
site, land for Transmission of Contractor’s field office, workshop, stores, etc. required for execution of
the Contract. Any such temporary Transmission shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and
unless the Contractor has handed over the vacant possession of land allotted to him for the above
purpose, the payment of his final bill shall not be made.
13.2 Electricity:
Where power supply is available with the Owner for Transmission purpose the same will be provided at
the job site at one point of the distribution system as may be decided by Engineer. Electricity furnished
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
will be 440 volts, 3 phase, 50 cycles and 230 volts, 1 phase, 50 cycles. Each Contractor shall provide
and install all necessary transformers, switchgears, wiring fixtures, bulbs and other temporary
equipment for further distribution and utilization of energy for power and lighting and shall remove the
same on completion of the work. Should, however, electricity be used in the Contractor’s labour/staff
colony, the power so consumed shall be charged at the prevailing tariff rate of the GUVNL as prevalent
for that area at the time of award of work; the supply may be withdrawn if the power is used for
purposes other than for the work of the project and the Contractor shall not be entitled to any claim
whatsoever on account of any such action taken by the Engineer. For this purpose, contractor shall
have to apply to DISCOM for separate temporary connection on his name.
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the Transmission equipments; tools, tackles and scaffoldings required
for pre-assembly, erection, testing and commissioning of the equipment covered under the Contract.
He shall submit a list of all such materials to the Engineer before the commencement of work at Site.
These tools and tackles shall not be removed from the Site without the written permission of the
14.3 The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personnel shall be trained in
administering first-aid.
14.4 Cleanliness
14.4.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number of
personnel to keep the work area clean. Materials and stores shall be so arranged to permit easy
cleaning of the area. In areas where equipment might drip oil and cause damage to the floor surface,
a suitable protective cover of a flame resistant, oil proof sheet shall be provided to protect the floor
from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The
Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical control
points will be established and marked by the Engineer at site at suitable points. These points shall be
used as datum for the works under the Contract. The Contractor shall inform the Engineer well in
advance of the times and places at which he wishes to do work in the area allotted to him so that
suitable datum points may be established and checked by the Engineer to enable the Contractor to
proceed with his works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire
hazards to the extent practicable. Combustible materials, combustible waste and rubbish shall be
collected and removed from the Site at least once each day. Fuels, oils and volatile or inflammable
materials shall be stored away from the Transmission and equipment and materials storage areas.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for
firefighting. Enough of such trained personnel must be available at the Site during the entire period of
The Contractor shall have total responsibility for all equipment and materials in his custody/stores,
loose, semi-assembled and/or erected by him at Site. The Contractor shall make suitable security
arrangements ensure the protection of all materials, equipment and works from theft, fire, pilferage
and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the Contractor shall be
carried out in presence of contractor and is deemed considered as part of the work completion. If it is
anticipated that the above test may prolong for a long time, the Contractor’s workmen required for the
above test shall always be present at Site during such tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of
any damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor
shall submit to the Engineer every week a report detailing all the receipts during the week. However,
the Contractor shall be solely responsible for any shortages or damages in transit, handling and / or in
storage and erection of the equipment at Site. Any demurrage, wharf age and other such charges
claimed by the transporters, railways etc, shall be to the account of the Contractor. For shortages of
any materials issued by the GETCO for the work, recovery shall be made from you, on the basis of
prices of the materials (prevailing on the date of settlement of materials account) plus 15% supervision
charges plus GST as applicable.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of
the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment stored
shall be properly protected to prevent damage either to the equipment or to the floor where they are
stored. The equipment from the store shall be moved to the actual location at the appropriate time so
as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried by heating
before they are installed and energized. Motor bearings, slip ring, commutators and other exposed
parts shall be protected against moisture ingress and corrosion during storage and periodically
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation resistance at
least once in three months from the date of receipt till the date of commissioning and a record of such
measured insulation values maintained by the Contractor. Such records shall be opened for inspection
by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected
and stored in a suitable manner to prevent damage or deterioration in quality by storage.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
19.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof and
flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for him,
the Engineer will have the right to get it moved to the area earmarked for the Contractor at the
Contractor’s cost.
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment,
which require indoor storage. Normally, all the electrical equipment such as motors, control gears,
generators, exciters and consumables like electrodes, lubricants etc. shall be stored in the closed
storage space. The Engineer, in addition, may direct the Contractor to move certain other materials,
which in his opinion will require indoor storage, to indoor storage areas, which the Contractor shall
strictly comply with.
20.0 TRANSMISSION MANAGEMENT
20.1 The field activities of the Contractors working at Site, will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and
other Contractors and the tradesmen of the Owner regarding scheduling and coordination of work.
Such decision by the Engineer shall not be a cause for extra compensation or extension of time for the
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of discussions
during the meeting and the decision of the Engineer and shall strictly adhere to those decisions in
performing his works. In addition to the above weekly meeting, the Engineer may call for other
meetings either with individual Contractors or with selected number of Contractors and in such a case
the Contractors if called, will also attend such meetings.
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his
works in accordance with the specified Transmission schedule. If at any time, the Contractor is falling
behind the schedule, he shall take necessary action to make good for such delays by increasing his work
force or by working overtime or otherwise accelerate the progress of the work to comply with the
schedule and shall communicate such actions in writing to the Engineer, satisfying that his action will
compensate for the delay. The Contractor shall not be allowed any extra compensation for such
20.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or
supply or any other services to the Contractor except for the coordination work between various
Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished and
erected under the Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including Transmission
equipment, tools and tackles for the purpose of the works under intimation to the Engineer. All such
goods shall, from the time of their being brought vest in the Owner, but may be used for the purpose of
the works only and shall not on any account be removed or taken away by the Contractor without the
written permission of the Engineer. The Contractor shall nevertheless be solely liable and responsible
for any loss or destruction thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or owing
to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen (15)
days’ notice in writing of his intention to do so, the Owner shall be at liberty to sell and dispose off any
such goods, in such manner as he shall think fit and to apply the proceeds in or towards the satisfaction
of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of
the Engineer the materials such as Transmission equipment, erection tools and tackles, scaffolding etc.
with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and
the employees of other Contractors and Sub-Contractors and all public and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and
Conditions of Contract of this Volume-I, the following provisions will also apply to the portion of works
to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less
Workmen’s Compensation : As per statutory Provisions
Employee’s Liability : As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease
or death of members of public or damage to property of others, due to any act of omission on the part
of the Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots,
strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent both in
time and amount to take care of all his liabilities either direct or indirect, in pursuance of the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable Transmission conditions. No field activities shall be
performed by the Contractor under conditions, which might adversely affect the quality and efficiency
thereof, unless special precautions or measures are taken by the Contractor in a proper and
satisfactory manner in the performance of such Works and with the concurrence of the Engineer. Such
unfavorable Transmission conditions will in no way relieve the Contractor of his responsibility to
perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or elsewhere, are
properly protected and handed over to the Engineer. Similarly, the Contractor shall ensure that the
bench marks, reference points, etc which are marked either with the help of Engineer or by the
Engineer shall not be disturbed in any way during the performance of his Works. If any work is to be
performed which disturbs such reference the same shall be done only after these are transferred to
other suitable locations under the direction of the Engineer. The Contractor shall provide all necessary
materials and assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to GETCO or to others, working at the Site. The Contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and the Engineer, as he may deem necessary.
27.4 All equipment used in Transmission and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with
manufacturer’s Operation Manual and safety instructions and as per Guidelines/rules of GETCO in this
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the Contractor and will be promptly produced as and when desired by the
Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be
erected under the control and supervision of an experienced and competent person. For erection,
good and standard quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless expressly
permitted in writing by GETCO to handle such fuses, wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other
Contractor or Owner, he shall:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(a). Satisfy the Engineer that the appliance is in good working condition;
(b) Inform the Engineer of the maximum current rating, voltage and phases of the
(c) Obtain permission of the Engineer detailing the sockets to which the appliances
may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be an
earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No weight
of any description will be imposed on any cable and no ladder or similar equipment will rest against or
attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared safe by the
Engineer and a permit to work shall be issued by the Engineer before any repair work is carried out by
the Contractor. While working on electric lines/equipment, whether live or dead, suitable type and
sufficient quantity of tools will have to he provided by the Contractor to
electricians/workmen/officers.
27.14 In case any accident occurs during the Transmission/ erection or other associated activities undertaken
by the Contractor thereby causing any minor or major or fatal injury to his employees due to any
reason, whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the
Engineer in prescribed form and also to all the authorities envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property, and/or equipment. In such cases, the Contractor shall be informed in writing about
the nature of hazards and possible injury/accident and he shall comply to remove shortcomings
promptly. The Contractor after stopping the specific work can, if felt necessary, appeal against the
order of stoppage of work to the Engineer within 3 days of such stoppage of work and decision of the
Engineer in this respect shall be conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety
reasons as provided in para 27.15 above and the period of such stoppage of work will not be taken as
an extension of time for completion of work and will not be the ground for waiver of levy of liquidated
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements of Safety
Rules which would generally include but not limited to following:-
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so as
to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without
proper introduction as to the hazards incident thereto, both to himself and his
fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
around fire prone areas and adequate firefighting equipment shall be provided at
crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced
divers, use of gum boots for working in slushy or in inundated conditions are
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
essential requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO Safety Rules referred above, the latter shall be binding on the
Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident: Rs 1, 00,000/-These are applicable Causing death per
person plus GST for death
b. Major injuries or accident causing :Rs. 20,000/-Injury to any person.
25% or more permanent disablement per person plus GST, whosoever to
Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules
framed there under or any other applicable laws as applicable from time to time. In case the Owner is
made to pay such compensation then the Contractor is liable to reimburse the Owner such amount in
addition to the compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall
be in accordance with the relevant Codes and accepted good engineering practice, the Engineer’s
drawings and other applicable Indian recognized codes and laws and regulation of the Government of
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC) and
Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this contract and
are, in general, supplementary to related provisions under ITB, GCC and ECC. However, in certain
provisions which are contrary to those in ITB, GCC and ECC, the provisions in these Special Conditions
of Contract will prevail.
2.0 Tender Fee:
The tender fee specified in notice inviting tender is payable by RTGS/NEFT only.
3.0 Earnest Money Deposit (EMD):
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.1 (a) If the EMD amount is more than Rs.3 Lakhs, it should be paid either by RTGS/ NEFT/Online or
Demand Draft or Banker’s Cheque or Pay Order or Bank Guarantee. Otherwise it should be paid
either in Cash (up to Rs. 10,000/- only) at the office address specified in the tender document or
by RTGS/ NEFT/online.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the
5.0 Qualifying Criteria:
5.1 TECHNICAL CRITERIA:
Experience as per qualifying requirement.
5.2 FINANCIAL CRITERIA:
The financial turnover of bidder (Financial year) shall not be less than Rs. 25.36 lacs during last
(three) Financial years.
Registration of appropriate class with GETCO and validity of the registration should be furnished along with
the technical bid. Latest Bank solvency certificate of 20% of the tender value is required to be furnished
by the tenderer along with the technical bid.
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC, the following
documents/details are to be furnished by the Bidder:
1. GST Registration No. Date/ issuing authority.
2. Details of Partners/Directors of the Firm/Company.
3. Experience Record and details of orders pending / executed for various utilities
4. Last three years Audited Accounts/IT returns
5. Electrical contractor’s license with latest validation.
6. PF registration along with proof of challan etc.
7. Solvency certificate from Bank (up to 20 % of Bid value).
7.0 Price Inclusions (including Taxes & Duties):
7.1 The prices quoted shall be all inclusive of freight, octroi, transportation, loading, unloading & stacking
at site of equipment materials received from Transmission store GETCO Bharuch after observing all
store formalities of GETCO.
7.2 No extra payment toward any type of templates and erection tools /materials will be made.
7.3 GOOD & SERVICE TAX (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services within the original contractual delivery period. The amount and% of GST
and Cess as applicable should clearly be indicated separately. (GST/Cess means all applicable Tax/Cess
under GST Laws. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act,
CGST Act, UTGST Act and SGSCT Act, 2017and all related ancillary legislations).
You shall have to submit a C.A Certificate duly authorized Signatory of successful bidder, certifying that
you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not claim
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
any such Refund, on a future date, from the concerned Authorities and if, any Refund, in respect of
such GST and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without
COMPANY making any specific Claim, for the same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess is not
mentioned clearly unless the bidder has opted for Composition Scheme under GST Act, which should be
clearly indicated in the price bid. COMPANY may at its discretion consider such offer with presumption
of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of GST and
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation
of the Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the
price bid shall be final and any additional GST will have to be borne by the tenderer. In no case
additional amount towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
i. Contractor has to submit the GST Registration certificate.
ii. Contractor has to submit invoice/Challan as documentary proof with each RA bill & Final Bill and in
which it shall be specifically mention the nature of service &code SAC code under which the amount
of service tax GST payable by contractor and payable by GETCO (if any) without fail.
iii. GETCO will withheld the GST amount of contractor and it shall be reimbursed on production of
documents evidences of payment made by contractor
iv. The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of taxable service provided
The total GST payable thereon with bifurcation of GST payable by service provider and service
Rate and amount of taxes i.e. CGST/ SGST/ IGST/UGST
Place of supply along with the name of State, in case of a supply in the course
of inter-State trade or commerce i.e. Out of Gujarat Supply
Applicable SAC Code
Contractor has to also supply tax invoice as described under GST rules and Regulation
indicating GSTIN
v. Contractor has to provide Tax invoice in a standard format as per CGST act, CGST rules 2017 and GST
invoicing rules containing all details as provided in Act and rules. Contractor / Supplier has to mention
GST no. of GETCO i.e. 24AABCG4029R2ZC in the invoice invariably & failure of which payment will not
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of
GST (later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over
and above as charged in the invoice shall be borne by the Supplier/Contractor. However, any refund
received by the supplier / contractor on account of GST charged from the company; such refund shall
have to be passed on to the company, along with interest if any. Such refund along with interest needs
to be passed on suo-moto by the supplier / contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the rate of
15% per annum if GST charged is not paid / short paid to the government or fail to upload the details or
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for each
item of Goods/Service. If not specifically mentioned, then COMPANY will have the option to take the
prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of the tenders.
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder intends to supply
the goods /services, meaning thereby the bidder has to supply the goods / services from the relevant
declared / registered place of
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under
the GST Act, subsequent to the date of submission of the offer, the same should be passed on to
COMPANY and you should inform such changes to COMPANY from time to time.
Tax deduction at Source (TDS) under GST at the prevailing rate will be deducted from bills in accordance
with the provision of Section 51 of the CGST Act, 2017 and to that effect a certificate will be issued to
Goods and Service Tax Compliances (GST):
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work
executed will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations and
notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC codes
GETCO reserve right of re-classify, in case of mis-classification of goods and/or service (HSN/SAC
codes) Sec. 171 of CGST/SGST Act contains provisions related to anti-profiteering. On the basis of
same on introduction of GST, the Vendor should pass on the tax benefit/savings, if any, on account
of tax credits or lowering of tax rates to us by way of adjustment in the contract price. Non-
compliance of the
same may lead to levy of penalty by Government.
Contractor required to submit the invoice as per the standard formats/contents of GST laws
including invoice ruling. GST will be reimbursed subject to proper/ valid matching of
transactions/invoices on GSTN (GST network).
The contractor is abiding by the all rules and regulations of corporation and amendments, which
may publish subsequently for compliance by field offices with respect to GST Laws.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7.4 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in
the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers
offer if it takes place within the original contractual delivery date will be to COMPANY’s account
subject to the claim being supported by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the advantage will have to be
passed on to COMPANY. Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision
of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.6 Welfare Cess
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for supply,
erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects and civil
Contractor shall get registered under Welfare Cess Act before commencement of work. Office of the
Factory Inspector is authorized at present as a registering authority.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary
evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then contractors
shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of
utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to the
contractor on receipt of request letter along with documentary evidence of payment. For calculation of
welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value.
In case of EPC contracts covering supply, erection, testing & commissioning, the supply portion shall also
be considered for calculation of welfare cess.
If GETCO purchases material on its own without any reference to the estimate contract and gives/hand
over the material to the contractor for erection, testing & commissioning, then welfare cess on
procurement cost of the equipment of material shall also be applicable. Procedure same as narrated
Periodically, the evidence regarding filing of return and maintaining record as per the Act by the
contractor shall be verified by GETCO.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit
the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill, the contractor has to submit documentary evidence of payment
of welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to
submit documentary evidence of registration under Welfare Cess Act and evidence of payment of
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence
of payment by observing due formalities.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of LOI.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as a
Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable either
in DD payable at Bharuch /Bank guarantees from following Banks will be acceptable.
8.3 If the Contractor defaults in execution of the orders placed or if COMPANY suffers any financial loss due to
this, then COMPANY will be forfeited Security Deposit, EMD plus GST as applicable from other orders of
the same firm or by encasing the Bank Guarantee
(A) Guarantees issued by the following Banks will be accepted as SD/EMD on permanent basis.
1. All Nationalized Banks
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to March- 31,
or the issuance of new Government Resolution on the same subject whichever is earlier. The
validity cut-off date in GR is with respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
No. Bank Name No. Bank Name
1 AXIS Bank 22 South Indian Bank
2 AU Small Finance Bank 23 Standard Chartered Bank
3 Bandhan Bank 24 Tamilnadu Mercantile Bank
4 Barclays Bank 25 Utkarsh Small Finance Bank
5 City Union Bank 26 YES Bank
6 CSB Bank 27 Ahmedabad Mercantile Co-op. Bank
7 DBS Bank India Limited 28 Nutan Nagarik Sahakari Bank Ltd.
8 DCB Bank 29 Rajkot Nagarik Sahakari Bank Ltd
9 Equitas Small| Finance Bank 30 Saraswat Co-Operative Bank Ltd
10 ESAF Small Finance Bank 31 SBPP Co-Operative Bank Ltd.
11 FEDERAL Bank 32 SVC Co-Operative Bank LTD.
12 HDFC Bank 33 The Cosmo Co-operative Bank Ltd
13 HSBC Bank 34 The Gujarat State Co-operative Bank
14 ICICI Bank 35 The Mehsana Urban Co-Op. Bank Ltd
15 IDBI Bank 36 The Surat District Co-Operative Bank Ltd
16 IDFC First Bank 37 The Surat People's Co-Op. Bank Ltd
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
17 Jammu and Kashmir Bank 38 Kalupir Commercial Co-Op Bank
18 Jana Small Finance bank 39 The Panchmahal District Co-Operative Bank
19 Karnataka Bank 40 The Baroda District Co-Operative Bank
20 Karur Vysya Bank 41 Baroda Gujarat Gramin Bank
21 Kotak Mahindra Bank 42 Saurashtra Gramin Bank
8.4 No interest will be allowed on amount of Security deposit.
8.5 The Security Deposit- total shall be kept deposited up to completion of work finalization of final bill.
The same shall be return on receipt of N.O.C. by the concerned DE after observing GETCO’s procedure.
8.6 This security deposit is for the performance of contract and the same is liable to be forfeited by the
GETCO in event of non-fulfillment of the term and conditions of this contract by the contractor.
8.7 Corporate Guarantees are not admissible.
8.8 The ‘Signing of Contract ‘ and ‘ Contract Agreements’ will be done as per prevalent GETCO Terms and
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor workmanship
etc. for a period of one year from the date of commissioning.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in supply and erection beyond Contractual cutoff date stated
as per stipulated delivery period shall be subject to the penalty at the rate of ½ % of the contract
value per week plus GST of delayed work or part thereof, with a ceiling of 10 % of the total contract
value plus GST.
10.2 The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
10.3 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete
work, GETCO will get the remaining work executed at the risk & cost of contractor.
11.0 COMPLETION PERIOD
11.1 Overall period for this Contract will be 24 Months from the date of commencement
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the GETCO/Engineer and is complete in all respects
as per the terms and conditions of this Contract.
12.0 Presentation of Bills for s/s work
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed including cost of
material consumed is to be prepared in triplicate and submitted to Site Engineers in-charge of the
work, for necessary payment. These bills shall be serially numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and passing of final
bill. The contractor has to submit the final bill along with the material consumption statement and
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
other required data of the work carried out within 3 months from the date of completion of work.
These bills shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following information:
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the respective
RA bill shall be withheld and shall only be released at the time of final bill.
12.A Presentation of Bills for line work
12.A.1 Bills for 90% value of the erection work carried out during each calendar month as per above Clause
shall be submitted in triplicate to Deputy Engineer (Const), In charge of the works at the end of
that particular month, who will in turn process the same and forward to Executive Engineer
(Const), In charge of the works, for necessary payment. These bills shall be serially numbered with
12.A.2 Bills for 10% value of the erection work done as per above clause shall be submitted to Deputy
Engineer (Const), in charge of the works, who will in turn process them and forward them to
Executive Engineer (Const). I/C of the work for necessary payment. These bills shall be serially
numbered with Suffix-E-2.
12.A.3 The Contractor has to submit the final bill along with all required data of works carried out within
3 months from the date of commissioning of the line. The concern Dy.Engr /Ex.Engr (Const) must
record and process the final bill along with complete material account. The material account shall
include the credit of dismantled materials.
12.A.4 All the bills (in accordance with above Clauses) must be submitted with following informations:
a. Item wise work done during billing period i.e., respective month.
b. Item wise cumulative work done.
c. Account for tower materials & bolts-nuts, accessories consumed and balance stock.
d. Account of line materials consumed, wastages and balance stock.
For non-submission OR part submission of above information an additional 5% amount of the
respective RA. Bill will be withheld and released only after passing of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work in scope of
13.1 For erection works of s/s.
(i) 90% payment of amount claimed covering various activity such as structure, equipment
erection, earthing installation, control wiring, battery charging etc. works against R.A. bills
duly certified by EIC within 60 days from the date of R.A. bill.
(ii) Balance 10% of erection value shall be paid against completion of work only after settlement of
material account statement of items used, erected and successful commissioning of
transmission line the same amount will be release in final bill only and payment will be made
only after passing of final bill.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
13.A For erection works of line
13.A.1 Payment shall be made as under:
Up to 90% of the total value of the erection work done will be paid against monthly running
account bills to be submitted to the Engineer-in-Charge of the Construction Division concerned.
Balance 10% payment due will be made at the end of 12 months from the date of handing over of
the line or 18 months after completion of the line to the satisfaction of the Superintending
Engineer (Trans), Bharuch at his absolute discretion whichever is earlier only after passing of final
13.A.2 The payment of above balance 10% amount due will be made only after a material account
statement of items received and used or returned to stores is settled and passing of final bill. The
contractor must settle final bill within 3 Months from the completion date. Any discrepancy in the
quantities will have to be made good by the contractor or deduction of its cost as per The GETCO's
ledger value or market value whichever is higher, plus 15% supervision charges will be made while
settling the balance payment. This value of materials shall be prevailing on the date of submission
of the final material account to the GETCO.
13.2 PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link
https://getco.co.in/msme/ (and intimate to concern bill submitting office with copy to this
(2) The payment will be made within 45 days from the *date of acceptance or the **date of as deemed
acceptance of goods or services i.e After submission of all required documents as per at terms &
time to time circular issued by GETCO’s corporate office as well as statutory requirement to
process the bill.
*Date of acceptance means-
(a) The day of actual delivery of goods or the rendering services or
(b) Where any objection is made in writing by the buyer regarding acceptance of goods Or services, the
day on which such objection is removed by the supplier.
** Date of deemed acceptance” means-
where no objection is made in writing by the buyer regarding acceptance of goods or services within
fifteen days to the delivery of the goods or the rendering of
services, the day of the actual delivery of goods or the rendering or services.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Transmission store of S/S equipment and materials and keep
in safe custody and transport to the respective sites and will be fully responsible for any damage to or
loss of all materials at any stage during transportation or erection or taking over of the S/S by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his own
14.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi assembled
and/or erected by him at site in his custody. The Contractor shall make suitable security
arrangements at his own cost to ensure the protection of all materials, equipment and works from
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
theft, fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to
arrange for security till the works are finally taken over by the GETCO.
14.4 STORAGE-CUM-ERECTION INSURANCE: The contractor shall take suitable storage-cum-erection
insurance cover at his cost to the extent of 100 % cost of S/S materials, which are required to complete
the work. Bidder shall have to take the comprehensive Marine cum erection (MCE) insurance policy
against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the work by GETCO. However, if the work is not
completed within the stipulated time limit as mentioned into work order, the MCE shall be
extended by the contractor up to the work completion and taking over of the line or S/S by GETCO.
Moreover, the charge for extension of insurance shall be borne by contractor if the delay is
attributed to the contractor. The charge for extension of insurance shall be reimbursed by GETCO
to the contractor on production of proof for extension of MCE if the delay is attributed on the part
The Contractor shall deal directly and pursue the claim with the Insurance Company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The
proof of insurance policy taken by the successful Contractor shall be furnished/submitted to Engineer-
In-Charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. Bill payment will be withheld.
The approximate amount of the material required whose insurance is to be taken to complete the scope of
work is Rs. Or as per instructions of EIC.
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge,
pursue and settle all the claims with the Insurance Company for all items, materials and the GETCO
shall be kept informed about it. Contractor shall replace the lost / damaged materials / items
promptly irrespective of the settlement of the claims by underwriter and ensure that the work progress
is as per agreed schedule. The loss, if any, such replacement will have to be borne by the Contractor
and GETCO will not entertain any claim / representation in this regard. However, it will be contractor's
responsibility to insure the entire project till the S/S is taken over by the GETCO.
15.0 LABOUR LAWS:
15.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labour license under the contract Labour (Regulation and abolition)
Act for employing necessary manpower required by him. In the absence of such license, the contract
shall be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the GETCO indemnified
in respect thereof. Some of the major liabilities under various labour and industrial laws which the
Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or
other Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/- or later prevailing
rate with the Office of Commissioner of Labour as per the Contract Labour (Regulation and
Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed
under the various labour laws, in force from time to time, from Statutory Authorities like State
Government/ Government o India, which the Contractor shall have to comply with.
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee.
Provident Fund and Family pension Scheme at the rate of 18% (or at the rate made applicable by the
Government from time to time of the wages. The Contractor’s contribution and his workers
contribution towards Provident Fund and Family Pension Scheme shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad.
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the
Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident
Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour, shall
be provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for
individual labourer, which shall be duly verified, approved and certified by the authorized Officer of
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pendency of the
15.6 The contractor shall employ adequate number of experienced skilled at site for daily supervision and
for maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO
also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever, arising out of or in connection with the matters referred herein above elsewhere
and against all actions, proceedings, claims, demands, costs and expenses which may be made against
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
the GETCO or Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for or in respect of
performance of his obligation under the contract documents. The GETCO shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and keep
indemnified the GETCO against all claims, demands, proceedings, cost, charges and expenses
whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be covered
under the Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed
under the minimum wages act. The wages of every Contract Labour employed by him under
this contract shall also be paid by him before the expiry of 7 th day of the last day of the month
in respect of the wages are payable (i.e. wages of a month have to be paid by him in the first
week of the next month). Any default will result in cancellation of contract forthwith or else
the contractor shall be punishable to the extent of Rs. 100/- per each day or as per the
prevailing rules of labour laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of
labour trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his
office outside the factory work premises and the Contractor shall arrange to have his office
outside the factory work premises and the Contractor shall keep himself present throughout
the working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within contractual
period of delivery or in case the stores are found not in accordance with prescribed specification
and/or the approved sample, the GETCO shall exercise its discretionary power either:
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and at the risk of
the contractor for such stores not so delivered or other similar description without canceling the
contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the GETCO shall be
final. In the event of action taken under clause (A) or (B) above, the contractor shall be liable to
pay for any loss which the GETCO may sustain on that account, but the contractor shall not be
entitled to have any saving on such purchases made against default.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any
time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has to reduce
all the quoted rates proportionately. The reduction on overall basis will not be accepted (i.e. all
unit rates of erection schedule shall be reduced proportionately by difference in percentage). The
confirmation for matching end cost shall be given within 7 (seven) days from the letter from
16.0 VENDOR REGISTRATION:
REGISTRATION AS A CONTRACTOR:
Registration with GETCO is pre requisite for participating in tender. It is required to furnish
documents of registration along with offer in Technical bid and the details at appropriate place in
confirmation of details of bidder shall be given by the contractor
17.0 Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business
dealing/blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from
participating in the tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tenderer / Consultant / Vendor / Contractor.
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
blacklisting, is to protect the GUVNL and its subsidiary Companies from dealing with
undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business dealing /
blacklist are as Under.
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid,
until and unless it is sought for,
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.4. Has refused to accept letter of Acceptance / purchase Order / Work Order after the same is
issued by the Company within the validity period and as per agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled
1.2.7. Has failed to submit all the necessary tests reports / documents within time schedule/ as per
company’s time limit, as mentioned in the LOI, if the letter of Acceptance (LOA) is placed
subject to submission of type reports / documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with stipulated time
frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not returned or has
short returned or has unauthorisely disposed of materials / documents / drawings / tools or
plants or equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of
documents, in relation the tender / Contract.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the tendering
authority / purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the Company
given to the firm only for its use (in discharge of its obligation against an order) to any third
party without prior consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to Deal with the
1.2.16. In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / banned for business dealing /
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and / or
proprietor / partner / Director of the firm has not been placed on stop dealing / banned for
business dealing / blacklisting by GUVNL and It’s any subsidiary Companies as per Revised
19. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if there is
complaint against his misbehavior, misconduct or disloyalty towards job.
20. Terms and conditions regarding industrial laws and other related matters shall be complied by the
contractor in all respect.
21. The contractor shall ensure that all persons have provided safety tools, shoes, hamlets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO from
time to time in concern with the safety and security as the work to be carried out.
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information & should place on top of technical bid
specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD/Speed post. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by Yes / No
5) a) Whether the Bidder is registered with GETCO Yes / No
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. & date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
8) GST [IN PERCENTAGE] Yes/ No
Please quote your GST Registration No. & Date.
9) PENALTY TERMS AGREE Yes/ No
10) SECURITY TERMS AGREE Yes/ No
11) PAYMENT TERMS AGREE Yes/ No
12) Completion Period Agreed Yes/ No
13) TELEPHONE NOS. & FAX NO. & e-mail ID
14) AUTHORISED PERSON OF THE FIRM:
15) NAME OF THE PROPRIETOR, PARTNERS, DIRECTORS
[AS THE CASE MAY BE], ALONG WITH ADDRESS, TELEPHONE, FAX NO. etc.
Signature of Authorized Representative of
Name of tendering company
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipments and other material from the Board’s stores, checking them,
transporting to site's stores and keeping in safe custody by contractor.
ii) To take suitable storage-cum-erection insurance of equipments/materials issued by the
iii) Distribution of all materials to erection site at 66kv Sub Station.
iv) Structure/Equipment erection including fixing of attachments, accessories and tack-
welding of structures.,
v) Stringing of ACSR/AAAC Panther conductor bus with fixing of insulators, Hardware,
dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete the
transformer for commissioning.
3.1.3 The Board will supply equipments, structure materials, bolts-nuts, structure
accessories/attachments, insulators, insulator-hard wares, conductor, accessories, ground wire,
ground wire accessories, Control cable etc. required for erection of equipments and other
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest
Provisions under Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required during execution of
work. The Contractor solely is responsible for any damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till the complete
transformer is taken over by the Board, and thereafter up till guarantee period.
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who shall
exercise his own judgment with regards to actual handling of equipments & materials and in
deciding upon the best methods to be adopted for all the erection activities.
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural drawings,
and other erection drawings etc. provided by the Board.
3.2 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The bidders are
presumed to have acquainted themselves with the site before submitting their offer.
3.2.2 The successful bidder has to collect from concerned field office the detailed layout drawing along
with the following drawings for the substation duly approved by the Board immediately on receipt of
the Order. He shall also arrange visit of proposed site jointly with Board’s representative for
important marks coming across the scope of works under the contract. Structural drawings of 66 KV
Structures listed at Schedule –B
TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully comply with the
relevant Indian Standard. The IE rules and Acts in force from time to time shall also be applicable
during pendancy of the contract.
3.4. ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles, jigs and fixtures, winches, alignment tools, welding
sets, , breaker handling devices, all consumable items and Transmission equipment as required to
install the equipments and to complete the work in all respects and shall necessarily include (but
not limited to ) bolts, nuts, rivets, welding rods, shims, wedges, packing sheets, packing
compounds, oil installation and protection of individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of and connection of
cables, fabrication supply and installation of all support structures for installation of various
electrical equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables) shall also be
arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.4.6 All additional iron framework erected to put the equipment in operational condition shall be
provided with two coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against entry of rates,
lizard, and creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the following
activities have been completed.
3.5.2 Moving of all equipments to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments etc. as
described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.18.0. EARTHING ARRANGEMENTS: (TECHNICAL TERMS & CONDITIONS)
Standard Guidelines & Recommendations for Earthing System for EHV Sub-station issued vide
Circular R & M/3 dtd.5.11.12 & CE(TR) Circular 36 dtd. 23.9.08 to be followed.
The General notes for Earthing system & drawings for earthing the equipments (including
welding joints) are compiled in Drg. No. GETCO/E/STD/P-012 sheet 1 to 24 (available in SOR
3.19.1 The Contractor shall ensure that at the end of each sub-activity the Surplus materials are
immediately removed from the work-site and the surplus excavated earth is spreader around to
avoid loss or injury to the public/equipments.
3.19.2 The Contractor has to return all surplus materials after reconciliation of material account in good
and useable condition. The contractor shall settle the final bill including signature on all relevant
papers required for passing of final bill, excess/saving statement and time limit extension proposal.
If any within three months from the date of charging/commissioning or taking over by the Board of
the Sub Station.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.19.3. Most of all equipments should be erected in presence of the concerned engineer from OEM/GETCO
After complete erection and operation, contractor's supervisor should attend the site whenever
3.19.4. called from GETCO for further testing commissioning of equipments/panels etc.
1. All erection work is to be carried out as per the manual of OEM (Original equipment
manufacturer) and instruction of engineer-in-charge.
2. All equipment erection charges are inclusive of shifting dragging handling of the respective
equipment up to S/s erection site from its S/s site store.
3. Contractor has to ensure safe shifting dragging erection of all equipments to comply with labour
laws I.E. rules etc.
4. All erection charges are inclusive of fixing of clamp connectors, all necessary accessories to the
respective equipment.
5. Transformer erection charges cover shifting dragging, handling etc. for its bushings radiators
conservator tank and allied accessories.
6. All erection work includes erection insurance to be arranged by the contractor at his cost.
7. All the required tools and tackles like conductor, earth wire compression, jointing machine,
cutting machine, welding set etc, are to be arranged by the contractor at his cost.
8. For electrical lighting work prevailing SOR of Electrical work of R&B of GOG is to be followed.
3.21 Dismantling:
3.21.1 To ensure safety & Technical parameters in safe guard during dismantling, in person of
concerned Engineer in charge. Also to stack the materials at safe
place in proper stacking manner.
Signature of Contractor Superintending-Engineer
GETCO, CO, Bharuch
TECHNICAL PARTICULARS FOR ERECTION, TESTING AND COMMISSIONING OF
TRANSMISSION LINES ON D/C-M/C TOWERS:
4.1 The scope for erection works covered under this section consist of:
I. Check survey with minor survey work and if required, original survey and profiling.
taking delivery of structure and line material from the carrier/ The GETCO, checking them,
transporting to contractor's stores and keeping in safe custody,
II. to take suitable storage-cum-erection insurance,
III. distribution of all materials to erection site,
IV. Excavation, stub-setting, concreting etc. complete work for foundation including dewatering, shoring &
shuttering, cutting of stubs, fabrication and supply of chimney material and form boxes etc.
V. Tower erection including fixing of attachments, accessories and tack welding,
VI. Stringing of AAA/ACSR conductor/s and ground wires with providing jumpers etc. upto sub-station
gantries at both ends and making LILO arrangement including dismantling work with one circuit in
live condition wherever applicable and if the item is included in Schedule B. De-stringing of existing
66kV D/C line including grounding of insulator string, clamping, grounding of earth wire/conductor
crediting to The GETCO’s store.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
VII. Testing, commissioning and guarantee of all the activities carried out from (I) to (VII).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete the line for
3.1.3 The GETCO will supply structure materials, bolts-nuts, attachments, insulators, insulator-
hardwares, conductor, accessories, ground wire, ground wire accessories, etc. required for
erection of transmission line.
3.1.4 All works shall be carried out in accordance with the revised and latest provisions under Indian
Electricity Act and Rules made there under.
3.1.5 All the erection tools required during construction of line shall be arranged by the contractor at his
own cost. The Contractor shall only be responsible for damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till the complete line is
taken over by the GETCO.
4.2.1 The proposed route of the line is available with concerned field office. The tenderers are presumed
to have acquainted themselves with the route of line before submitting their offer.
4.2.2 The successful bidder has to collect from concerned field office the detailed route on topographic
sheet duly approved by the GETCO immediately on receipt of the Order. He shall also arrange visit
of proposed line route jointly with The GETCO's representative for important marks coming along
with the route.
4.3.1 On completion of final survey (check survey), the contractor should return the copy of original
profiles along with copies of final survey to the Engineer-in-Charge of the work, before
commencement of digging of pits. If, any subsequent alteration is found necessary i.e. during
check survey, the contractor shall have to submit full details of such alteration with justification
and obtain approval of the Superintending Engineer before carrying out the work. The contractor
will be responsible for any inaccuracies that may arise due to incorrect survey / spotting of tower
etc. and should rectify such inaccuracies at his own cost. The approval of check survey shall be
obtained from the E.E. (AM) concerned.
4.3.2 For important crossing like major road, railways, rivers, power line, telecommunication lines etc.
the clearances shall be provided in accordance with the prevailing rules of the concerned
4.3.3 Tension towers with double tension hardware shall be located on either side for railway and power
line crossings depending on the merits of each case. Necessary copies of finally approved drawings
required for approval of concerned authority shall be supplied by the Contractor free of cost.
4.3.4 The angle of crossing shall be maintained at 90 Deg. as far as possible for crossings like river,
railway, power line and P&T crossings but never less than 70
4.3.5 The crossing towers with double suspension hardware and dead end type anchor towers shall be
located for major river crossings.
4.4 TAKING DELIVERY AND DISTRIBUTION OF MATERIALS:
4.4.1 The Contractor has to take delivery of tower materials/ Girders directly from the GETCO's store.
The line materials that will be issued by the GETCO will be in “as is where is" condition at the
stores centre of the GETCO in that area during working hours of working days. The Contractor will
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
be fully responsible for any damage to or loss of all materials at any stage during transportation or
4.4.2 The Contractor has to open site store immediately nearby the line route and ensure for safe custody of
all the materials stored at his own cost.
4.5 WAY LEAVE, TREE CUTTING AND OTHER OBSTRUCTIONS:
4.5.1 The contractor will arrange for right of way and for tree clearance. Proposals in this connection
will have to be prepared and submitted by the Contractor well in time. It will also be necessary on
the part of contractor to instruct his labourers and staff to use minimum area while doing the work
where there are standing crops. No person of the contractor should pick any items from standing
crops or fruits. The contractor should take all possible steps to avoid or minimize damage to
standing crops, etc.
4.5.2 The contractor should immediately notify any obstructions or hindrance from local villagers or the
local authorities in the execution of the work to the concerned Engineer-in-Charge but should not
deal directly in the matter. The Engineer -in-Charge will arrange to remove the obstacles as soon
4.5.3 For the clearances, permissions, removal of obstructions in way leave etc. the Contractor shall not
remain contended by simply informing the GETCO, but shall invariably assist and arrange for
personal follow up to overcome the difficulties in the interest of progress of the work.
4.5.4 METHODOLOGY FOR COMPENSATION TOWARDS ROW: Methodology for compensation towards Right of
Way (ROW)/Way leave clearance/Tree crop damages etc during construction of this line will be
made as per GOG Tharav No. GET-11-2015/GOI-199-K Dated 01.03.2024.
4.6 ACCESS TO LOCATIONS:
4.6.1 It will be the Contractor’s sole responsibility to take the materials upto the location. Any path
way, temporary road, temporary bridge required will have to be provided by the Contractor at his
own cost.1f, for any reasons the above is not feasible, the Contractor at his own cost shall have to
arrange transportation by head loads.
The contractor will be deemed to be very well familiar with the route of the transmission line before
giving the offer. Notwithstanding the difficulties of terrain, location approaches, way leave and
other obstructions the price quoted for all the items of erection in the Schedule of Section-E-IV shall
not undergo any change at any stage or granted by the GETCO for any special rates/consideration.
SHORING, SHUTTERING AND DEWATERING:
The Contractor has to arrange for shoring, shuttering and dewatering work during activities of
excavation, stub setting and concreting. These shall be done at his own cost.
4.7 EXCAVATION FOR FOUNDATIONS:
4.7.1 On finalization of location, the Contractor shall make a trial pit on all four legs of tower having
width of 900 mm x 900 mm and depth according to following alternatives:
Alternative-I: If the rock is encountered within the depth of 1.5 mtr, the excavation of trial pit shall be
restricted to l.5 mtr. During such excavation, it should be ensured that the depth of rock
encountered shall meet with the concrete plug height of respective rock type foundation
design. Otherwise, the excavation depth be increased in such a manner that depth of rock
encountered shall meet the concrete block height of respective rock type foundation
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
design. The total depth of excavated pit shall be limited to 3.5 mtrs for adopting suitable
foundation design.
Alternative-II: When the rock is not encountered up to 3 / 3.5 mtr, the excavation shall be stopped and
depending upon the soil strata of excavated pits, the classification of foundation type to be
adopted be obtained.
4.7.2 After the excavation of all the four pits for the tower, as indicated in 3.7.1 above, the Engineer-in-
Charge of the work (Elect. & Civil) or Engineer nominated by the Chief Engineer (Proj), Head Office
shall examine the type of soil and foundation to be adopted for the particular location. For this
purpose, Contractor shall offer at least 10 (Ten) locations at a time. The decision given by the
Engineer-in-Charge of works (Elect. & Civil) or Engineer nominated by Chief Engineer (Proj) for
adopting type of foundation at particular location shall be binding to the Contractor.
4.7.3 After the decision of foundation type to be adopted, the excavation dimensions of trial pits shall be
increased to the respective approved foundation design, if required. For the excavation done in
excess of determined volumes (according to approved foundation design), the contractor has to fill
the extra excavation by 1:2:4 mix. concrete at his own cost.
4.7.4 The details of strata found during the trial excavation, decision about the foundation to be adopted
and the final actual excavation volumes shall then be recorded in the register to be maintained for
this purpose, with proper authentications of the engineers of the Contractor.
4.7.5 The payment of excavation will be limited to the volumes as per approved excavation drawings even
though the Contractor may excavate more for the sake of his own convenience or for any reasons.
If the excavated dimension/s is/are more than the dimension/s shown in the approved drawing,
the additional excavated volume should be filled in with 1:2:4 mixture concrete at Contractors cost
in respect of materials, labours etc.
4.7.6 In case of rock soil, the extra excavated rock portion on all sides shall be filled with 1:2:4 mix
concrete at his own cost in respect of materials, labours etc.
4.7.7 The rates indicated in schedule for excavation work in each soil shall be applicable to all the
locations as per actual condition of the soil strata irrespective of classification of type of
4.7.8 The rates for excavation indicated in schedule shall also be applicable for benching work, if
4.7.9 Definition of Soils:
The soil to be excavated for tower foundations are classified as under:
a) Normal dry Soil:
The soil readily removable with ordinary spades and shovels viz. murram / hard murram etc.
and to be used for location in normal dry cohesive or non-cohesive soils of any colour or
soil containing loose boulders.
b) Black Cotton Soil:
The clayey soil which can be removable with ordinary spades, shovels, pick, axes etc. and
swells when wet and shrinkes when dry, but not necessarily black in colour.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
The rock like hard gravel, kankar, limia stone, fissured rock and other types with similar
nature, which gets decomposed and can be quarried or split with crow bar or pick or axe.
The rock which can be removed by chieselling, drilling, blasting.
The normal / black cotton soil which contains more than 50 % sand OR complete sand.
The normal / black cotton soil having long standing surface water for more than 6 months
and with water penetration not exceeding one meter below ground level e.g. paddy field.
g) Submerged Soil:
The normal / black cotton soils met with sub soil water which requires dewatering.
Note: For rock, it may be ensured that it is the parent soil strata and not the isolated local boulders.
4.7.10 Guideline for adopting various types of foundations: (All dimension are in mm)
Layer depth from ground level in mm.
Sr. Type of foundation to
1. Normal Dry Soil (NDS) Dry B.C. G.L. 500 m.m.
NDS DBC 3500 m.m.
NDS G.L. 3500 m.m.
2. Partially Submerged Soil strata as at (1) / (5) but with soil water table available below 1500 m.m.
Normal (PSN) from G.L. to 3500 m.m.
3. Fully Submerged Normal Soil strata as at (1) / (5) but with soil water table available within 1500 m.m.
soil from G.L. to 3500 m.m.
4. Wet Normal Soil Soil strata as at (1) but surface water logged for more than 6 months and
(WNS) penetrating upto 1000 m.m from ground level.
5. Partially Dry Black DBC G.L. More than 500 m.m. &
Cotton upto 1500m.m.
6. Fully Dry Black Cotton DBC G.L. More than 1500 m.m.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Layer depth from ground level in mm.
Sr. Type of foundation to
(FDBC) and upto 3500 m.m.
7. Partially Submerged Partially Soil strata as at (6) but with sub soil water table available
Black Cotton m.m. from G.L. upto 3500 m.m.
8. Fully Submerged Black Soil strata as at (6) but with sub soil water table available within 1500 m.m.
Cotton from Ground Level upto 3500 m.m.
9. Wet Black Cotton Soil strata as at (5) or (6) but surface water logged for more than 6 months
and penetrating upto 1000 m.m. from ground Level.
10. Soft Rock (SR) Dry B.C. or NDS G.L. Rock
DBC/NDS layer at 1500 m.m. within
10(a) (within 3500m.m.
11. Hard Rock (H R) Dry B.C. or NDS G.L. Rock
DBC/NDS layer at 1500/within 3500m.m.
12. Sandy Dry B.C. or NDS Mixed with sand upto 3500 mm. (more than 50%
Sand Within 1500mm. 3500 m.m.
4.7.11 For very complicated soil strata other than indicated above like soft rock-cum submerged or hard rock-
cum-submerged, normal-clayee-sandy soil etc., the matter should be referred to Chief Engineer
(Trans) for decision regarding the type of foundation to be adopted, giving details of strata of soils
in all the four of the location along with proposal recommended. The proposal shall be submitted in
consultation with the Engineer-in- Charge (Civil & Electrical).
4.7.12 Precautionary Measures:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a. During excavation of rock (by chiseling or blasting or drilling) extra care should be taken, so that
excavation dimensions required for rock portion is maintained almost equal to but never less than
approved foundation design. The rock surface shall be as rough as possible for proper bondage
between rock and concrete. In case of extra excavation in rock, the same shall be filled with 1:2:4
mix concrete at Contractor's own cost i.e. the concrete shall be filled in the gap for the desired
height of the concrete plug. The Contractor shall arrange for required blasting materials at his own
cost and will be responsible for storage and use of such materials.
b. Whenever dewatering is necessary during excavation for smooth execution of the work, manual
dewatering will be resorted to in case of little water otherwise mechanical or power driven
dewatering shall be deployed at Contractors own cost.
c. In case of collapsible soil shoring and shuttering shall be provided by the Contractor at his own cost.
No extra charge shall be admissible for removal of collapsed soil in the pit.
d. Whenever necessary, the leveling of soil shall be done.
e. For shallow foundation, the stub shall bee cut to proper length at contractor’s own cost and record
shall be maintained for such locations in terms of cut lengths.
4.8 STUB SETTING:
4.8.1 The Contractor shall be fully responsible for correct setting of stubs in accordance with approved
methods of the exact locations and alignments and in precisely correct level. Stub-setting
templates to be supplied by the GETCO should be used for proper, setting of stubs.
4.8.2 The rates for stub setting are inclusive of cutting of stubs (if any), setting of stubs, levelling at correct
level, dismantling of template after concrete, back-filling etc. work.
4.8.3 Above rates shall be on per MT basis for normal, extensions upto 21 meters and special/river
crossing towers.
4.8.4 The weights payable for stub-setting item shall be comprising the weight of stub and its respective
stub setting template.
4.8.5 The Contractor shall invariably return the stub setting templates with bolt-nuts in good condition to
the GETCO on completion of foundation work. The templates shall be returned duly painted with
red oxide, if ungalvanised and marked with its number.
4.9.1 Form boxes made out of M.S. sheet for chimney and steps or pyramids shall be prepared by the
contractor as per approved foundation design, drawings at his own cost.
4.9.2 The cement required shall be arranged by the contractor from his own stock or by purchasing from
the market. (Please see the Special condition for use of cement).
4.9.3 The cement consumption for different types of concrete shall be considered as follows:
1:1.5:3 mix. – 8.2 Bags, per Cu. metre. (M 20)
1:2:4 mix. - 6.5 Bags, per Cu. metre. (M 15)
1:3:6 mix. - 4.5 Bags, per Cu. metre. (M 10)
4.9.4 The sand shall be of the best quality containing hard siliceous materials, clean and of sharp angular
grit type and free from earth or organic matter or salts and to the satisfaction of the Engineer-in-
Charge. The sand shall be washed before use. No saltish or brakish water shall be used for
4.9.5 The mixture of concrete to be used shall be such as to produce a sound, compact and water-proof
concrete. The mixture shall not be weaker than the ratio to be prepared. The stone metal shall not
be in size bigger than 40 m.m. The concrete for chimney shall be prepared with 20 mm stone metal
and the concrete for pyramid/step/pad shall be prepared with 20 mm or 40 mm stone metal. The
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
mixture shall be prepared using mixing machine only. It should also be free from grit and dirt. The
concrete shall be mixed as stiff as required for placing the concrete in the form of moulds with
ease and degree to which concrete resists segregation will permit. Hence, the quantity of water
used should not be too much.
4.9.6 Proper form or moulds adequately braced to retain proper shape while concreting, should be used
for chimney, pyramid and slab portions. Form boxes should be water tight so as not to allow
cement cream to come out leaving only sand and gully to form honey combs in concrete. Form
boxes should be cleaned and oiled before using for concreting.
4.9.7 All sub-merged locations must be kept completely dewatered both during the placing of concrete
and for 24 hours after completion. There should be no disturbance of concrete by water during this
4.9.8 Form boxes should not be removed before 24 hours, after concreting. Concrete surfaces where
required should be set right with rich cement and mortar after removal of the forms.
4.9.9 The Superintending Engineer (Trans), Bharuch or Engineer appointed by him at his sole desecration
may uncover any cast foundation to find out the workmanship of foundation. Contractor shall
render necessary assistance during such fact finding operation and shall comply with the report of
the investigating officer.
4.9.10 The tor steel bars required for RCC type foundation shall be procured by the contractor in advance
to avoid delay in the work.
4.9.11 The contractor will be responsible for constructing the foundations in accordance with the design
of each type of foundation supplied by the GETCO.
4.9.12 The rates indicated in schedule for concrete work shall be applicable to all the locations
irrespective of soil strata and type of foundation adopted.
4.9.13 The tor steel bars required for RCC type foundation shall be procured by the Contractor in advance
to avoid delay in the work.
4.9.14 The empty cement bag shall be retained by the Contractor.
4.9.15 No wastage is permitted for reinforcement steel as reinforcement steel is to be procured by the
contractor at his own cost. NO over lapping of RCC is permitted in foundation work.
4.9.16 The GETCO reserves right to test the quality of steel and cement procured by the contractor at any
Govt. recognized Laboratory and intended to be used for the tower foundation works. The test
results shall be binding to the Contractor.
4.10 CURING AND BACK-FILLING:
4.10.1 After 24 hours of pouring, the concrete should be cured by keeping it continuously wet for 14 days.
After 48 hours of pouring, the pit may be back filled with excavated selected earth (which is free
from grass, dung, wooden waste, postures and fodder woods, shrubs, thorn etc.) sprinkled with
necessary amount of water and well compressed and consolidated in layers not exceeding 150 mm.
If the excavated soil consists of large boulders/stone, the same shall be broken to maximum size of
80 mm and mixed with soil to be back filled. At the locations where borrowed earth is required for
back filling, this shall be done by the Contractor at his own cost, irrespective of transportation
from any lead. Thereafter, the exposed top end the fill shall be kept wet for the remainder of
above prescribed curing period. The uncovered portion of concrete chimney above the back filled
earth shall be kept wet by providing empty gunny bags fully wrapped around the concrete chimney
for curing and ensure that the bags are kept wet by frequent pouring of water on them.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.10.2 Extra ordinary care be taken during back-filling. The Contractor and The GETCO's Engineers at site
shall ensure that back-filling is done in the manner referred above, so that back-filled earth
becomes homogeneous with surrounding parent soil with the passage of the time.
4.10.3 The site engineer of the contractor shall record the day / date of curing, back-filling etc. and sign
in the register for its correctness along with The GETCO's representative.
4.10.4 The rates of stub setting are including the work of back filling of excavated pit. The large stones /
boulders shall be broken to maximum 80 mm size before used for back-filling at no extra cost to the
4.10.5 The quantity of excavated earth obtained from a particular location shall generally be utilized in
back filling work in tower footing of same location, unless it is unsuitable for such purpose. In the
later case, the back-filling shall be done with borrowed earth of suitable quality irrespective of lead
at no extra cost to the GETCO.
4.11 PROTECTION OF TOWER FOOTING:/ ‘H’ FRAME FOOTING.
4.11.1 The work shall include all necessary stone revetment, concreting and earth filling above ground
level and the clearance from stacking on the site of all surplus excavated soil, special measures for
protection of foundation close to or in nallas, river bed hilly/undulated terrain etc. by providing
suitable revetment. The top seal cover of the stone revetment shall be done with M150 concrete
(1:2:4 mix). The Contractor shall furnish in the profile itself the recommendations for providing
protection at these locations wherever required. However, the work shall be executed as per
approved drawings only.
4.11.2 The quantity of excavated earth obtained from a particular location shall generally be utilized in
back filling work in protection of tower footing of same location, unless it is unsuitable for such
purpose. In the later case, the back filling shall be done with borrowed earth of suitable quality
irrespective of lead and the consolidation of earth shall also be done free of cost.
4.11.3 Quantities of various protection work like stone revetment, concrete revetment, brick masonry and
random stone masonry to the foundations are to be executed by the successful contractor if
indicated in the schedule- B and payment for such quantity shall be as per unit rates accepted.
4.12 ERECTION OF TOWERS:
4.12.1 The super-structure of towers should be erected on foundations after 14 days of concreting.
However, the method adopted for erection of tower is left to the discretion of the contractor
subject to the condition that he takes responsibility for any damage to materials. No tower
member should get strained or bent during erection. The towers must be truly vertical after
erection and no straining would be allowed to bring it in alignment. Maximum tolerance in
verticality that will be permitted is ONE mm per 360mm of tower height. The bolt head shall be on
outside faces and nuts and washers on inside faces of the tower. All bolts & nuts shall be made
fully tight and finally the bolt threads shall be centre punched to avoid nuts getting loose.
Punching of bolts shall be made by chamfering the threads with centre punch atleast at three
places equally spaced on contact surface of bolts and nuts.
4.12.2 Complete tower erection shall include erection of all accessories like danger plate, number plate,
phase plate, C.I. Plate, Anti-climbing devices and fittings including attachments like step bolts,
ladders, platforms, 'U' bolts, shackles, hangers, strain plates etc.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.12.3 Suitable tower extension shall be erected to get desired ground clearance whenever required, as
determined at the time of survey and profiles.
4.12.4 To avoid pilferage of bolts and nuts and tower members, the bolts of the two bottom most panels
(say upto 10 meters) shall be tack welded at three places on the nuts diametrically. The zinc rich
paint shall be procured by the Contractor at his own cost and shall be applied immediately
following the tack welding.
4.12.5 The contractor shall arrange for all the equipments for tack-welding purpose. The rates shall be
inclusive of supply and application of zinc rich paint on it. The tack welding of nuts with bolts for
two bottom – most panels shall be carried as per the instruction of E.I.C.
4.13 GROUNDING:
4.13.1 It is necessary that in no case, tower footing resistance should be more than 10 Ohms during dry
weather. The Contractor shall arrange required equipments for measurement of soil and tower
footing resistance. The payment shall be released only after receipt of final soil resistance details
of providing earthing at each location.
4.13.2 After erection of towers, the Contractor shall measure the footing resistance of each location and
prepare the record for submission and approval of Engineer-in-Charge for deciding the type of
grounding to be provided.
4.13.3 Pipe Type Earthing:
At locations where footing resistance does not exceed 10 Ohms., the pipe type earthing as per
appended drawing shall be provided. The contractor will have to supply all the materials required
for grounding like pipe, flat, bolt- nuts, salt, fine broken coke/charcoal etc. The earthing is to be
done by making a bore hole for insertion of pipe away from the tower leg excavation line.
4.13.4 Counterpoise Earthing:
At locations, where footing resistance exceeds 10 Ohms, counterpoise earthing as per appended
drawing shall be provided to bring down the tower footing resistance below 10 Ohms. The
Contractor will have to supply all the materials required for grounding like lugs, G.I. wire, bolts,
nuts etc. The counterpoise earthing shall be burried 600 mm below ground level.
4.13.5 The method for providing earthing shall be at the desecration of the Contractor.
4.13.6 The record of footing resistance shall be maintained in consultation with Engineer-in-Charge before
and after providing of suitable earthing.
4.14 INSULATOR HOISTING ON TOWERS / ‘H’ FRAME:
4.14.1 Suspension insulator strings shall be used on all tangent type towers and tension insulator strings on
all small, medium, large angle and dead end type tension towers. Technical particulars of insulator
strings are appended herewith.
4.14.2 Insulators strings shall be assembled on ground. These shall be cleaned and examined for hair
cracks, chips or defective glazing (not exceeding half centimeter square) and then hoisted by
careful handling. The work will include fixings of all hardwares and fittings in their proper places
4.15 STRINGING ON TOWERS / ‘H’ FRAME:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.15.1 Before commencing of stringing work, contractor must obtain approval of sag tension charts (these
shall have to be supplied by the contractor) showing final sags and tension for various temperature
and spans. The stringing chart shall be prepared according to appended format only.
4.15.2 The Contractor shall be responsible and will take care of proper handling of drums from stores to
site. Sufficient numbers of aluminum snatch blocks shall be used for paving out the ACSR/AAA
Conductors. Necessary precautions shall be taken to avoid conductor rubbing on the ground by
providing adequate ground roller, rollers on supports. Additional rollers shall also be provided to
cross thorny hedges, footing and other obstructions to avoid scratching of conductor. The
conductor and ground wire shall be made to sag correctly as per stringing charts before they are
finally transferred to the hardwares for conductors and to clamps for ground wire. No joint should
be made at less than 30 metres from the tower end and no joint shall be permitted in Railway,
River, road and other important crossings spans. There shall not be more than one joint in a span of
each conductor. The sag The GETCO, if used shall be adjusted to suit the sag indicated against
actual temperature for an individual span. The thermometer shall be provided at the conductor
point during the stringing work. Dynamometers shall be used in tensioning the conductors. All
conductors shall be stressed to their maximum working load at the time of stringing, as per
approved stringing charts.
4.15.3 The minimum clearance between the lowest point of conductor and ground shall not be less than
required. All compression joints should be carefully made and a record of initial and final lengths
of the joints jointly signed by Contractor's and The GETCO's representatives should be maintained.
Check for sag should also be made at intervals when conductors are drawn up. Over stressing,
causing damage to towers should be avoided. Care should be exercised not to over tension the
conductor. An extra sag of 150 mm be allowed at all the important tension locations like
Railway/River Crossings.
4.15.4 After being pulled the conductor/ground wire shall not be allowed to hang in the stringing sheaves
for more than 72 hours, before being pulled to the specified sag. During the time the conductor /
ground wire is on the stringing sheaves before sagging-in, it shall be ensured that the conductor /
ground wire is not damaged due to wind, vibration, vehicles or other causes. Scaffolding should be
used to cross the important roads and Railway Crossing for minimum interruption to traffic.
4.15.5 The conductor shall be pulled upto desired sag and left in serial stringing sheaves for at least one
hour after which the sag shall be rechecked and adjusted, if necessary, before clipping in and
transferring the conductors from the serial stringing sheaves to the suspension clamps.
4.15.6 Conductor shall be clamped within 24 hours of sagging. The sag will be checked in the larger spans
of the section in case of sections upto eight spans and in one intermediate larger span also for
section with more than eight spans.
4.15.7 The stringing sheaves, when suspended on the transmission structure for sagging, shall be so
adjusted that the conductor will be on the sheaves at the same height as the suspension clamp to
which it is to be secured.
4.15.8 The stringing of the ground wire shall be done in accordance with the stringing charts approved by
the GETCO. The ground wire shall be strung to run continuously over the conductors. The ground
wire shall be pulled, sagged and clamped-in from tension tower to tension tower before the phase
conductors are pulled in that section.
4.15.9 All the line conductors shall be terminated at sub-station structures whose details shall be
furnished by the GETCO at the appropriate time. The contractor shall fix strain insulators on the
sub-station structures.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.15.10 Armour rods and vibration dampers shall be fitted at each suspension tower before final clamping
of conductor with Insulator strings. Vibration damper shall be fitted at each tension tower after
final clamping of conductor with insulator strings. Vibration dampers are to be fixed using
aluminium tape with each clamping bolt and in correct vertical position in relation to conductor.
Compression type joints are to be used for jointing of conductors. Each part connected with joints
shall be perfectly cleaned by wire brush and properly greased before final compression. All the
joints of conductors and earth wire shall be made in the best workmanship manner and shall be
perfectly straight and having maximum possible strength.
4.15.11 Proper guys shall be provided to counter balance the paving out tension of conductor/ ground wire
at the tension locations, to avoid damage to towers and/or accident.
4.15.12 Stringing work shall mean, the activities of fixing of insulator and insulator hardwares, paving, jointing,
tensioning, clamping with armour-rod, providing dampers, repairing of conductors (if any) and
fixing the conductor at tension hardwares etc. De-stringing work is the part of this contract. It
includes de-clamping of the existing conductor / earth wire grounding of insulator string earth
wire / conductor and depositing the same in the GETCO`s store.
4.15.13 The rates for any type of stringing work, out of followings are indicated in Schedule B.
o stringing of one / two ground wire/s,
o stringing of single / double circuit line with single bundle conductor/s,
o hot-line stringing of conductor,
4.15.14 The rates for stringing of conductors and ground wire for special crossings like river shall be on per
KM basis only and shall be paid according to actual work done. In case special towers are suspension
type the special shall mean major river crossing section considering the span from one anchor tower
to the other end anchor tower
4.15.15 The stringing work should be planned in such a manner in consultation with the Engineer in charge
of the work that minimum shut down of power line crossings are required. Revenue loss due to any
undue shut down i.e. after the shutdown is arranged and required to be extended on account of
contractor shall be recoverable from the contractor.
4.15.16 All members of dismantled tower and line materials shall be credited by the contractor to Const.
4.15.17 The empty steel drums of conductor and earth wire shall be returned by the contractor.
4.16 TOWER ACCOUNT
4.16.1 Within the month of completion of the foundation activity of the line all the stub setting templates
shall be returned / credited to the GETCO's store as per the instruction of the Engineer-in-incharge
of the works at no extra cost to the GETCO.
4.16.2 Within the month of completion tower erection activity of the line all surplus stubs / towers /
extensions including bolts, nuts and accessories etc. shall be returned / credited to the GETCO's
store including its proper stacking as per instruction of the Engineer- in-charge of the works at no
extra cost to the GETCO. If contractor fails to do so, cost of the surplus towers i extensions / stub
setting template including bob & nuts shall be deducted from the payable amount of this or any
other work executed by the contractor.
4.16.3 So far as the accounting of unused surplus towers is concerned, the same shall be done on the basis
of complete tower only and not on per MT basis. For shortage of any part (as per BOM) /Bolts-
Nuts/Accessories to complete the tower, recovery of complete full tower shall be made from
contractor’s bill.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.16.4 All the surplus towers as mentioned above shall be returned to the stores as per instruction of
Engineer-in-Charge of the works OR at the TOWER BANK situated at Bharuch within one month of
completion of towers erection. This includes unloading of tower material and stacking it as per
instruction of the Engineer- -in-Charge at no extra cost to the GETCO.
4.16 MATERIAL ACCOUNT:
4.17.1 On completion of the work, all surplus tower and line materials etc. and stub-templates shall be
returned by the contractor to the stores of the GETCO, as per the instructions of the Engineer-in-
charge of the works at no extra cost to the GETCO.
4.17.2 The contractor shall submit the complete materials account immediately after the work is completed
and in any case not later than 3 months from the date of completion or handing over of the line,
whichever is earlier.
4.18.1 The contractor shall make every effort to minimize the breakages, losses and wastages of line
materials/cement etc. supplied “Free of Cost” by the GETCO for line erection work.
4.18.2 The maximum ceiling for wastages permitted is as under:
Sr. No. Item % wastages permitted (Maximum)
i) Conductor and earth wire. ½% (for jumpering, sister wire & sag.)
ii) Conductor and earth wire. ½% (for credit as scrap of cut-piece length (from
Mtrs. Upto 30 Mtrs.)
iii) Conductor and earth wire. And 2% (for credit in pieces as good conductor from
Mtrs. to 30 Mtrs.)
iv) Bolt-nuts Nil (No extra bolts-nuts will be supplied).
v) Insulators ¼%
4.18.3 All the wastages are accountable except for items (i) of Clause No.2.24.2. The account of
permissible wastages shall be maintained at site in the registers as prescribed by the Engineer-in-
Charge of works, which will be subjected to periodical checking by purchasers authorized
representatives.
4.18.4 The account of wastages shall also be submitted on monthly basis (with running accounts bills) to
the Engineer-in-Charge of works as per Statement-B, Appendix-I of the specification. The copy of
R.A. Bill shall also be submitted to the concerned Executive. Engineer (Const).
4.18.5 The contractor has to return empty steel conductor and earth wire drum.
4.19 TESTING AND COMMISSIONING:
4.19.1 The Contractor after completion of erection work will ensure that all works connected with line
have been completed. These works shall be done correctly as per Indian Electricity Rules and
Procedures. Any extra cost involved due to incompleteness of work or bad workmanship found out
subsequently shall be set right forth with by the Contractor at his cost.
4.19.2 After the erection is completed in all respects, the line should be thoroughly patrolled and checked
for continuity and clearances. The line should be meggered to check its insulation level. Afterwards
a written confirmation should be given to the Engineer-in-Charge that the men, materials, tools
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
and earthings (if any) are removed and the line is safe for charging. On charging the line, if it does
not hold and trips, the contractor should arrange to patrol the line and find out the causes for the
tripping and rectify the defect at no extra cost to the GETCO.
4.20 HANDING OVER OF LINE DOCUMENTS:
4.20.1 On completion of all erection activities, the contractor has to furnish following informations along
with technical details to concerned Engineer-in-Charge of the work in triplicate duly bound: -
a. Approved surveyed route with permanent marks, (To be obtained from the GETCO)
b. Approved copy of profiles with tower schedule, (To be obtained from the GETCO except for
portion where any change is approved)
c. Location wise soil strata details of each pit excavated, type of foundation executed, volumes of
excavation & concrete and RCC steel weights,
d. Details of revetment, retaining walls, etc., work done for protection of tower footing and their
approved drawing copies,
e. Approved copies of stringing charts,
f. Value of tower footing resistance before & after providing earthing and type of earthing
g. Details of spans and phase where mid span joint, repair sleeve used,
h. Location wise type and numbers of insulators, insulator hardwares, earthwire hardwares,
conductor accessories, etc., provided,
i. Separate detail of each crossing like road, river, railway, power line, P&T Line, etc and details
of clearance as per Indian Electricity Rules.
4.21.1 The Contractor shall ensure that at the end of each sub-activity the surplus materials are
immediately removed from the work-site to avoid loss and injury to the public.
4.21.2 The Contractor has to return all surplus materials after reconciliation of material account in good
and useable condition and settle final bill including signature in all relevant papers required for
passing of final bill within three month from the date of charging / commissioning of line.
4.21.3 The contractor has to return empty Conductor / Earth wire Drums if it is Steel Drum. For wooden
Drums, contractor has not to return the empty Conductor/Earth wire Drums for the conductor/ E.W
used for this line.
4.21.4 If contractor does not complete the work in specified time with GETCO’s specification or leave the site
with incomplete work, GETCO will get the remaining work executed at the risk and cost of
4.21.5 If at any time, before the security deposit is refunded to the contractor, it shall appear to the
Executive Engineer or his subordinate in charge of the work that any work has been executed with
unsound, imperfect or unskillful workmanship or with materials of inferior quality or that any
materials or articles provided by him for the execution of the work are unsound or of an inferior
quality to that contracted for or are otherwise not in accordance with the contract, it shall be
lawful for Engineer-in-charge to intimate this fact in writing to the contractor and then no
withstanding the fact that the work, materials or articles complained of, may have been
inadvertently passed, certified and paid for, the contractor shall be bound forthwith to rectify or
remove and reconstruct the work so specified in whole or any part, as the case may require or if so
required shall remove the materials or articles so specified and provided other suitable materials
or articles at his own charge and cost, and in the event of his failing to do so within a period to be
specified by the Engineer-in-charge in the written intimation aforesaid the contractor shall be
liable to pay compensation at the rate of one percent on the amount of the estimate for every day,
not exceeding ten days during which the failure so continue and in the event of any such failure as
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
aforesaid the Engineer-in-charge may rectify or remove and re-execute the work or remove and
replace the materials or articles complained of, as the case may be, at the risk and expense in all
respects of contractor should the Engineer-in-charge consider that any such inferior work or
materials as described above may be accepted, or made use of, it shall be within his discretion to
accept the same as such reduced rates as he may fix thereof. Provided that in the case of any work
of which visible check is not possible, if the Engineer-in - charge or his subordinate in charge of the
work feels that such work has been executed with unsound, imperfect or unskillful workmanship or
with materials of inferior quality, he shall take sample tests at random, cost of which shall have to
be borne by the contractor and if after taking such test, part of such work is found to be defective
in any respect or to have been executed with materials of inferior quality, then the contractor
shall be paid for the whole work such amount as may be fixed by the office of the Engineer-in-
charge on the basis of the lowest quality of work found by him in such samples tests.
4.21.6 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete
work, GETCO will get the remaining work executed at the risk & cost of contractor.
4.22 PROGRESS REPORT:
4.22.1 Daily progress report in duplicate shall be regularly submitted to the Executive Engineer (Const),
with a copy to Supdt. Engineer (Trans). The Contractor shall also maintain register as per Schedule
of Section E-IV.
4.23 SITE VISIT:
4.23.1 The Engineer-in-Charge of the works or his representative will be free to visit the contractor's
works, their site stores and erection site and also verify the purchasers materials in the custody of
the contractor, as and when required.
4.24.1 The erection work will be covered under warranty period against any defect arising from erection
workmanship for a period of 18 months from the date of completion of line or 12 months from the
date of handing over of the line to the satisfaction of Superintending Engineer (Trans), at his sole
discretion, whichever is earlier.
4.25 QUANTITIES:
4.25.1 Quantities given in the Schedule-B are to be executed by the contractor at the rate accepted by the
GETCO in the A/T. In case of any deviation/tower quantity /type of tower/ length of line,
excavation/ concreting resulting in an increase in which event the field officer shall obtain prior
approval of the competent authority of GETCO and excess quantity shall be paid only at accepted
rate of the A/T.
Design / drawings for any other item to be executed, if required shall be prepared and submitted
to the GETCO for approval by the successful contractor at no extra cost to the GETCO and in time
to avoid delay in completion period. Payment for such Items executed shall be made on the basis
of quantities of approved designs and rates accepted in the A/T.
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
compensation and liability as per statutory requirement, contractor / agency shall be penalized as
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus GST as applicable
2 Above 1 Lac to 10 Lacs Rs.40000/- plus GST as applicable
3 10 to 100 Lacs Rs.100,000/- plus GST as applicable
4 > 100 Lacs 1.0 % plus GST as applicable
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of
fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site
in charge and supervisor. Safety document shall be handed over and vital safety norms and key points
of safety related to project shall be explained and recorded for commitment by erection contractor.
Such records are mandatory for clearing first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the following checks during
execution of work shall be covered.
3.21 Safety equipments available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.22 Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
3.24 If above-mentioned safety requirements found violated in any of the above three conditions shall
attract penalty of Rs.1000/- plus GST per occasion. (Max.Rs.3000/--for violation of three
conditions) During subsequent visit, if violation is found, then double penalty plus GST shall be
deducted from the bill of the Contractor/Agency.
Signature of Contractor Superintending Engineer (TR)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Safety Instruction for Contractors:
Following safety guidelines are mandatory for all contractors operating in GETCO premises /on transmission
lines for Electrical, non-electrical & civil works.
1. The contractors must provide advance planning of work to concerned in-charge of substation in writing.
2. The list of workers/ lab ours with name and address must be given to S/s In charge prior to
commencement of work by the contractor.
3. The copy of group insurance policy with list of name of workers covered.
4. The list of T&P and safety equipment (PPE) having tested and checked by GETCO officials at site.
5. The working procedure must be specified with timings of working hours indicating tea break & lunch
6. Before starting any work whether switch yard, on line or in colony “permit to allow to work” must be
taken from control room in-charge.
7. Utilizing Electrical/non- electrical equipments, safety rules must be implemented.
8. All workers /labour & supervisors must use safety equipments (PPE) during the work.
9. If the work is to be carried out on Sunday or public holiday the necessary permission must be taken in
advance, requesting in writing.
10. Unwanted person including children of labours will not be allowed at working site/ in the switchyard
and in the prohibited area.
11. Any electrical work or electrical connections to equipment for any other work must be carried out by
certified electrician/wiremen with adequate size of wire through MCB per I.E. Rule. Ensure that all
precautions are taken to prevent electrical accident & the installation /connection is certified by
Engineer in-charge.
12. No work should be done during night hours unless & until it is required under certain circumstances
with the approval next higher authority and all necessary arrangement of adequate lighting with safety
precautions is made.
13. Joint checking of line by In-charge, contractor & supervisor prior to commencement of work of any
electrical/non-electrical work.
14. Any power line crossing, river crossing & railway crossing or any other hazards must be discussed with
workers by contractor in presence of Engineer in-charge.
15. Contractors must submit list of workers with name, qualification and experience who are engaged for
line maintenance/rectification job.
16. Line clear permit must be taken on power line crossing or passing nearby for safety of workers. This
must be ensured by GETCO supervisor/in-charge of substation before starting the work.
17. Contractors must arrange for Shelter and drinking water facility for the labours /workers engaged with
the permission of S/s in charge.
18. The method of work, required T&P and manpower should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders.
19. Prior to execution of work a joint survey must be conducted by GETCO supervisor, contractor’s
supervisor and DISCOM line man in order to identity the following.
20. The contractor has to deploy minimum 8 to 10 skill labours/ fitters at site daily failing to which GETCO
shall deduct 1,000/- plus GST as applicable per day from the bill.
21. If the contractor fails to complete the job in stipulated time period, GETCO will get the remaining
work executed at the risk & cost of contractor.
22. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if
there is complaint against his misbehavior, misconduct or disloyalty towards job.
23. Terms and conditions regarding industrial laws and other related matters shall be complied by the
contractor in all respect.
24. The contractor shall ensure that all persons have provided safety tools, shoes, halmets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO
from time to time in concern with the safety and security as the work to be carried out.
25. If the Contractor defaults in execution of the orders placed or if COMPANY suffers any financial loss due
to this, then COMPANY will be forfeited Security Deposit, EMD plus GST as applicable from other orders
of the same firm or by encasing the Bank Guarantee.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
26. If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete
work, GETCO will get the remaining work executed at the risk & cost of contractor.
Following material will be supplied by GETCO “free of cost” for Bi- Annual Rate Contract for restoration
of various 66kV Class Transmission lines, damaged due to natural calamity / any other abnormality
under various transmission divisions of Bharuch Circle.
1) Towers, stubs, templates, tower accessories, bolts-nuts, H-frame DP Structure, H-frame DP Structure
Accessories Stay Sets, Stay wire etc.
2) Conductor, conductor accessories, earth wire, earth wire accessories.
3) Insulators, insulator hardwares, G I strip size 75 x 10 mm & 50 x6 mm /MS round bars size 20/25/32/40
mm dia. Except vertical 3.0 mtr long electrodes 66 KV /11KV/LT equipments with accessories and control
and relay panels.
4) 110 Volt, 100 AH DC battery sets and battery chargers.
5) Various sizes of armored control cables and LT control cables.
6) PLCC equipments and PLCC panels.
Following materials / equipments will be procured / arranged by the contractor for erection of transmission
1) Tools tackles required for erection activities and stringing.
2) Earthing materials, CI frame & cover, cement as per IS –8112, sand, gravel, bricks, bolts-nuts with
washers, number plates, painted plates etc. Vertical 3.0 mtr long electrodes
3) Maintenance free earth electrodes & back fill compound
4) Filter machine, hydraulic crane and hydraulic jointing machine/welding machines.
5) Barbed wire.
6) Zinc rich paint for bolt-nuts welded portion
7) Various plates namely DP / NP / PP / CIP.
8) Other materials and tools-tackles required for erection activities like survey, foundations, tower
erection and stringing.
9) Tor steel bars required for reinforcement.
10) Nuts/Bolts required for H-frame DP Structure.
11) Boring machine and other tool required for bore type earthing for DP Structure
SUB-Station Equipment/Material will be issued from following Store Centres:
Sr. Store Centers for issue of S/s+line
No. materials/equipments.
Bi- Annual Rate Contract for restoration of various 66kV
Class Transmission lines, damaged due to natural
1 Bharuch/Haldarva
calamity / any other abnormality under various
transmission divisions of Bharuch Circle.
Note: Generally, all required materials will be issued form above store centre’s of GETCO. In case of non-
availability of some items, contractor shall have to collect from other nearby store centers without extra
cost to the Board.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers shall
submit the information in the Format detailed here under]
Sr. Name of Work in hand Work Tender for Remarks
Tender Cost of Anticipated Estimated Date when Stipulated
Cost Remaining Date of Cost decision Date or
work Completion Is
Contractor’s Representative legible signature: ______________________
Seal of the company Date & place: _______________________________________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Details Capacity Numbers Make Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE TENDER.
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding in
representative of firm company.
who has visited the site.
Contractor’s Representative legible signature: ______________________
Seal of the company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
Class – with valid up to
Partnership deed/Proprietor (Notarized
4 Power of Attorney (Notarized copy)
Bl. Sheet / P&L A/C, Statement of last
Rs. Lacs issued by Bank, branch
6 Latest Solvency certificate.
7 GST Registration No.
9 Valid Electrical Contactor License
Signature of Tenderer Company’s Round Seal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Qualification Requirement.Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening of
the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may
be], along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
FINANCIAL CAPABILITY
Sr. No. Details Amount Rs. In lacs Remarks
1. Solvency A scheduled Banker’s Certificate of
present solvency be attached.
2. Annual turnover for last five
3. Price of the biggest job
Signature of Authorized Representative
Company / Agency
Name of tendering
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ON RECENT STAMP PAPER OF RS. 300/-
The Superintending Engineer BG. No. :
Gujarat Energy Transmission Corporation Ltd Issue Date:
Transmission Circle Office, Expiry Date :
Maktampur, Amount :
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution Period and Guarantee /
Warranty Period as per Commercial Terms and Condition of Tender]
We, _______________________________________ (Name of the Bank and Address of the Branch
giving the Bank Guarantee) having our registered office at _________ (Address of Bank’s
Registered office) hereby give this Bank Guarantee Number __________ dated ________ and
hereby agree unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat Energy Transmission Corporation Limited, or any Officer authorized by it in this behalf any
amount up to and not exceeding Rs._____________ (Amount of combined Performance Guarantees
towards Execution / Supply Period and Guarantee / Warranty Period) (Rupees _______ (in words)
to the said Gujarat Energy Transmission Corporation Limited, on behalf of
M/s________________________________ who have entered into a contract for the supply/works
specified below :
This agreement shall be valid and binding on this Bank upto and inclusive of ____________ (Date
of validity of the Bank Guarantee) and shall not be terminable by notice or by change in the
constitution of the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or
variation or alteration made, given conceded or agreed, with or without our knowledge or
consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the Gujarat Energy Transmission
Corporation Limited. Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs._____________. (Rupees _________________________________ only). Our
guarantee shall remain in force until ___________ (Date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before ___________
(Date of validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee shall
be forfeited and we shall be released and discharged from all liabilities there under:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Please Mention here Complete Postal Address of the Signature of the Bank’s Authorized
Bank with Branch Code, Telephone and Fax Nos. Signatory with Official Round Seal
NAME OF DESIGNATED BANKS:
Note: The banks shall be the Banks recognized / notified by the Finance
Department, Government of Gujarat (GoG) from time to time
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. Bank Guarantee number and date to be written on every page of Bank Guarantee & its
2. If B/G amount is more than Rs. 50,000/-, kindly take sign of Two Bank Officer with their
respective Employee Code No.
3. Valid confirmation letter of the concerned Bank in an approved format should be attached with
every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be
beyond six months, in any case.
5. Round seal and signature of two Bank Officers with name & sign code should be affixed on
every B/G paper.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
PROFORMA FOR AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
CONTRACT AGREEMENT
THIS AGREEMENT is made at BHARUCH the_____________ day of ___________ in the Christian
Year two thousand ___________ between M/s._____________________________________
(address of office) ________________ (hereinafter referred to as “THECONTRACTOR” which
expression shall unless excluded by or repugnant to the context include its successors or
permitted assigns) of the ONE PART and the Gujarat Energy Transmission Corporation Ltd,
having their Head office at Race Course, Baroda 390 007 (hereinafter called “The GETCO”
which expression shall unless excluded by or repugnant to the context include its successors or
assigns) of the SECOND PART.
WHEREAS the aforesaid The GETCO has accepted the tender of the aforesaid contractor for
“the works” and more particularly described and enumerated or referred to in the
specification, terms and conditions prescribed in the order letter, covering letter and other
letters and schedule of price which for the purpose of identification have been signed by Shri
____________________________________ (authorised signatory) on behalf of the contractors
and by the Supt. Engineer (Trans), Gujarat Energy Transmission Corporation Ltd, Bharuch on
behalf of the GETCO, a list whereof is made out in the Schedule hereunder written and all of
which said documents are deemed to form part of this contract and included in the expression
“The works” wherever herein used, upon the terms and subject to the conditions hereinafter
AND WHEREAS the GETCO has accepted the tender of contractors for the work of
____________________________________________) upon the terms and subject to the
conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT
The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or therefrom respectively or are reasonably necessary
for the completion of the works as mentioned and at the times, in the manner and subject to
the terms and conditions and stipulations contained in this contract, and in consideration of
the due provision, executions, erection and completion of the works agreed to by the
contractor as aforesaid the GETCO doth hereby covenant with the contractor to pay all the
sums of moneys as and when they become due and payable to the contractors under the
provisions of the contract. Such payment to be made at such times and in such manner as is
provided by the contract.
The conditions and covenants stipulated here-in-before in this contract are subject to and
without prejudice to the rights of the GETCO to enforce penalty for delays and / or any other
rights whatsoever including the right to reject and cancel on default or breach by the
contractor of the conditions and the covenants as stipulated in the general conditions,
specifications, forms or tender schedule etc. attached with The GETCO’s Order No.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
The contract value, extent of works, completion dates, specifications and other relevant
matters may be altered by mutual agreement and if so altered shall not be deemed or
construed to mean or apply to affect or alter other terms and conditions of the contract and
the general conditions and the contract so altered or revised shall be and shall always be
deemed to have been subject to and without prejudice to said stipulation.
List of documents forming part of the contract :
The GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated
The GETCO’s order No. Dtd. _____ / ______/
Contractor’s acceptance of order vide letter No. _______________.
Contractor’s Partnership Deed dtd. ________________.
Contractor’s Power of Attorney / The GETCO Resolution authorising person to sign on behalf of
In witness whereof the parties hereto have set their hands and seals this day and month, year
first above written.
Signed, sealed and delivered by
For and behalf of M/s. __________________ (Signature)
In the presence of (Name And Address)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd Circle office. Bharuch.
In the presence of name, Full address and Signature:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(Non Judicial Stamp Paper of Rs. 300/-)
KNOW ALL MEN BY THESE PRESENTS that we, Messers ___________________
_____________________________________________________ (hereinafter called “the Contractor” which
expression shall, where the context so admits, include their heirs, executors, administrators and legal
representatives, successors and permitted assigns) are hereby held and firmly bind unto the Gujarat
Energy Transmission Corporation Ltd (hereinafter called “the GETCO” which expression shall, where the
context so admits, include its successors and assigns) to refund the full amount of steel cement and other
materials supplied by the GETCO under the terms and conditions of A/T No. _________________
________________________________________ dated ________________ against any loss damage or
deterioration of whatsoever nature occurs to said materials supplied by the GETCO and which are in the
custody of the contractor at their works site, on behalf of the GETCO, at ____________ (name of line)
_______________ and / or if any of the said materials, when inspected by any officer authorised by the
GETCO in this behalf, is found to be damaged, lost, deteriorated in quality or quantity, the contractor
hereby agrees to bind himself to indemnity and at all times keep indemnified the GETCO against all loss,
damage and deterioration to the cement, steel or any material supplied by the GETCO during his custody
and shall pay in cash on demand from the GETCO within 30 days the market value of such materials which
is lost, damaged or deteriorated in full to the GETCO and shall also hereby authorize the GETCO to deduct
the said sum from any sum due to the contractor or any sum which may at any time become due to the
contractor under the above referred contract or any other contract entered into by the contractor with
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and
preservation of the said materials against all risks, excluding war risks and against loss, damage and
deterioration of whatsoever nature in respect of the said materials while it remains in the custody and
possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorised by the
Now the conditions of the above written bond are such that the contractor shall pay the full amount
forthwith to the GETCO in the event of loss, damage or deterioration or whatsoever except due to
circumstances arising out of war in respect of the materials supplied by the GETCO and shall fully and
effectually indemnify and keep indemnified to the GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorised by
the GETCO and produce at anytime when demanded.
THE WITNESS WHERE OF : We the
(Signature of contractor)
hereto signed at ___________________
In the presence of
address ______________ (Signature)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
address ______________ (Signature)
MATERIAL ACCOUNT
(STATEMENT TO BE ATTACHED WITH MONTHLY RUNNING ACCOUNT BILLS)
1) Statement giving item wise details of monthly receipt of line material from GETCO and consumption for
erection of Substation for the Month of _____________________.
Sr. Items Prov. Receipt of Material from Consumption of Material Actual Balance quantity
No. Requ- GETCO in Line wastage of material in
Qty. Qty. Qty. Qty. Qty. Qty.
rcvd. rcvd. rcvd. utilise utilised utilised
Upto This Till d this till this
last month this upto month month
month month last
Signature of Authorized Representative
Company / Agency
Name of tendering Company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Format for LOI Letter of Acceptance
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Bharuch
Bharuch –392012
Sub: Latter of acceptance of LOI
We hereby agree, admit and acknowledge the receipt of your above referred Acceptance of Tender
for the “Bi- Annual Rate Contract for restoration of various 66kV Class Transmission lines,
damaged due to natural calamity / any other abnormality under various transmission divisions of
Bharuch Circle.” We hereby further agree to all the terms and conditions mentioned in the tender,
LOI and A/T unconditionally.
Yours faithfully,
(Authorized Signature)
Designation _________________
(Official Stamp)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
AT ACCEPTANCE LETTER:-
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
Ref. No. Dat e:
Superintending Engineer
Gujarat Energy Transmission Corporation Ltd
Circle Office, Bharuch
Sub: A/T acceptance letter
We hereby acknowledge, agree and accept your Tender No.____________________ and letter of
No._________________________ and Work order no. under reference above with terms and
mentioned therein for the “Bi- Annual Rate Contract for restoration of various 66kV Class
Transmission lines, damaged due to natural calamity / any other abnormality under various
transmission divisions of Bharuch Circle..”
Designation _________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Application for refund of EMD
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
The Superintending Engineer (TR)
Transmission Circle
GETCO__________
Sub: - Application for refund of EMD
I request your good self to refund my EMD for the tender mentioned below as soon as the price bids
are opened and if I/We am/are not the L1 for the same. The details are as under.
Name of Work Sub-etc.
EMD) RTGS/NEFT No., Date & Name of
Bank detail for RTGS intowhich EMD is required to
Faithfully yours,
(Name & Seal of Bidder)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered in an
atmosphere of trust and respect between providers of goods and services and their users for the ultimate
benefit of society as the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution of
works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are identified.
Indoor safety precaution Outdoor safety Indoor safety precaution Outdoor safety
precaution precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO supervisor, should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders. contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment. supervisor and DISCOM line man in order to identify
Clearly identify the work location, to distinguish
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
Disconnect equipment from supply. b. Isolation point of each line crossing.
Protect against other live parts. c. Each line crossing & isolation point under each span
must be discussed and noted in
Take special precautions when close to bare
conductors / Bus bar. maintenance register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor must
contractors operating in GETCO premises for ensure all isolations physically with adequate earthing
Electrical, non-electrical & civil works. technically prior to give clearance to gang leader for
1. The contractors must provide advance planning of
work to concerned in-charge of substation in writing. While execution of stringing work, the identified line
crossing must be isolated / de-energized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned DISCOM
“permit to allow to work” must be taken from control supervisor.
room in-charge.
The isolation of Tap line must be physically seen and
3. Utilizing Electrical / non-electrical equipments, verified by Contractor and GETCO supervisor.
safety rules must be implemented.
At D.O. fuse junction contractor’s person should be
4. If the work is to be carried out on Sunday or public posted to ensure that no person restore D.O. supply
holiday, the necessary permission must be taken in while work is under execution Contractor’s supervisor
advance, requesting in writing. must ensure that concern officer take LCP for EHV
line and power line crossing.
5. Unwanted person including children of labors will
not be allowed at working site/ in the switchyard and
in the prohibited area.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
6. Any electrical work or electrical connections to
equipment for any other work must be carried out by
certified electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
o Live penal area / bus bar must be isolated and
sealed / bifurcated with red color tape for visible
O Display Board must hang on LCP panel.
o Transformer must be switched off whenever and
wherever contractor and line workers are not satisfied
with isolation, earthing or any equipment performance
of GETCO, it will be pointed out and work shall begin
only after resolution. Contractor shall not take up job
in absence of GETCO authorized person.
All wire temporary connection & material never
erection activity has any connection and disconnection
work of busbar, string bus.
All workers / labor of contractor & supervisors must All workers/labour of contractor & supervisors must
use personal protective equipment (PPE) during the use personal protective equipment (PPE) during the
work like gloves, safety belt, Safety shoes, Helmet, work like gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by GETCO. earthing rods, Live line detector etc, duly approved
The local earthing must be done at the place of work The local earthing must be done at the place of work
before execution of any work. before execution of any work.
11 kV breakers in panel must be switched off and Circuit breaker opening is not isolation and isolator on
racked out only after ensuring no voltage in breaker either side must be opened. No work during rains and
and without door opening. cloudy weather condition.
Transmission line activities.
1) Used of Voltage detector to ensure outage.
2) Earthing at three points, local, left & right side of
bus bar / string bus.
3) Match line color code with color of wrist band.
Local earthing of electrical equipments like filter
M/c, welding machine, testing kits etc. is must.
Crane shall only be used for material handling and
erection. Working platform shall only be used for
work in switchyard.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-113 Tender Bharuch.pdf
Download all tender documents and submit your bid