Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Physical submission not done. Hence non responsive to open financial bid. |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
26 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, NH Division, PWD, Srinagar (Garhwal)
Reconstruction of Damaged Retaining and Breast wall on NH 707 A under Emergency Repair at Km 263 HM 8 10
2025_MoRTH_878325_1
1397/2AC dt. 16.09.2025
Open Tender
Civil Works - Roads
Item Rate
60 days
Srinagar Garhwal Uttarakhand
Please refer Tender documents.
1 document required · 1 mandatory
₹2,000
www.bharatkosh.gov.in
₹47,000
27 Sept 2025
20 Sept 2025
27 Sept 2025
20 Sept 2025
26 Sept 2025
20 Sept 2025
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary soil Manual Means Depth upto 3 m
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Random Rubble Masonry
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Construction of Rock fill Embankment with all lifts and lead upto 5 Km- Construction of rock fill embankment from roadway excavation with broken hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top layer with granular material, rolled with vibratory road roller, all complete as per clause 313.
Granular Sub-base with Graded Material (Table:- 400-1) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading- I Material
Wet Mix Macadam laying using by Grader (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Tack Coat on Granular surfaces treated with primer ( Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.)
Dense Graded Bituminous Macadam-I (Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects)
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.]
Bituminous Concrete Grading -II (Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 With Batching Plant, Transit Mixer and Manual placing
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M25 With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as perdrawing and technical specifications
stage.html
html • 0.02 MB
finance_923228.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .