Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance FLAT NO C 401 LORD KRISHNA GREEN OPPOSITE DOON SCHOLAR SCHOOL KEDARPUR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.6 L
Closing Date
29 Nov 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (ENGINEER PARK) SURATGARH
GE (Engineer Park) Suratgarh Near MES Gate Suratgarh Military Station Suratgarh-335804
Preservation / Repair of ATW CL-12 at Suratgarh under GE (Engr Park) Suratgarh
2021_MES_487442_1
3004/QTN/17/E3 of 2021-22
Open Tender
Miscellaneous Services
Lump-sum
suratgarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
30 Nov 2021
10 Nov 2021
30 Nov 2021
11 Nov 2021
29 Nov 2021
12 Nov 2021
60 days
1. Preservation / Repair of Clamp & Link Assembly and Reel Strapping Coil (ATW CL-12 - 4928 Nos (Maintenance – 4902 Nos & Repair and Maintain– 26 Nos):- (a) Removing the ATW CL-12 roll from existing stack to the required site of work (approximate distance 40 to 100 Mtr away). (b) Removing of reel strapping coil and clamp & link assembly by de-coiling the rolls. (c) Repair and straighten the aluminium planks by hammering to bring it to its original shape and welding to be done to the broken reel strapping coil & clamp link Assembly. (d) Cleaning the reel strapping coil and clamp & link assembly with cotton waste, steel wire brush, emery paper to make it free from rust and dust. (e) After cleaning, painting with one coat of Paint OG 100 ml/Reel Strapping coil and 20ml/Clamp and link assembly. (Make: Nerolac Goody Synthetic Enamel/Berger Group ‘C’) and turpentine oil 24 ml per Roll. (f) After preservation re-coiling the same in rolls and fixing of clamp & link assembly and wing nut etc as per directions on ground. (g) Shifting and re-stacking the roll on proper dunnage of existing plinth as directed by BSO/GE. Note: - All materials, tools, mechanical and transportation required for work will be supplied/provided by the contractors/suppliers.
HARDIK ENTERPRISES
ANSH ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .