Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 4F 15 OLIVER HOUSE NEW POWER HOUSE ROAD JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Techno- Commercial not accepted |
Tender Value
Refer Docs
Closing Date
25 Feb 2021, 10:00 amClosed
PARAU MURMU
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Value based biennial Rate Contract For Conveyor Belt Vulcanizing And Pulley Rubber Lagging Jobs In All Plants At Rcf Trombay Unit.
2021_RCFL_615834_1
ET-MES/610/L/2021/228
Open Tender
Miscellaneous Services
Item Rate
730 days
MES DEPT ROOM NO 25 ADMIN
AS PER NIT
12 documents required · 12 mandatory
₹0
Exempted
19 Apr 2021
11 Feb 2021
25 Feb 2021
11 Feb 2021
25 Feb 2021
11 Feb 2021
Amount
Belt joining by cold vulcanizing process per mm width of the belt, irrespective of the number of piles (3-5 ply) including tightening, loosening& centering of the conveyor belts.
Belt joining by Hot vulcanizing process per mm width of the belt, irrespective of the number of piles (3-5 ply) including tightening, loosening& centering of the conveyor belts.
Joining of conveyor belt by mechanical clips (clips will be supplied by RCF), including conveyor belts tightening, loosening & centering, as per SOW
up to 400 mm width belt
450 to 800 mm width belt
850 to 1200 mm width belt
1250 to 1400 mm width belt
Mounting of belt
up to 100 meter length
101 to 150 meter length
151 to 200 meter length
201 to 300 meter length
Above 301 meter length
Conveyor belt cutting / trimming
Reversing of conveyor belts
Spot repair of conveyor belts by vulcanizing process
Removing of off center of running conveyor belt by adjusting idlers / pulleys / take up etc.
Rubber lagging of pulleys / idlers, 'in-situ' with contractor's material and labour , by cold vulcanizing with minimum 12 mm thick Diamond cut natural rubber sheets
Minimum payment clause (Not considered for Price evaluation )
Minimum payment clause: Contractor shall engage the existing 5 (Five) contract labours as per the “Important note” given in annexure-IIA. For this a minimum monthly payment is assured by way of job or direct payment. i.e. if the average billing amount or the job quantum is less than the assured minimum monthly payment, then the short fall shall be paid to contractor after yearly reconciliation at the end of the year.
OLIVER RUBBER INDUSTRIES LLP
BELT INDIA CONVEYOR SERVICE
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .