| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.0 L+₹98,839.94 (5.19%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹20.5 L+₹1.5 L (7.65%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹23.9 L
EMD Value
₹50,000
Closing Date
7 Oct 2023, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer pazhassi Project Division No 2 Kannur 670002
GENERAL Main canal PyIP Providing lining in Main canal between ch 12 100km and 12 250km at Kara for the year 2023 24 General Civil Work
2023_Irrig_607928_2
IRR/PI/TR/3701/2022_5_19_19/1
Open Tender
Civil Works - Canal
Item Rate
365 days
Kara
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
24 Nov 2023
29 Sept 2023
11 Oct 2023
29 Sept 2023
7 Oct 2023
29 Sept 2023
Amount
Canal lining
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
OD32602/2022-2023:Laterite roughly dressed stones of size 30 x 20 x 20 cm laid dry pitching including cost and conveyance of all materials and all labour harges etc complete.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD32608/2022-2023: Filling expansion joints with approved joint board 12mm thick giving 25mmx22mm size gap or exposed faces for sealing, including cost and conveyance of all materials and labour charges etc complete
OD32609/2022-2023: Sealing the expansion joint using approved quality sealing compound at gaps (25mmx22mm) already provided at the face of the expansion joint after cleaning the gaps thoroughly including cost and conveyance of all materials and all labour charges for heating the compound, pouring, finishing etc complete
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
Rectification of Foot bridge
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Suresh Karakkat
SIBIN.T.K.
Bidder Name
VINODAN.P
SIBIN.T.K.
Suresh Karakkat
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_906882.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .