| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.0 LAccepted-AOC GHARKUL CO OP HSG SOCIETY PLOT NO RH 125 MIDC RESI ZONE KALYAN ROAD DOMBIVLI E 421203 | THANE | MAHARASHTRA | 421203 | ₹22.0 L Quoted ₹22.0 Cr | L-1 | Accepted-AOC ACCEPTED |
| 2 | L-2₹22.8 LRejected-AOC RM 4 SAHJEEVAN HOC G BLOCK MIDC SHAHUNAGAR KSB CHOWK CHINCHWAD PUNE 411019 | PUNE | PUNE | MAHARASHTRA | 411019 | ₹22.8 L | L-2 | Rejected-AOC REJECTED |
| 3 | Rejected-Technical | - | - | Rejected-Technical work done not as per NIT |
Tender Value
₹26.0 L
EMD Value
₹26,000
Closing Date
27 Jul 2026, 11:00 amClosed
Executive Engineer MIDC IT Pune
4th Floor, jog Center Building, Near Vodafone building, Wakadewadi, pune 03
IT ADDL PUNE INFOTECH PARK 1 INDUSTRIAL AREA Rajiv Gandhi Infotech Park 1 MIDC Hinjewadi Pune Lower down existing 600 mm Dia MS raw water rising main Infront of LTI Mindtree companys proposed exit gate
2026_MIDC_1316517_1
28D/2026
Open Tender
Supply, Erection and Commissioning
Percentage
Hinjawadi Pune
Please refer Tender documents.
9 documents required · 9 mandatory
₹7,080
₹26,000
25 Aug 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
27 Jul 2026
17 Jul 2026
10 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Sub Estimate: Clearing grass and removal of rubbish upto a distance of 50 metres outside the periphery of the area . | 100.9 | Square Meter | 4 | ₹403.6 |
| 1.02 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) Lift 0 to 1.5 M | 9 | Cubic Meter | 165 | ₹1,485 |
| 1.03 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) Lift 0 to 1.5 M | 13.5 | Cubic Meter | 629 | ₹8,491.5 |
| 1.04 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means.(Bd-A-6/259) | 68 | Cubic Meter | 1,119 | ₹76,092 |
| 1.05 | Add for every additional lift beyond initial lift of 1.5 M | 23 | Cubic Meter | 28 | ₹644 |
| 1.06 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction,etc.complete.(Bd-A-10/263) | 4 | Cubic Meter | 92 | ₹368 |
| 1.07 | Filling in plinth and floors / trenches with contractor's murum for bedding in 15 cm to 20 cm layers including watering and compaction, etc. complete.(Bd-A-11/263) | 4 | Cubic Meter | 912 | ₹3,648 |
| 1.08 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 30 | Running Meter | 584 | ₹17,520 |
| 1.09 | Manufacturing, providing and supplying spirally welded / ERW/ SAW / fabricated M. S. pipes (Commercial Quality) including procurements of plates, gas cutting to requried size rolling, tack welding assembling in suitable lengths to form pipes, welding on automatic welding machine and forming ‘V’ edge on both ends of pipes including railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores, unloading, stacking excluding GST levied by GOI & GOM in all respect, etc, complete as per IS - 3589 and IS-5504 as applicable as per specifications (No negative tolerance in thickness is permissible). | 30 | Running Meter | 19,932 | ₹5,97,960 |
| 1.1 | Providing and applying primer and one coat of red oxide of iron paint internally to blast cleaned surface of the pipes. | 90 | Square Meter | 51 | ₹4,590 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_2257255.xls
BOQ • 0.36 MB
TenderDocument.pdf
Tender Documents • 0.39 MB
ItemSpecification.pdf
Other Document • 0.01 MB
Notice.pdf
Additional Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].