Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹1,007.44 (0.45%)Admitted-Finance | ₹2.2 L+₹1,007.44 (0.45%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 L+₹1,567.13 (0.71%)Admitted-Finance | ₹2.2 L+₹1,567.13 (0.71%) | L3 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹22,388
Closing Date
9 Dec 2025, 9:00 amClosed
PRADHAN BELAKOBA GP
BELAKOBA JALPAIGURI
CC ROAD FROM SADEK ALI HOUSE TO JAHIRUDDIN MD HOUSE.(109954649), Fund- 15th CFC 2nd call
2025_ZPHD_948687_4
WB/JAL/SADAR/ BLKGP/03/25-26
Open Tender
CIVIL WORKS
Percentage
30 days
BELAKOBA GP
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
PRADHAN BELAKOBA GP
₹22,388
20 Jan 2026
14 Nov 2025
11 Dec 2025
14 Nov 2025
9 Dec 2025
14 Nov 2025
Earthwork in excavation from borrow pits ( land / arranged by Department)and depositing in layers of 250mm. Including breaking clods in embankment works and to fill up back of abutments , depressions and ruts with an initial lead of 50 mtr. & innitial lift of 1.50 mtr making bunds at top as directed dressing complete.( Borrow pit measurement) i) In ordinary soil Borrowpit-----------89.90 Cost of land --------25.00 Total Rs.114.90/m3
Construction of sub base using local materials,spreading in uniform layers with Motor grader on prepared surface,including screening the metal as necessary, mixing by mix in place method with Rotativator at OMC,and compacting with vibratory roller to achive the desired density, lighting,guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of Specifications for road &Bridges works of MoRT&H(5th revision) . (iv) For Constuction of sub base by compacting river bed materials
Cement concrete (1:3:6) with 30 mm down graded shingles excluding shuttering
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor ar per relavant IS code with river Bazree
Hire and labour charges with centering and necessary staging …………… of works upto 4 mtr. ………….. 25 mm to 30 mm shuttering without staging in foundation (both side)
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-inCharge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
Extra rate for using water proofing and plasticising admixture @ 0.2% by weight of cement (or at manufacturer's specified rate) for concrete of various grades.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_2261192.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .