Tender Value
₹9.0 L
EMD Value
₹17,976
Closing Date
29 Sept 2026, 2:00 pm7d left
SM
SM WCS HEEP BHEL HARIDWAR
Misc. civil and other foundation works in factory area in HEEP
2026_BHEL_65171_1
BHEL/HEEP/ WEX-WCS/ 26-27/ 6200/202601711, Dt. 19.09.2026
Limited
Civil Works
Percentage
365 days
HEEP Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,976
19 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Lime, moorum, building rubbish:3 km Unit:cum | 10 | cum | 35.17 | ₹351.7 |
| 2 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Earth:3 km Unit:cum | 10 | cum | 43.96 | ₹439.6 |
| 3 | Centring and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases of Columns Unit:sqm | 15 | sqm | 61.1 | ₹916.5 |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Suspended floors, roofs, landings, balconies and access platform. Unit:sqm | 10 | sqm | 111.2 | ₹1,112 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Lintels, beams, plinth beams, girders, bressumers and cantilevers. Unit:sqm | 10 | sqm | 87.95 | ₹879.5 |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Columns, Pillars, Piers, Abutments, Posts and Struts Unit:sqm | 10 | sqm | 135.8 | ₹1,358 |
| 7 | Extra for additional height in centring, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentring at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured):Suspended floors, roofs, landing, beams and balconies(Plan area to be measured) Unit:sqm | 15 | sqm | 45.9 | ₹688.5 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . :Thermo-Mechanically Treated bars. Unit:kilogram | 200 | kilogram | 3.8 | ₹759.2 |
| 9 | Providing and fixing 18mm thick mirror polished, machine cut for kitchen platforms, vanity counters facias and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 Cement : 4 coarse sand) with joints treated with white cement ,mixed with matching pigment, epoxy touch ups, including rubbing ,curing etc. complete at all levels.:Over 0.5 sqm but upto 1.0 sqm Unit:sqm | 3 | sqm | 2,284.05 | ₹6,852.15 |
| 10 | Providing and fixing on wall face unplasticised - Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes:110 mm diameter Unit:metre | 20 | metre | 126.65 | ₹2,533 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tendernotice_2.pdf
PDF • 4.94 MB
BOQ_70604.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .