Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 CrAdmitted-Finance 112 FIRST FLOOR NAVAYUG MARKET GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | -16.85% | ₹6.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.9 CrAdmitted-Finance H NO 146 SADULLAPUR SECTOR KP V BAIDPURA GREATER NOIDA G B NAGAR U P | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | -15.32% | ₹6.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.9 CrAdmitted-Finance | -15.15% | ₹6.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹7.9 CrAdmitted-Finance | -2.88% | ₹7.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹8.0 CrAdmitted-Finance | -2.00% | ₹8.0 Cr | L5 | Admitted-Finance |
Tender Value
₹8.2 Cr
EMD Value
₹16.4 L
Closing Date
20 Apr 2026, 5:00 pmClosed
GENERAL MANAGER CIVIL
sec 6 noida
M/o Road (Development of Road, Footpath and Drain From Sector-47 And 48 Redlight to Sector-107 and 100 Redlight on Vodamahadev Road) Noida.
2026_NOIDA_1134215_1
65/NOIDA/GM/SM-WC-03/2025-26
Open Tender
Civil Works - Others
360 days
noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹16.4 L
13 May 2026
7 Apr 2026
21 Apr 2026
7 Apr 2026
20 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar ,DSR-2018/Item no. 15.7.4 | - | Cum | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) DSR 18/I.No. 4.1.8/P- | - | Cum | - | - |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form work for. Foundation, footings, bases of Columns etc for mass concrete. | - | Sqm | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo Mechanically Treated bars of grade Fo_500D or more. Iten No.-5.22.6 | - | Kg | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access, platform DSR 18/I.No. 5.9.3/P- | - | Sqm | - | - |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level | - | Cum | - | - |
| 9 | Providing , hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in shelves, including setting in cement mortar 1:3 ( 1 cement : 3 coarse sand),cost of required centering shuttering and finishing with neat cement punnig on exposed surface but , excluding the cost of reinforcement, with 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone -III ) : 3 graded stone aggregate 20 mm nominal size ) DSR I.NO. 5.16 | - | Cum | 13,895.7 | - |
| 10 | Hiring of Diesel engine (Including Cost of Diesel, Lubricant & Operator) | - | hrs | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TD.pdf
Tender Documents • 5.43 MB
BOQ_2117318.xls
BOQ • 0.27 MB
C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid