Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-AOC VILL PANCHGRAM PO PANCHGRAM PS PANCHGRAM DIST CACHAR ASSAM PIN 788802 | CACHAR | ASSAM | 788802 | ₹33.3 L | L1 | Accepted-AOC Awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical Refer to technical minutes |
| 3 | Rejected-Technical PURBOKITTERBOND II AMALA MONACHERRA CITY TOWN HAILAKANDI P O AMALA P S HAILAKANDI DISTRICT HAILAKANDI PIN 788164 | HAILAKANDI | ASSAM | 788164 | - | - | Rejected-Technical Refer to technical minutes |
| 4 | Rejected-Technical VILL SURJADAS P O P S KARIMGANJ DIST KARIMGANJ ASSAM PIN 788720 | KARIMGANJ | ASSAM | 788720 | - | - | Rejected-Technical Refer to technical minutes |
| 5 | Rejected-Technical | - | - | Rejected-Technical Refer to technical minutes |
| Sl No | Description | Qty | Unit | SAM CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00RCC DROP SPILLWAY AT MANIKPUR OF SALCHARAPARA DEV. BLOCK (Part-A) | ||||
| 1.01 | Site preparation , cleaning and removing of debris etc. | 0.01 | Ha | 46,879.54 ₹703.19 Lowest |
| 1.02 | Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Above GBL | 69.68 | cum | 133.95 ₹9,333.64 Lowest |
| 1.03 | Excavation for Structure
Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL | 43.82 | cum | 134.1 ₹5,876.26 Lowest |
| 1.04 | Sand Filling in Foundation
Fillling in foundation trenches as per drawing and technical specification Clause305.3.9 | 4.71 | cum | 1,454.52 ₹6,850.79 Lowest |
| 1.05 | Plain Cement Concrete
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 9.42 | cum | 5,339.96 ₹50,302.42 Lowest |
| 1.06 | RCC Works
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work. | 58.89 | cum | 6,617.35 ₹3,89,695.74 Lowest |
| 1.07 | Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications. | 35.34 | Qntl | 5,685.72 ₹2,00,910.6 Lowest |
| 1.08 | Plastering of Walls
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications. | 91.52 | Sq m | 127.95 ₹11,709.98 Lowest |
| 1.09 | Guide Bund, coffer bund
Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted. | 408 | cum | 150.24 ₹61,297.92 Lowest |
Tender Value
₹39.7 L
EMD Value
₹79,340
Closing Date
27 Feb 2025, 6:00 pmClosed
Director of Soil Conservation
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHVMI SHANGRAKSHAN BHAWAN, R.G.B. ROADT GUWAHATI-05
Satkoragool (Petikara NaIa) Water Harvesting Project (3 Nos.) at Manikpur in Cachar District under RIDF-XXX during the Financial year 2024-25
2025_SCD_42571_2
No. Tender/NIT/Pt/2024-25/4162
Open Tender
Civil Works
Item Rate
90 days
Manikpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹79,340
Yes
O/o The DSC, Assam
1 Sept 2025
6 Feb 2025
28 Feb 2025
7 Feb 2025
27 Feb 2025
15 Feb 2025
13 Feb 2025
Amount
RCC DROP SPILLWAY AT MANIKPUR OF SALCHARAPARA DEV. BLOCK (Part-A)
Site preparation , cleaning and removing of debris etc.
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Above GBL
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL
Sand Filling in Foundation Fillling in foundation trenches as per drawing and technical specification Clause305.3.9
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Works RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
Guide Bund, coffer bund Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted.
Diversion Channel Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines,grades,levels and dimensions.Excavated materials to be used in embankment with a lift upto 3m and lead of 50m, as per technical specification clause 307.
Turfing of Guid bund Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
PERPHEY BUND AT MANIKPUR OF SALCHARAPARA DEV. BLOCK (Part-A)
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Providing fitting fixing of RCC Signboard
RCC DROP SPILLWAY AT NISCHINTAPUR OF SALCHARAPARA DEV. BLOCK (Part-B)
Site preparation , cleaning and removing of debris etc.
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Above GBL
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL
Sand Filling in Foundation Fillling in foundation trenches as per drawing and technical specification Clause305.3.9
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Works RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
Guide Bund, coffer bund Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted.
Diversion Channel Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines,grades,levels and dimensions.Excavated materials to be used in embankment with a lift upto 3m and lead of 50m, as per technical specification clause 307.
Turfing of Guid bund Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
PERPHEY BUND AT NISCHINTAPUR OF SALCHARAPARA DEV. BLOCK (Part-B)
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Providing fitting fixing of RCC Signboard
RCC DROP SPILLWAY AT RAKHAL KHALERPAR PT-II OF SALCHARAPARA DEV. BLOCK (Part-C)
Site preparation , cleaning and removing of debris etc.
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Above GBL
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technicalspecification, including setting out, construction of shoring & bracing, removal ofstumps & other deleterious matter, dressing of sides & bottom and backfilling intrenches with approved material. Below GBL
Sand Filling in Foundation Fillling in foundation trenches as per drawing and technical specification Clause305.3.9
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Works RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
Guide Bund, coffer bund Construction of embankment with approved matarial deposited at the site from roadway cutting and excavation from drain and foundation of other structures graded and compacted.
Diversion Channel Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines,grades,levels and dimensions.Excavated materials to be used in embankment with a lift upto 3m and lead of 50m, as per technical specification clause 307.
Turfing of Guid bund Furnishing and laying of the live sods of perennial turf forming grass on embankment slope,including preparation of ground,fetching of sods and watering as per Technical Specification.
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
Providing fitting fixing of RCC Signboard
PERPHEY BUND AT RAKHAL KHALERPAR PT-II OF SALCHARAPARA DEV. BLOCK (Part-C)
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Providing fitting fixing of RCC Signboard
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .