Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹5.5 L+₹7,595.50 (1.40%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SAHEER E A L1 | Babu P T L2 |
|---|---|---|---|---|---|
| 1.00maintenance work | |||||
| 1.00 | 13.91:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 831.42 | sqm | 23.87 ₹19,846 Lowest | 24.21 ₹20,128.68 |
| 1.00 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 831.42 | sqm | 190.89 ₹1,58,709.76 Lowest | 193.56 ₹1,60,929.66 |
| 1.00 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 240.75 | sqm | 99.02 ₹23,839.07 Lowest | 100.41 ₹24,173.71 |
| 1.00 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 3,259.09 | sqm | 103.93 ₹3,38,717.64 Lowest | 105.39 ₹3,43,475.92 |
Tender Value
₹5.9 L
EMD Value
₹14,830
Closing Date
18 Sept 2026, 3:00 pmClosed
AE Kunnukara
AE Kunnukara
39/KKA/26-27/GOVT JBS MAINTENANCE WORKS
2026_LSGD_869158_1
9/AE/LIDEW/KKA/26-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kunnukara
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,830
Yes
22 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1maintenance work | |||||
| 1.001 | 13.91:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 831.42 | sqm | - | - |
| 1.002 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 831.42 | sqm | - | - |
| 1.003 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 240.75 | sqm | - | - |
| 1.004 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 3,259.09 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1472267.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1472267.xls
BOQ • 0.30 MB
JBSSBD.pdf
Tender Documents • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .