| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC MOHALLA LUHARI SARAI NAGINA DISTRICT BIJNOR UTTAR PRADESH | NAGINA | BIJNOR | UTTAR PRADESH | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 CrRejected-Finance TATARPUR LALU A 2 ADESH NAGAR NAJIBABAD BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹1.5 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.5 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.5 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.7 CrRejected-Finance | ₹1.7 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L4 | Harjinder Singh narwal L5 | LAIQUE AHMAD L1 | MS ROAD LINES INDIA PVT LTD L7 | RAJ PAL SINGH CONTRACTOR L6 | ATUL KUMAR GUPTA L3 | ARUN SINGH L8 | SURYASONS REALTORS LLP L9 | M/s MAHAKAAL ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting embeded portion / trench digging including lift upto 1.50 M. and lead upto 30.00 M including cost of driver, POL, maintenance of mechine, Contractor profit, labour, material and T&P with all taxes etc. But excluding cost of leveling dressing, and compection. Required for proper completion of work as per direction of Engineer-in-charge. (But excluding cost of G.S.T) | 14,757 | cum | 40 ₹5.9 L | 31.54 ₹4.7 L | 26 ₹3.8 L | 34.43 ₹5.1 L | 40 ₹5.9 L | 25 ₹3.7 L | 38.45 ₹5.7 L | 38.77 ₹5.7 L | 21 ₹3.1 L |
| 2.00 | Earth work in covering of geo bag on bank slope and daula including lift upto 1.50 M. and lead upto 30.00 M including cost of driver, POL, maintenance of mechine, Contractor profit, labour, material and T&P with all taxes etc. But excluding cost of leveling dressing, and compection. Required for proper completion of work as per direction of Engineer-in-charge. (But excluding cost of G.S.T) | 1,662 | cum | 100 ₹1.7 L | 31.54 ₹52,419.48 | 26 ₹43,212 | 34.43 ₹57,222.66 | 100 ₹1.7 L | 25 ₹41,550 | 38.45 ₹63,903.90 | 38.77 ₹64,435.74 | 21 ₹34,902 |
| 3.00 | Supplying ,laying and placing of 9mm, 4 strands Polypropelene Rope Gabion size ( 1.8m x 1.8m x 0.5m) with lid only, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) filled with local sand /earth in geotextile bags size (1.00mx0.75m) or (1.09mx0.69m),fabricated from Engineered Textile" manufactured from 100% PP multifilament yarn by machine in cross direction,woven into stable network such that the yarn retains their relative position.The fabric used for bags shall be (200 GSM)TFI 1200 or equivalent and meet the criteria given under tech. spec. and have high UV resistance, inert to biological degradation and resistant to naturally encountered chemicals like acids and alkalies, including contractors‘ profit but excluding all taxes etc. required for proper completion of work as per direction of engineer-in charge. (But excluding cost of GST.) | 8,098 | cum | 1,700 ₹1.4 Cr | 1,995.31 ₹1.6 Cr | 1,639 ₹1.3 Cr | 2,178.44 ₹1.8 Cr | 2,000 ₹1.6 Cr | 1,747 ₹1.4 Cr | 2,432.64 ₹2.0 Cr | 2,453.14 ₹2.0 Cr | 1,750 ₹1.4 Cr |
| 4.00 | Supply and laying of non-woven Geotextile sheet of 200 G S M made of polypropylene staple fibre.Including Contractor profit, T&P, all taxes etc. Required for proper completion of work as per direction of Engineer-in-Charge (But Excluding Cost of G.S.T.) | 3,981 | Sqm | 80 ₹3.2 L | 45.99 ₹1.8 L | 37 ₹1.5 L | 50.21 ₹2.0 L | 100 ₹4.0 L | 40 ₹1.6 L | 56.07 ₹2.2 L | 56.54 ₹2.3 L | 50 ₹2.0 L |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
16 Mar 2026, 2:00 pmClosed
SE
SE Flood Circle Lakhimpur Kheri
Anti-erosion work for the protection of village Pyas Gautiya etc. village group situated on the right bank of Devha river in Pilibhit district.
2026_UPIDC_1122699_15
03/SE/2025-26
Open Tender
Civil Works
90 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹4.6 L
Lakhimpur
23 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
10 Mar 2026
Earth work in cutting embeded portion / trench digging including lift upto 1.50 M. and lead upto 30.00 M including cost of driver, POL, maintenance of mechine, Contractor profit, labour, material and T&P with all taxes etc. But excluding cost of leveling dressing, and compection. Required for proper completion of work as per direction of Engineer-in-charge. (But excluding cost of G.S.T)
Earth work in covering of geo bag on bank slope and daula including lift upto 1.50 M. and lead upto 30.00 M including cost of driver, POL, maintenance of mechine, Contractor profit, labour, material and T&P with all taxes etc. But excluding cost of leveling dressing, and compection. Required for proper completion of work as per direction of Engineer-in-charge. (But excluding cost of G.S.T)
Supplying ,laying and placing of 9mm, 4 strands Polypropelene Rope Gabion size ( 1.8m x 1.8m x 0.5m) with lid only, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) filled with local sand /earth in geotextile bags size (1.00mx0.75m) or (1.09mx0.69m),fabricated from Engineered Textile" manufactured from 100% PP multifilament yarn by machine in cross direction,woven into stable network such that the yarn retains their relative position.The fabric used for bags shall be (200 GSM)TFI 1200 or equivalent and meet the criteria given under tech. spec. and have high UV resistance, inert to biological degradation and resistant to naturally encountered chemicals like acids and alkalies, including contractors‘ profit but excluding all taxes etc. required for proper completion of work as per direction of engineer-in charge. (But excluding cost of GST.)
Supply and laying of non-woven Geotextile sheet of 200 G S M made of polypropylene staple fibre.Including Contractor profit, T&P, all taxes etc. Required for proper completion of work as per direction of Engineer-in-Charge (But Excluding Cost of G.S.T.)
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_2090960.xls
BOQ • 0.27 MB
BidPDF.pdf
Tender Documents • 1.25 MB
Download all tender documents and submit your bid