Loading…
Loading…
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
18 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Chief officer Valsad Municipality valsad
BID DOCUMENTS FOR ROAD RESURFACING WORK OF ASPHALT ROAD AND PAVER BLOCK IN VARIOUS AREA AT VALSAD NAGARPALIKA UNDER: MUKHYAMANTRI SHEHRI SADAK YOJANA (YEAR: 2025-26) SECOND STAGE.
295499
MMSSY/2025-26(Second Phase)
Open
Civil Works - Roads
Valsad
15 documents required · 15 mandatory
₹4,248
The Chief Officer, Valsad Municipality, Valsad
₹2.7 L
8 Apr 2026
8 Apr 2026
8 Apr 2026
18 Apr 2026
8 Apr 2026
SECTION-7 BILL OF QUANTITIES-166
19 ESTIMATE FOR ASPHALT ROAD FROM -HALAR ROAD MAIN ROAD MANISH SHOP TO Rs.
AVABAI GROUND BIHAIND GATE JOINT MAIN ROAD, WARD NO-9 , VALSAD
20 ESTIMATE FOR ASPHALT ROAD FROM -SONA NAGAR SOCIETY JOINT ROAD TO Rs.
LALLA BHAVSAR HOUSE AND DIPSHIH GALI,ABRAMA, WARD NO-10 , VALSAD
21 ESTIMATE FOR ASPHALT ROAD FROM -SONA NAGAR SOCIETY SANJAYBHAI SHOP Rs.
TO TADKESWAR SOCIETY JOINT ROAD,ABRAMA, WARD NO-10 , VALSAD
22 ESTIMATE FOR PAVER BLOCK ROAD OPP.S.T. WORK-SHOP MAIN ROAD TO Rs.
JAYESHBHAI NAYKA HOUSE (WORD-NO-10)- VALSAD
23 ESTIMATE FOR ASPHALT ROAD FROM -ROO FECTORY TO DARSNA PLASTIK CONPNY Rs.
JOINT ROAD,ABRAMA, WARD NO-11 , VALSAD
24 ESTIMATE FOR PAVER BLOCK ROAD AT-BHADARI FALIYA NAYNABEN Rs.
MAHESHBHAI HOUSE TO MAIN ROAD & BHAVANI MATA MANDIR AREA (WORD-NO-
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in
words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good
for work under.
Note : 3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Note : 5 18 % GST Will be paid separately by Valsad Nagarpalika.
Signature of Contractor Chief Officer
Valsad Nagarpalika
SECTION-7 BILL OF QUANTITIES-167
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -ANGANWADI TO VIJAY SHOP TO PANJRI FALIYA JOINT ROAD, WARD NO-1 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 1400.00 Preparing surface by Brushing with wire brushes for removing
Smt caked mud etc. Air compressor / sweeping with brooms and finally
fanning the cleaned surface with gunney bags to remove all loose
dirt etc.(ii) Black top/ CC surface.
2 1400.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 63.00 Providing and Laying Bituminous Grout 75 mm thick compacted
M.T. with B.T. aggregates as M.O.R.T.&H. specification and asphalt
Grade: 60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e.,
1.99% of total weight mix including heating and mixing asphalt and
aggregate by continuous batching drum mix plant and laying with
paver finisher and consolidation with vibratory roller, including cost
of labour, material and plant, fuel, oil, kerosene, labour charges
etc. complete using contractor's machinery drum mix plant and
paver finisher etc. complete.
4 144.38 Providing and Laying 37.50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as Per MORT & H. specification & asphalt for tack
coat @ 2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen
Grade 60/70 for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total
weight of mix including heating the aggregate & asphalt in
continous batching drum mix plant and spreading the same by
paver finisher & consolidation with vibratory roller including
providing all materials equipments, tools & plants, fire wood, oil,
kerosene, labour charges etc. complete using contractor's own
machinery drum mix plant & paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-168
5 100.63 Providing and laying 25 mm thick Semi Dense Bituminous
M.T. Concrete with B.T. aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e.
5.0% by weight of total mix including heating and mixing the
aggregate and asphalt by continuous batching of drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller, including providing all materials equipments, tools
and plants, oil, kerosene, firewood, labour charges etc. complete
using contractor's own machineries drum mix plant and paver
finisher etc. complete.
6 1750.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 18.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover
curing etc.complete incl. all.carting and providing of materrials
which is required for the purpose (except manhole frame and
cover) for all type Manhole by providing RCC 1:2:4 Partition walls
with required reinforcement 25 cm thick and cicular opening with
500 mmclear dia and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-169
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -KHADKIBHAGDA KUWA TO ANGANWADI RAKHODIYA TALAV TO SAIBABA MANDIR, WARD NO-1
Sr. Qauntity Item Total Unit Amount
1 1400.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 2720.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 122.40 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of
totala weight mix including heating and mixing asphalt and
aggregate by continuous batching drum mix plant and laying with
paver finisher and consolidation with vibratory roller, including cost
of labour, material and plant, fuel, oil, kerosene, labour charges etc.
complete using contractor's machinery drum mix plant and paver
finisher etc. complete.
4 224.40 Providing and Laying 37.50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as Per MORT & H. specification & asphalt for tack
coat @ 2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade
60/70 for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching
drum mix plant and spreading the same by paver finisher &
consolidation with vibratory roller including providing all materials
equipments, tools & plants, fire wood, oil, kerosene, labour charges
etc. complete using contractor's own machinery drum mix plant &
paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-170
5 156.40 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 2720.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 25.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-171
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM - PADAR DEVI MANDIR TO SHOPING CENTER JOINT MAIN ROAD, AND NATHUBHAI COMPLEX JOINT
ROAD & MISRA HOUSE ROAD,MOGRAWADI, WARD NO-3 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 2760.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 4032.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 181.44 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher and
consolidation with vibratory roller, including cost of labour, material and
plant, fuel, oil, kerosene, labour charges etc. complete using
contractor's machinery drum mix plant and paver finisher etc.
4 332.64 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
SBD SECTION-7 BILL OF QUANTITIES-172
5 231.84 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 4032.00 Providing and laying Bituminous Painting on B.T. Surface with bitumen
Smt VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical Sprayer and
spreading flushing sand or stone dust on painting surface of the road
at the rate of 0.03 Cmt./10 Smt. with brooming and rolling with PTR
Roller. Rates including all cost of sand/stone dust, equipment T & P
firewood, oil, kerosene, labour charges etc. complete by using
contractor's own machineries.
7 38.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all type
Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-173
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT-AJGAR ALI HOUSE TO HANSHBEN HOUSE TO BHAGUBHAI HOUSE & INTERNAL GALI NEAR MOTA TALAV JOINT ROAD
(WORD-NO-4)- VALSAD
Sr. Qauntity Item Discription Unit Amount
1 217.88 Box cutting the road surface to proper slope & camber for making
Cmt. a base of road work incl. a removing the excavated stuff &
depositing on the road side slope as directed up to 50 m lead.(c)
Above 400 Meters upto 500 Meters
2 217.88 Providing and laying Compacted G.S.B. 150 mm thick
Cmt. Unscreened Gravel including spreading,Watering & Consolidation
vibratory roller etc.Complete. 947.28 Cmt.
3 1097.50 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for
levelling and filling the joint with sand in proper line and level as
per guidlines of IRC SP 63-2018 etc Complete.
4 18.00 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and
5 9.60 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover
curing etc.complete incl. all.carting and providing of materrials
which is required for the purpose (except manhole frame and
cover) for all type Manhole by providing RCC 1:2:4 Partition walls
with required reinforcement 25 cm thick and cicular opening with
500 mmclear dia and 0.40mt.av. ht. 3407.74 No.
SBD SECTION-7 BILL OF QUANTITIES-174
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT-AMBUNAGAR RAJESH PAINTER HOUSE TO RAJUBHAI DABELI AND DASCHHAPRI TABELA TO BHRMDEV MANDIR (WORD-NO-3)- VALSAD
Sr. Qauntity Item Discription Unit Amount
1 144.00 Box cutting the road surface to proper slope & camber for making
Cmt. a base of road work incl. a removing the excavated stuff &
depositing on the road side slope as directed up to 50 m lead.(c)
Above 400 Meters upto 500 Meters
2 144.00 Providing and laying Compacted G.S.B. 150 mm thick
Cmt. Unscreened Gravel including spreading,Watering &
Consolidation vibratory roller etc.Complete. 947.28 Cmt.
3 960.00 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for
levelling and filling the joint with sand in proper line and level as
per guidlines of IRC SP 63-2018 etc Complete.
4 9.00 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and
5 9.60 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover
curing etc.complete incl. all.carting and providing of materrials
which is required for the purpose (except manhole frame and
cover) for all type Manhole by providing RCC 1:2:4 Partition
walls with required reinforcement 25 cm thick and cicular
opening with 500 mmclear dia and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-175
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT-ISVERBHAI HOUSE TO JAY-KISANBHAI HOUSE,HARINAGAR,AMBAJINAGAR AREA JOINT ROAD (WORD-NO-3)- VALSAD
Sr. Qauntity Item Discription Unit Amount
1 84.00 Box cutting the road surface to proper slope & camber for making
Cmt. a base of road work incl. a removing the excavated stuff &
depositing on the road side slope as directed up to 50 m lead.(c)
Above 400 Meters upto 500 Meters
2 84.00 Providing and laying Compacted G.S.B. 150 mm thick
Cmt. Unscreened Gravel including spreading,Watering & Consolidation
vibratory roller etc.Complete.
3 560.00 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for
levelling and filling the joint with sand in proper line and level as
per guidlines of IRC SP 63-2018 etc Complete.
4 6.00 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and plinth.
5 9.60 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover
curing etc.complete incl. all.carting and providing of materrials
which is required for the purpose (except manhole frame and
cover) for all type Manhole by providing RCC 1:2:4 Partition walls
with required reinforcement 25 cm thick and cicular opening with
500 mmclear dia and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-176
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -DARPAN APPARTMENT TO AXAR TAILOR JOINT ROAD,NEAR MOGRAWADI NALA, WARD NO-3
Sr. Qauntity Item Total Unit Amount
1 385.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1015.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 45.68 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher
and consolidation with vibratory roller, including cost of labour,
material and plant, fuel, oil, kerosene, labour charges etc. complete
using contractor's machinery drum mix plant and paver finisher etc.
complete. 2598.40 M.T.
4 83.74 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching
drum mix plant and spreading the same by paver finisher &
consolidation with vibratory roller including providing all materials
equipments, tools & plants, fire wood, oil, kerosene, labour charges
etc. complete using contractor's own machinery drum mix plant &
paver finisher etc. complete. 4205.68 M.T.
SBD SECTION-7 BILL OF QUANTITIES-177
5 58.36 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 1015.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 8.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-178
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -NAGESWAR MANDIR TO SUKI TALAVDI TO RAIL-WAY STATION,MOGRAWADI, WARD NO-4 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 3100.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 3220.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 48.30 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of
totala weight mix including heating and mixing asphalt and
aggregate by continuous batching drum mix plant and laying with
paver finisher and consolidation with vibratory roller, including cost
of labour, material and plant, fuel, oil, kerosene, labour charges etc.
complete using contractor's machinery drum mix plant and paver
finisher etc. complete.
4 268.13 Providing and Laying 37.50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as Per MORT & H. specification & asphalt for tack
coat @ 2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade
60/70 for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching
drum mix plant and spreading the same by paver finisher &
consolidation with vibratory roller including providing all materials
equipments, tools & plants, fire wood, oil, kerosene, labour charges
etc. complete using contractor's own machinery drum mix plant &
paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-179
5 186.88 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 3250.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 23.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-180
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT- MANISHBHAI HOUSE TO GULIYABHAI HOUSE TO SURESHBHAI HOUSE MAIN ROAD JOINT,SUKITALAVDI (WORD-NO-4)-
Sr. Qauntity Item Discription Unit Amount
1 36.90 Box cutting the road surface to proper slope & camber for making a
Cmt. base of road work incl. a removing the excavated stuff & depositing
on the road side slope as directed up to 50 m lead.(c) Above
Meters upto 500 Meters
2 36.90 Providing and laying Compacted G.S.B. 150 mm thick Unscreened
Cmt. Gravel including spreading,Watering & Consolidation vibratory roller
3 246.00 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for levelling
and filling the joint with sand in proper line and level as per guidlines
of IRC SP 63-2018 etc Complete.
4 3.50 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and plinth.
5 5.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-181
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT- SATISHBHAI BABUBHAI HOUSE TO HANUMA MANDIR MAIN ROAD JOINT,PAR FALIYA,MOGRAWADI (WORD-NO-4)-
Sr. Qauntity Item Discription Unit Amount
1 39.38 Box cutting the road surface to proper slope & camber for making a
Cmt. base of road work incl. a removing the excavated stuff & depositing
on the road side slope as directed up to 50 m lead.(c) Above
Meters upto 500 Meters
2 39.38 Providing and laying Compacted G.S.B. 150 mm thick Unscreened
Cmt. Gravel including spreading,Watering & Consolidation vibratory roller
etc.Complete. 947.28 Cmt.
3 262.50 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for levelling
and filling the joint with sand in proper line and level as per guidlines
of IRC SP 63-2018 etc Complete. 742.15 Smt.
4 3.50 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and plinth.
5 4.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear
dia and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-182
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM - GUJRAT BUETRY OPP. RATHOD MEDICAL JOINT ROAD, WARD NO-5 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 0.00 Preparing surface by Brushing with wire brushes for removing
Smt caked mud etc. Air compressor / sweeping with brooms and
finally fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(ii) Black top/ CC surface.
2 450.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
4 37.13 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
5 25.88 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-183
6 450.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming and
rolling with PTR Roller. Rates including all cost of sand/stone dust,
equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 2.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-184
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM - DHAN-LAXMI APP. TO SHIVAM TREDARS, WARD NO-6 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 1280.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1280.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 29.70 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching drum
mix plant and spreading the same by paver finisher & consolidation
with vibratory roller including providing all materials equipments, tools
& plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
complete. 4205.68 M.T.
4 103.04 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-185
5 1280.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries. 33.31 Smt
6 8.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht. 3407.74 Nos.
SBD SECTION-7 BILL OF QUANTITIES-186
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -JALDEVI TO SIDHSHILA AND SAHID CHOWK TO KASTURBA GATE & SARGAP APP PASE, WARD NO-6
Sr. Qauntity Item Total Unit Amount
1 375.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1685.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 50.55 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher
and consolidation with vibratory roller, including cost of labour,
material and plant, fuel, oil, kerosene, labour charges etc. complete
using contractor's machinery drum mix plant and paver finisher etc.
4 139.01 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
SBD SECTION-7 BILL OF QUANTITIES-187
5 96.89 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 1685.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries. 33.31 Smt
7 15.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht. 3407.74 Nos.
SBD SECTION-7 BILL OF QUANTITIES-188
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -M.G ROAD TO MUNDRA SWEET GALI, WARD NO-6 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 540.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1020.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 45.90 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher
and consolidation with vibratory roller, including cost of labour,
material and plant, fuel, oil, kerosene, labour charges etc. complete
using contractor's machinery drum mix plant and paver finisher etc.
4 84.15 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching drum
mix plant and spreading the same by paver finisher & consolidation
with vibratory roller including providing all materials equipments,
tools & plants, fire wood, oil, kerosene, labour charges etc. complete
using contractor's own machinery drum mix plant & paver finisher
SBD SECTION-7 BILL OF QUANTITIES-189
5 58.65 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 1020.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 10.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-190
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -NANI MEHTWAD TO G.V.D. SCHOOL TO AGAM APP., WARD NO-6 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 720.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1190.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 0.00 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher
and consolidation with vibratory roller, including cost of labour,
material and plant, fuel, oil, kerosene, labour charges etc. complete
using contractor's machinery drum mix plant and paver finisher etc.
4 78.38 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching drum
mix plant and spreading the same by paver finisher & consolidation
with vibratory roller including providing all materials equipments,
tools & plants, fire wood, oil, kerosene, labour charges etc. complete
using contractor's own machinery drum mix plant & paver finisher
SBD SECTION-7 BILL OF QUANTITIES-191
5 54.63 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 950.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries. 33.31 Smt
7 12.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht. 3407.74 Nos.
SBD SECTION-7 BILL OF QUANTITIES-192
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -SWAD BAKERY TO RAJGIRI APP.AND OM RESIDENSY, WARD NO-6 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 360.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 410.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 18.45 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher
and consolidation with vibratory roller, including cost of labour,
material and plant, fuel, oil, kerosene, labour charges etc. complete
using contractor's machinery drum mix plant and paver finisher etc.
4 28.88 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching
drum mix plant and spreading the same by paver finisher &
consolidation with vibratory roller including providing all materials
equipments, tools & plants, fire wood, oil, kerosene, labour charges
etc. complete using contractor's own machinery drum mix plant &
paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-193
5 20.13 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 350.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 5.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-194
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -BIHAIND BHAGINI SAMAJ TO SSNIDHYA BUNGLOW AND BHARAT DAIRY MAIN ROAD JOINT ROAD,
WARD NO-8 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 900.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1380.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 27.00 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher and
consolidation with vibratory roller, including cost of labour, material
and plant, fuel, oil, kerosene, labour charges etc. complete using
contractor's machinery drum mix plant and paver finisher etc.
4 74.25 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
complete. 4205.68 M.T.
SBD SECTION-7 BILL OF QUANTITIES-195
5 86.25 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 1500.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 15.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-196
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -OPP.COLLECTOR OFFICE GALI NEAR MUTHOOT FINANCE OFFICE GALI TITHAL ROAD JOINT ROAD,
WARD NO-9 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 900.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 900.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
4 61.88 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
5 43.13 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-197
6 750.00 Providing and laying Bituminous Painting on B.T. Surface with bitumen
Smt VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical Sprayer and
spreading flushing sand or stone dust on painting surface of the road
at the rate of 0.03 Cmt./10 Smt. with brooming and rolling with PTR
Roller. Rates including all cost of sand/stone dust, equipment T & P
firewood, oil, kerosene, labour charges etc. complete by using
contractor's own machineries.
7 8.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all type
Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-198
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM - HALAR ROAD MAIN ROAD MANISH SHOP TO AVABAI GROUND BIHAIND GATE JOINT MAIN ROAD,
WARD NO-9 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 1530.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1955.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 12.75 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher
and consolidation with vibratory roller, including cost of labour,
material and plant, fuel, oil, kerosene, labour charges etc. complete
using contractor's machinery drum mix plant and paver finisher etc.
4 105.19 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70
for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching
drum mix plant and spreading the same by paver finisher &
consolidation with vibratory roller including providing all materials
equipments, tools & plants, fire wood, oil, kerosene, labour charges
etc. complete using contractor's own machinery drum mix plant &
paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-199
5 112.41 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 1955.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 15.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-200
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -SONA NAGAR SOCIETY JOINT ROAD TO LALLA BHAVSAR HOUSE AND DIPSHIH GALI,ABRAMA, WARD
Sr. Qauntity Item Total Unit Amount
1 700.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1060.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 15.90 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of
totala weight mix including heating and mixing asphalt and
aggregate by continuous batching drum mix plant and laying with
paver finisher and consolidation with vibratory roller, including cost
of labour, material and plant, fuel, oil, kerosene, labour charges etc.
complete using contractor's machinery drum mix plant and paver
finisher etc. complete.
4 87.45 Providing and Laying 37.50 mm thick Bituminous Macadam with
M.T. B.T. aggregate as Per MORT & H. specification & asphalt for tack
coat @ 2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade
60/70 for mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix
including heating the aggregate & asphalt in continous batching
drum mix plant and spreading the same by paver finisher &
consolidation with vibratory roller including providing all materials
equipments, tools & plants, fire wood, oil, kerosene, labour charges
etc. complete using contractor's own machinery drum mix plant &
paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-201
5 60.95 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
6 1060.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
7 15.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-202
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -SONA NAGAR SOCIETY SANJAYBHAI SHOP TO TADKESWAR SOCIETY JOINT ROAD,ABRAMA, WARD NO-
Sr. Qauntity Item Total Unit Amount
1 2275.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 2395.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 72.00 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher and
consolidation with vibratory roller, including cost of labour, material and
plant, fuel, oil, kerosene, labour charges etc. complete using
contractor's machinery drum mix plant and paver finisher etc. complete.
4 200.06 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with vibratory
roller including providing all materials equipments, tools & plants, fire
wood, oil, kerosene, labour charges etc. complete using contractor's
own machinery drum mix plant & paver finisher etc. complete.
SBD SECTION-7 BILL OF QUANTITIES-203
5 139.44 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade: VG-
30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of total
mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including providing
all materials equipments, tools and plants, oil, kerosene, firewood,
labour charges etc. complete using contractor's own machineries drum
mix plant and paver finisher etc. complete.
6 2425.00 Providing and laying Bituminous Painting on B.T. Surface with bitumen
Smt VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical Sprayer and
spreading flushing sand or stone dust on painting surface of the road at
the rate of 0.03 Cmt./10 Smt. with brooming and rolling with PTR
Roller. Rates including all cost of sand/stone dust, equipment T & P
firewood, oil, kerosene, labour charges etc. complete by using
contractor's own machineries.
7 24.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all type
Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-204
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT- OPP.S.T. WORK-SHOP MAIN ROAD TO JAYESHBHAI NAYKA HOUSE (WORD-NO-10)- VALSAD
Sr. Qauntity Item Discription Unit Amount
1 206.25 Box cutting the road surface to proper slope & camber for making a
Cmt. base of road work incl. a removing the excavated stuff & depositing
on the road side slope as directed up to 50 m lead.(c) Above
Meters upto 500 Meters
2 206.25 Providing and laying Compacted G.S.B. 150 mm thick Unscreened
Cmt. Gravel including spreading,Watering & Consolidation vibratory roller
3 1375.00 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for levelling
and filling the joint with sand in proper line and level as per guidlines
of IRC SP 63-2018 etc Complete.
4 11.50 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and plinth.
5 9.00 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht. 3407.74 No.
SBD SECTION-7 BILL OF QUANTITIES-205
VALSAD MUNICIPALITY, VALSAD
NAME OF WORK :- ESTIMATE FOR ASPHALT ROAD
FROM -ROO FECTORY TO DARSNA PLASTIK CONPNY JOINT ROAD,ABRAMA, WARD NO-11 , VALSAD
Sr. Qauntity Item Total Unit Amount
1 1060.00 Preparing surface by Brushing with wire brushes for removing caked
Smt mud etc. Air compressor / sweeping with brooms and finally fanning
the cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top/ CC surface.
2 1060.00 Providing and laying Primer coat with Bitumen(SS-1) on prepared
Smt surface of granular base including clearing of road surface and
spraying primer at the rate of 0.75-1.0 kg/Sqm using mechanical
means as per technical Specification Clause-502.
3 103.76 Box cutting the road surface to proper slope & camber for making a
Cmt. base of road work incl. a removing the excavated stuff & depositing
on the road side slope as directed up to 50 m lead.(c) Above
Meters upto 500 Meters
4 55.60 Providing and laying Wet Mix Macadam Base Course as per MORTH
Cmt. Specification using machine crushed B.T chips as per required
gradation,mixing with required optimum quantity of water converying
the mix to site of work,spreading in to grade and camber with paver /
Mechanical means and consoilation each layer with vibratory roller to
achieve the desired density including cost of material labour plant and
equipment etc. complete.
5 37.53 Providing and Laying Bituminous Grout 75 mm thick compacted with
M.T. B.T. aggregates as M.O.R.T.&H. specification and asphalt Grade:
60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with Mechanical
Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e., 1.99% of totala
weight mix including heating and mixing asphalt and aggregate by
continuous batching drum mix plant and laying with paver finisher and
consolidation with vibratory roller, including cost of labour, material
and plant, fuel, oil, kerosene, labour charges etc. complete using
contractor's machinery drum mix plant and paver finisher etc.
SBD SECTION-7 BILL OF QUANTITIES-206
6 111.38 Providing and Laying 37.50 mm thick Bituminous Macadam with B.T.
M.T. aggregate as Per MORT & H. specification & asphalt for tack coat @
2.50 Kg./10 Smt. with Mechanical Sprayer & Bitumen Grade 60/70 for
mixing @ 34.00 Kg./M.T. i.e., 3.40 % of total weight of mix including
heating the aggregate & asphalt in continous batching drum mix plant
and spreading the same by paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant & paver finisher etc.
7 119.03 Providing and laying 25 mm thick Semi Dense Bituminous Concrete
M.T. with B.T. aggregate as per M.O.R.T. & H. gradation, asphalt Grade:
VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of
total mix including heating and mixing the aggregate and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller, including
providing all materials equipments, tools and plants, oil, kerosene,
firewood, labour charges etc. complete using contractor's own
machineries drum mix plant and paver finisher etc. complete.
8 2070.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt. bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
9 18.00 Renovation of Manhole by Increasing the Height at top including cost
Nos. of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht.
SBD SECTION-7 BILL OF QUANTITIES-207
VALSAD MUNICIPALITY, VALSAD
ESTIMATE FOR PAVER BLOCK ROAD
AT-BHADARI FALIYA NAYNABEN MAHESHBHAI HOUSE TO MAIN ROAD & BHAVANI MATA MANDIR AREA (WORD-NO-11- VALSAD
Sr. Qauntity Item Discription Unit Amount
1 71.25 Box cutting the road surface to proper slope & camber for making a
Cmt. base of road work incl. a removing the excavated stuff & depositing
on the road side slope as directed up to 50 m lead.(c) Above
Meters upto 500 Meters
2 71.25 Providing and laying Compacted G.S.B. 150 mm thick Unscreened
Cmt. Gravel including spreading,Watering & Consolidation vibratory roller
3 415.00 Providing and Fixing Pre-cast Rubber Dye/Steel Dye interlocking
Smt. concrete block 80mm thick with Grade M-300 pnumatic
compressed/vibrated mechanically and as per approved esing
confirming to is 15658;2006 including 35mm sand layer for levelling
and filling the joint with sand in proper line and level as per guidlines
of IRC SP 63-2018 etc Complete.
4 7.50 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse
Cmt. sand : 4 graded stone aggregrate 20mm nominal size) and curing
complete excluding cost of form work in (A) Foundation and plinth.
5 9.60 Renovation of Manhole by Increasing the Height at top including
Nos. cost of excavation, refitting of C.I. Maanhole frame and cover curing
etc.complete incl. all.carting and providing of materrials which is
required for the purpose (except manhole frame and cover) for all
type Manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and cicular opening with 500 mmclear dia
and 0.40mt.av. ht. 3407.74 No.
SBD SECTION-7 BILL OF QUANTITIES-208
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
Notes.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid