Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.1 LAccepted-AOC LAKHPURA BUTCHERY MISSAMARI DIST SONITPUR ASSAM PIN 784506 | MISSAMARI | SONITPUR | ASSAM | 784506 | L1 | Accepted-AOC BEING LOWEST AND REASONABLE. | |
| 2 | L2₹47.5 L+₹2.8 L (6.28%)Rejected-Finance | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹47.5 L+₹2.8 L (6.32%)Rejected-Finance AMBAGAN TEZPUR TOWN PO PS TEZPUR DIST SONITPUR ASSAM | SONITPUR | ASSAM | 784001 | L3 | Rejected-Finance NOT BEING LOWEST | |
| 4 | L4₹47.7 L+₹3.0 L (6.63%)Rejected-Finance GORUBANDHA MISSAMARI 784 506 | SONITPUR | ASSAM | 784506 | L4 | Rejected-Finance NOT BEING LOWEST | |
| 5 | L5₹48.0 L+₹3.3 L (7.29%)Rejected-Finance RANGAPARA TOWN WARD NO 1 PS PO RANGAPARA DIST SONITPUR ASSAM | L5 | Rejected-Finance NOT BEING LOWEST |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
25 Jul 2023, 6:00 pmClosed
GE MISAMARI
PO-Missamari Dist-Sonitpur Assam
REPAIR/MAINTENANCE OF PUMP SET, MOTORS, STARTER,CLARIFLOCCULATOR INCL PANEL BOARDS AND MISC WORKS AT WATER SUPPLY INSTALLATIONS AT NORTH OF RAILWAY LINE UNDER GE MISSAMARI
2023_MES_607783_1
8375
Open Tender
Pumps/Motors
Item Rate
270 days
GE MISAMARI
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹500
GE MISAMARI
₹96,000
Yes
9 Nov 2023
4 Jul 2023
28 Jul 2023
4 Jul 2023
25 Jul 2023
18 Jul 2023
Amount
Servicing/Overhauling of 3 Phase 415 Volts 1440 RPM 150 HP/125 HP capacity Induction Motor (MAKE : KIRLOSKAR/ ALSTOM) installed at Jalkendra, Intermediate Pump House alongwith following others repairs :- (a) Taking out Motor from its Position by decoupling from Pump and disconnecting all Cable Connections. (b) Dismantling of induction Motor complete Part by Part carefully, testing all Coils, degreasing bearing and display all the Parts without damaging any portion for inspection of Engineer-in-Charge to ascertain the Serviceability of existing Parts. (c) Heating & Varnishing to Stator with super quality varnish and dried out properely with external heat as ordered and as directed. (d) Reassembeling the Motor complete with all existing Serviceable Parts obtained against Item 1(b), greasing the Bearing with bearing grease and new Parts as ordered by Engineer-in-Charge (New Parts shall be measured and paid separately under relevant Item here-in after) (e) Reinstall the Motor at its existing Position, couple with the Pump connecting all Cable connections and testing on completion complete all as specified and as directed. Note :- (i). Any Parts required for replacement shall be measured and paid seperately under appropriate item as ''Supply only'' (s) of this schedule. However labour element involved in replacement is included in unit rate quoated against this Item. (ii). .Any unforeseen minor repair and minor parts ( Total cost less than Rs 200 ) that are not covered under Item No-1 , (a) to (e) but required to complete the repair work / smooth functioning of Motor shall be deemed to be included with the unit rate .Transportation of Stator / Rotor parts for machining , rewinding at lathe shop at Tezpur / Rangapara is also deemed to be included with unit rate. iii). Rewinding of stator / rotor of motor, any machine work where involved shall be measured and paid separetely against relevant item of this schedule.
Supply only DE ( Driver End ) Bearing No- NU318C3 or as per existing size Make- SKF, TATA suitable for 150/125 HP Motor against Item No. 1 here-in-above, complete all as specified and as directed.
Supply only NDE ( Non Driver End ) Bearing No- 6314C3 or as per existing size Make- SKF, TATA suitable for 150/125 HP Motor against Item No. 1 here-in-above, complete all as specified and as directed.
Supply only Bakelite connection terminal plate with brass nuts bolts and washers suitable for 150/125 HP Motor against Item No. 1 here-in-above, complete all as specified and as directed.
Rewinding burnt coils of Induction Motor stator of capacity 125 HP /150 HP obtained from Item Ser No-1 here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding, cleaning/ repairing damaged slots, complete all as specified and as directed.
Servicing / Overhauling of Electric driven Vertical / Horizontal NC split casing Pump-set having discharge 50000 GPH/ 60000 GPH, H 61-M ( Make- Kirloskar ) coupled with induction Motor 125HP/ 150 HP capacity installed at Jalkendra, Intermediate Pump house along with following others repairs :- a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b). Dismantling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in-Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope. d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 6(b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position, couple with the Motor and connecting all suction delivery water connections and testing on completion complete all as specified and as directed. (NOTE: For Note description refer item no.01 )
Supply only DE ( Driver End ) bearing as per existing size Make- SKF/TATA NO 6314ZZ/6309ZZ (Heavy Duty) (PROVISIONAL) of Horizontal Split casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only NDE ( Non Driver End ) bearing as per existing size Make- SKF/TATA NO 7316ZZ/3309ZZ/22315 ZZ( Heavy Duty), ( PROVISIONAL) of Horizontal Split casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only SS Pump Shaft sleeve for Pump shaft (PROVISIONAL) of Horizontal Split casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only Rubber tyre Coupling (PROVISIONAL) of Horizontal Split casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only CI coupling tyre UNIQUE -PX-100 (PROVISIONAL) of Horizontal Split casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only CI Impeller Horizontal Split casing Pump (PROVISIONAL) of Horizontal casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only Pump Shaft (PROVISIONAL) of Horizontal casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only Oil Seal (PROVISIONAL) of Horizontal casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Supply only/ Topping up Engine Oil (20W50) (PROVISIONAL) of Horizontal casing Pump to incorporate against each Item No.6 here-in-above complete all as specied and as directed.
Welding Turning and machining works of Pump Shaft obtained from Item No 6 here-in-before to true size to match with the new Parts / existing serviceable parts for proper allignment and smooth operation of Motor Pump Set complete all as specified and as directed
Servicing / overhauling of 3 Phase 415 Volts 1440 RPM 75 HP capacity induction (Motor Make-Jyoti, Kirloskar, Becon ) Installed at Jalkendra Pump House, along with following others repairs :- a). Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed. d). Reassembeling the motor complete with all existing serviceable parts obtained against Item 17(b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge. (New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position , couple with the Pump connecting all cable connections and testing on completion complete all as specified and as directed. (NOTE: For Note description refer item No. 01)
Supply only DE ( Driver End ) Bearing No- NU314 / N 344 or as per existing Make- SKF, TATA of Induction Motor against Item No-17 here-in-above complete all as specified and as directed.
Supply only NDE ( Non Driver End ) Bearing No - 6313 / 6311 or as per existing size Make- SKF, TATA of Induction Motor against Item No-17 here-in-above complete all as specified and as directed.
Supply only Bakelite connection plate with brass nuts bolts and washers ( PROVISIONAL) of Induction Motor against Item No-17 here-in-above complete all as specified and as directed.
Rewinding burnt coils of Induction Motor stator of capacity 75 HP obtained from Item Ser No-17 here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding, cleaning/ repairing damaged slots, complete all as specified and as directed.
Servicing / over hauling of Electric driven Multi staging Pump set having discharge Cap 40000 GPH, H-61 M (Pump Make-BE, Alstom ) Installed at Jalkendra , coupled with induction Motor 75 HP capacity along with following others repairs :- a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b) Dismantling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 22 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion complete all as specified and as directed. (NOTE: For Note description refer item No. 01)
Supply only DE ( Driver End ) bearing as per existing size Make- SKF/TATA 6307ZZ ( heavy duty) for pump coupled with 75 HP motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Supply only NDE ( Non Driver End ) bearing as per existing size Make- SKF/TATA 6306/6307 ( heavy duty) for pump coupled with 75 HP motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Supply only SS Pump Shaft sleeve for Pump shaft of 75 HP Motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Supply only CI Impeller as per Existing of pump set for pump coupled with 75 HP motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Supply only Pump Shaft for pump coupled with 75 HP motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Supply only Rubber Tyre Coupling complete set UNIQUE -PX-90 for pump coupled with 75 HP motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Supply only CI coupling tyre only UNIQUE PX-90 for pump coupled with 75 HP motor to incorporate against Item No-22 here-in-above complete all as specified and as directed.
Welding Turning and machining works of Pump Shaft obtained from Item No 22 here-in-Before to true size to match with the new Parts / existing serviceable parts for proper allignment and smooth operation of Motor Pump Set complete all as specified and as directed
Servicing / over hauling of Electric Motor Vertical 3 Phase 415 Volts 1440 RPM capacity 40 HP / ( Make- Jyoti, CVO) . installed at Jalkendra , along with following others repairs. a). Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c) Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed d). Reassembeling the motor complete with all existing serviceable parts obtained against Item 31 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position , couple with the Pump connecting all cable connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of Vertical Electric Induction Motor to incorporate against each Item No-31 here-in-above DE ( Driver End ) Bearing as per existing Make- SKF/TATA 6314/6311ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of Vertical Electric Induction Motor to incorporate against each Item No-31 here-in-above NDE ( Non Driver End ) Bearing Make- SKF/TATA 7316ZZ/6310ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of Vertical Electric Induction Motor to incorporate against each Item No-31 here-in-above Bakelite connection plate with brass nuts bolts and washers
Rewinding burnt coils of Vertical Electric Induction Motor stator cap 40 HP obtained from Item Ser No-31here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
Servicing / over hauling of Vertical Turbine Multi staging Pump installed Inslde Jackwell coupled with 40 HP Vertical Motor at Jalkendra along with following others repairs. a). Decoupling Vertical Motor from Pump shaft and disconnecting all suction /delivery water connections , setting aside Motor from base plate , Lifting column pipes and submersible multistaging Pump set from Jackwell ,setting aside and stacking column pipes for reuse complete all as directed by Engnr-in-Charge. b).Dismantling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 36 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Lowering column pipes and submersible multistaging Pump set inside Jackwell ,connecting Suction/ delivery Lines including replacement of nuts bolts , washers and rubber gasket f) Reinstall the pump at its existing Position , couple with the motor connecting all cable connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above CI Impeller
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Impeller Collet
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above GM Bowel Bushing
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Stain Less Steel (SS) Line Shaft 10'- Long
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Stain Less Steel (SS) Top Shaft ( Motor Shaft)
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above SS Spider Guide Shaft Sleeve
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above SS lline/pump Shaft Coupler/ reduce Socket
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above SS lline Shaft Coupler/Socket
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above CI Shaft Spider Guide ( 8") dia
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Suction Case
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Discharge Case
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Impeller centre Bowl
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Impeller Top Bowl
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above VT Pump strainer
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Bowl studs
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above MS heavy duty column Pipe 200 mm Bore both ends flanged (3.0 Meter Long )
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above MS heavy duty 200mm dia flange only
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above MS Nut bolts with washers 5/8 dia and 3"/6" long
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above MS Nut bolts with washers 1/2" dia and 3" long
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Pump coupled with 40 HP Vertical Motor to incorporate against each Item No-36 here-in-above Rubber gasket 4/6 mm thick
Servicing / over hauling of 3 Phase 415 Volts 1440 RPM 20 HP (Motor Make--Kirloskar ) Installed at AIR OP pump House Swimming Pool, Rekhamari , coupled with NC Horizontal Pumping Set a). Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c)., Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed d). Reassembeling the motor complete with all existing serviceable parts obtained against Item 57 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position , couple with the Pump connecting all cable connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of 20 HP Motor to incorporate against each Item No-57 here-in-above DE ( Driver End ) bearing as per existing size Make- SKF/TATA no.6306ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of 20 HP Motor to incorporate against each Item No-57 here-in-above NDE ( Non Driver End ) Bearing as per existing size Make- SKF/TATA no.6307ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of 20 HP Motor to incorporate against each Item No-57 here-in-above Bakelite Terminal connection plate with brass nuts bolts and washers
Supply only the following Items ( PROVISIONAL) of 20 HP Motor to incorporate against each Item No-57 here-in-above Plastic Rotar Fan
Supply only the following Items ( PROVISIONAL) of 20 HP Motor to incorporate against each Item No-57 here-in-above Tyre coupling complete set No-60/70
Supply only the following Items ( PROVISIONAL) of 20 HP Motor to incorporate against each Item No-57 here-in-above Tyre coupling Rubber tyre only No-60/70
Rewinding burnt coils of Induction Motor stator cap 20 HP obtained from Item Ser No-57 here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed.
Servicing / over hauling of Electric driven Horizontal split casing Pump set of Discharge cap 1230 LPM, H-30 M (Pump Make-Kirloskar , HBB) Installed at AIR OP pump House , Swimming Pool, Rekhamari coupled with induction Motor 20 HP capacity along with following others repairs. a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b).Dismantling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 65 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of Pump coupled with 20 HP Motor to incorporate against each Item No-65 here-in-above DE ( Driver End ) bearing as per existing size Make- SKF/TATA no.6306ZZ/6307ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of Pump coupled with 20 HP Motor to incorporate against each Item No-65 here-in-above NDE ( Non Driver End ) bearing as per existing size Make- SKF/TATA no.6307ZZ/6308ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of Pump coupled with 20 HP Motor to incorporate against each Item No-65 here-in-above SS Pump Shaft sleeve for Pump shaft
Supply only the following Items ( PROVISIONAL) of Pump coupled with 20 HP Motor to incorporate against each Item No-65 here-in-above CI Impeller as per Existing
Supply only the following Items ( PROVISIONAL) of Pump coupled with 20 HP Motor to incorporate against each Item No-65 here-in-above Pump Shaft
Welding Turning and machining works of Pump Shaft obtained from Item No 65 here-in-Before to true size to match with the new Parts / existing serviceable parts for proper allignment and smooth operation of Motor Pump Set complete all as specified and as directed
Servicing / over hauling of 3 Phase 415 Volts 1440 RPM 15 HP Motor Make-Kirloskar Installed at Jalkendra Pump house a). Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c)., Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed d). Reassembeling the motor complete with all existing serviceable parts obtained against Item 72 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position , couple with the Pump connecting all cable connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of 15 HP Motor to incorporate against each Item No-72 here-in-above DE ( Driver End ) bearing as per existing size Make- SKF/TATA no.6306ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of 15 HP Motor to incorporate against each Item No-72 here-in-above NDE ( Non Driver End ) Bearing as per existing size Make- SKF/TATA no.6308ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of 15 HP Motor to incorporate against each Item No-72 here-in-above Bakelite Terminal connection plate with brass nuts bolts and washers
Supply only the following Items ( PROVISIONAL) of 15 HP Motor to incorporate against each Item No-72 here-in-above Plastic Rotar Fan
Rewinding burnt coils of Induction Motor stator cap 15 HP obtained from Item Ser No-80 here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
Servicing / over hauling of Electric driven Horizontal split casing Pump set of Pump Discharge 26.5 LPS, H-21.5M, (Pump Make-Kirloskar ,) Installed at Jalkendra Pump House coupled with 15 HP Motor along with following others repairs. a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b).Dismantling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 78 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of NC Horizontal/ Vertical Pump coupled with 15 HP Motor to incorporate against each Item No-78 here-in-above DE ( Driver End ) bearing as per existing size Make- SKF/TATA no.6307ZZ/6306ZZ ( heavy duty
Supply only the following Items ( PROVISIONAL) of NC Horizontal/ Vertical Pump coupled with 15 HP Motor to incorporate against each Item No-78 here-in-above NDE ( Non Driver End ) bearing as per existing size Make- SKF/TATA no.6308ZZ ( heavy duty
Supply only the following Items ( PROVISIONAL) of NC Horizontal/ Vertical Pump coupled with 15 HP Motor to incorporate against each Item No-86 here-in-above SS Pump Shaft sleeve for Pump shaft
Supply only the following Items ( PROVISIONAL) of NC Horizontal/ Vertical Pump coupled with 15 HP Motor to incorporate against each Item No-86 here-in-above CI Impeller as per Existing
Supply only the following Items ( PROVISIONAL) of NC Horizontal/ Vertical Pump coupled with 15 HP Motor to incorporate against each Item No-86 here-in-above Pump Shaft
Supply only the following Items ( PROVISIONAL) of NC Horizontal/ Vertical Pump coupled with 15 HP Motor to incorporate against each Item No-78 here-in-above tyre Coupling complete set No.60
Supply only Star Rubber Coupling (PROVISIONAL) of NC Horizontal/ Vertical split casing Pump coupled with 10 HP Motor to incorporate against each Item No-78 here-in-above complete all as specified and as directed.
Welding Turning and machining works of Pump Shaft obtained from Item No 78 here-in-Before to true size to match with the new Parts / existing serviceable parts for proper allignment and smooth operation of Motor Pump Set complete all as specified and as directed
Servicing / over hauling of 3 Phase 415 Volts 1440 RPM 10 HP Motor (Make-Kirloskar , Jyoti , CG ) Installed at AIR OP pump House , Rekhamari Pump House and lama camp pump house. a). Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c)., Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed d). Reassembeling the motor complete with all existing serviceable parts obtained against Item 87 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position , couple with the Pump connecting all cable connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of 10 HP Motor to incorporate against each Item No-87 here-in-above DE ( Driver End ) bearing as per existing size Make- SKF/TATA no.6307ZZ/6308ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of 10 HP Motor to incorporate against each Item No-87 here-in-above NDE ( Non Driver End ) Bearing as per existing size Make- SKF/TATA no.SKF/TATA no.6307ZZ/6308ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of 10 HP Motor to incorporate against each Item No-87 here-in-above Bakelite connection plate with brass nuts bolts and washers
Rewinding burnt coils of Induction Motor stator cap 10 HP obtained from Item Ser No-87 here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
Servicing / over hauling of Electric driven Horizontal split casing Pump set of Pump Discharge Centrifugal 10000 - GPH, H- 40M, 10 HP, (Pump Make-Kirloskar ,BE, Jyoti ) Installed at AIR OP pump House , Rekhamari Pump House and lama camp pump house. along with following others repairs. a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b).Dismantling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 92 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-92 here-in-above DE ( Driver End ) bearing as per existing size Make-SKF/TATA no.6308ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-92 here-in-above NDE ( Non Driver End ) bearing as per existing size Make- SKF/TATA no.6308ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-100 here-in-above SS Pump Shaft sleeve for Pump shaft
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-100 here-in-above CI Impeller as per Existing
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-100 here-in-above Pump Shaft
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-92 here-in-above tyre Coupling complete set No.60
Supply only the following Items ( PROVISIONAL) of NC Horizontal split casing Pump coupled with 10 HP Motor to incorporate against each Item No-92 here-in-above tyre copling rubber only N0.60
Welding Turning and machining works of Pump Shaft obtained from Item No 92 here-in-Before to true size to match with the new Parts / existing serviceable parts for proper allignment and smooth operation of Motor Pump Set complete all as specified and as directed
Servicing / over hauling of 3 Phase 415 Volts 1440 RPM 5 HP (Motor Make-Kirloskar, CG) Installed at Jalkendra, 206 AVN and 1880 Rkt offr mess. a). Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c)., Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed d). Reassembeling the motor complete with all existing serviceable parts obtained against Item 101 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position , couple with the Pump connecting all cable connections and testing on completion (NOTE: For Note description refer item No. 01)
Supply only the following Items ( PROVISIONAL) of Motor to incorporate against each Item No-101 here-in-above DE ( Driver End ) bearing as per existing size suitable for Cap 5 HP Electric induction Motor Make- SKF/TATA no.6306ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of Motor to incorporate against each Item No-101 here-in-above NDE ( Non Driver End ) Bearing as per existing size suitable for Cap 5 HP Electric induction Motor Make- SKF/TATA no.6307ZZ ( heavy duty)
Supply only the following Items ( PROVISIONAL) of Motor to incorporate against each Item No-101 here-in-above Bakelite connection plate with brass nuts bolts and washers suitable for Motor cap 5 HP
Rewinding burnt coils of Induction Motor stator cap 5 HP obtained from Item Ser No-101 here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
Servicing / over hauling of 3 Phase 415 Volts, 50 Hz , RPM 2900 Submersible Motor Pump set of capacity upto 30/25/22.5/20 HP( Make- Calama, Texmo, KSB,) installed installed inside borewell and jackwell at Jalkendra ,Lama Camp, Rekhamari , AOP Pump House along with following others repairs. (a). Disconnecting delivery water connections Lifting column pipes along with connected submersible motor Pump set, submersible cable by making necessary arrangements from bore well ,setting aside and stacking column pipes for reuse complete all as directed by Engnr-in-Charge. (b) Dismantling of Submersible Motor Pump- Set complete part by part carefully , testing all coils of submersible Motor , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. (c). Reassembeling the motor complete with all existing serviceable parts obtained against Item 106 (b), greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) (d). Painting the repaired motor and column Pipes externally with one coats of red oxide paint and two coat of synthetic enameal paint of shade as directed by Engnr-in-Charge. (e) Reinstall the Motor at its existing Position by Lowering column pipes and submersible Motot Pump set inside Bore well ,connecting Suction/ delivery Lines, all cable connections and testing on completion (NOTE: For Note description refer item no.01)
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Suction Casing
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Stage Bowl
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above M S Suction Strainer
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above SS Pump Shaft
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Bronze Impeller
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Valve Body
Supply only the following Items ( PROVISIONAL) of Submersible Multi staging Mixed Flow Pump coupled with submersible motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Rubber Oil Seal
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Adapator
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Bronze Sand Guard
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Thrust Bearing Housing
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Bearing Body
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Bronze Thrust bearing Plate
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Bronze Thrust Bearing segments
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above CI Bearing segment carrier
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Bronze bearing Bush
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Rubber Diaphragm
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above Cr. St. Coupling Sleeve
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above MS heavy duty column Pipe 100mm Bore both ends flanged (3.0 Meter Long )
Supply only the following Items ( PROVISIONAL) of Submersible Motor upto capacity 20 HP to 30 HP to incorporate against each Item No-106 here-in-above MS heavy duty column Pipe 80mm Bore both ends flanged (3.0 Meter Long )
Rewinding stator of submersible motor of capacity 25/ 30 HP obtained from Item Ser No-106 here-in-above with water proof insulated copper wire of existing guage and size to achieve the specified / required RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete all as specified and as directed.
Rewinding stator of submersible motor of capacity 20 /22.5 HP obtained from Item Ser No-106 here-in-above with water proof insulated copper wire of existing guage and size to achieve the specified / required RPM including taking out old unserviceable winding , cleaning/ repairing damaged slots , complete all as specified and as directed.
Material and labour for PVC insulated and sheathed flat 3 core, Size 4 Sqmm copper stranded conductor water proof submersible cable 1100 Volts Grade , and connecting to submersible Motor pump set & starter securing with necessary clamps along the column Pipes including taking out old unserviceable cable complete all as specified and as directed.
Material and labour for PVC insulated and sheathed flat 3 core, Size 6 Sqmm copper stranded conductor water proof submersible cable 1100 Volts Grade , and connecting to submersible Motor pump set & starter securing with necessary clamps along the column Pipes including taking out old unserviceable cable complete all as specified and as directed.
Material and labour for PVC insulated and sheathed flat 3 core, Size 10 Sqmm copper stranded conductor water proof submersible cable 1100 Volts Grade , and connecting to submersible Motor pump set & starter securing with necessary clamps along the column Pipes including taking out old unserviceable cable complete all as specified and as directed.
Material and labour for PVC insulated and sheathed flat 3 core, Size 16 Sqmm copper stranded conductor water proof submersible cable 1100 Volts Grade , and connecting to submersible Motor pump set & starter securing with necessary clamps along the column Pipes including taking out old unserviceable cable complete all as specified and as directed.
Supply, laying , fixing , passing through pipe or cable tray PVC insulated & PVC sheathed unarmoured Multi core copper conductor 3 core 50 Sqmm 1100 Volts Grade cable confirming to IS 694 including including taking out old unserviceable cable connected from electric induction Motor to starter complete all as specified and as directed.
Supply, laying , fixing , passing through pipe or cable tray PVC insulated & PVC sheathed unarmered Multi core copper conductor 1 core 95 Sqmm 1100 Volts Grade cable confirming to IS 694 including including taking out old unserviceable cable connected from electric induction Motor to starter complete all as specified and as directed.
Supply, laying , fixing , passing through pipe or cable tray PVC insulated & PVC sheathed unarmered Multi core copper conductor 1 core 70 Sqmm 1100 Volts Grade cable confirming to IS 694 including including taking out old unserviceable cable connected from electric induction Motor to starter complete all as specified and as directed.
Scraping old paint of Electric induction Motor 150/125 HP Motor , NC Vertical/ Horizontall Split casing Pump , Suction , delivery Pipes, sluice valves , NRV Valves at Jalkendra , IMPH Pump House (Approx coverage area-10-15 Sqm) and Painting with one coats of red oxide paint and two coat of synthetic enameal paint of shade as directed by Engnr-in-Charge including writing Sm No. , MES No.complete as all specified and as directed
Scraping old paint of Electric induction Motor 75 HP Motor , NC Vertical/ Horizontall / Multi staging Pump , Suction , delivery Pipes, sluice valves , NRV Valves at Jalkendra (Approx coverage area-10-12 Sqm) and Painting with one coats of red oxide paint and two coat of synthetic enameal paint of shade as directed by Engnr-in-Charge including writing Sm No. , MES No.complete as all specified and as directed
Scraping old paint of Electric induction Motor 20/15 HP Motor , NC Vertical/ Horizontall / Multi staging Pump , Suction , delivery Pipes, sluice valves , NRV Valves at Jalkendra ,Swimming Pool, Rekhamari, (Approx coverage area-8-10 Sqm) and Painting with one coats of red oxide paint and two coat of synthetic enameal paint of shade as directed by Engnr-in-Charge including writing SM No. , MES No.complete as all specified and as directed
Scraping old paint of Electric induction Motor 10/7.5 HP Motor , NC Vertical/ Horizontal, Suction , delivery Pipes, sluice valves , NRV Valves (Approx coverage area-5-7 Sqm) and Painting with one coats of red oxide paint and two coat of synthetic enameal paint of shade as directed by Engnr-in-Charge including writing Sm No. , MES No.complete as all specified and as directed
S & F Cast Iron Foot valve of size 80mm to suction Pipe of Motor Pump set by disconnecting Lifting suction Pipe from shallow well/ UG Sump and fixing in Position after taking down existing unserviceable foot valve complete all as specified and as directed
S & F Cast Iron Foot valve of size 100 mm to suction Pipe of Motor Pump set by disconnecting Lifting suction Pipe from shallow well/ UG Sump and fixing in Position after taking down existing unserviceable foot valve complete all as specified and as directed
S & F Cast Iron Foot valve of size 150mm to suction Pipe of Motor Pump set by disconnecting Lifting suction Pipe from shallow well/ UG Sump and fixing in Position after taking down existing unserviceable foot valve complete all as specified and as directed
S & F Cast Iron Foot valve of size 200 mm to suction Pipe of Motor Pump set by disconnecting Lifting suction Pipe from shallow well/ UG Sump and fixing in Position after taking down existing unserviceable foot valve complete all as specified and as directed
S & F Cast Iron NRV of size 150 mm with gun metal seat PN 1.6 to delivery Pipe of Motor Pump set fixing in Position after taking down existing unserviceable NRV valve complete all as specified and as directed
S & F Cast Iron NRV of size 200 mm with gun metal seat PN 1.6 to delivery Pipe of Motor Pump set fixing in Position after taking down existing unserviceable NRV valve complete all as specified and as directed
S&F Cast Iron Diaphragm Valve of size 125 mm wheel type with necessary Nut, Bolts, Gasket, Washer, etc. including taking out old unserviceable one, complete all as specified and as directed.
S&F Cast Iron Diaphragm Valve of size 150 mm wheel type with necessary Nut, Bolts, Gasket, Washer, etc. including taking out old unserviceable one, complete all as specified and as directed.
Repair to water level indicator of OH Reservoir by replacement of brass float ball 300 mm dia 2mm thick mild steel pulley flexible steel wire rope from brass float ball to measuring key and painting to indicator with 2 coat of synthetic enamel paint and marking number, strip for measuring of water level at OHT with red/black/Yellow reflective type colour complete and all as directed by Engr-in-charge.
Desliting / Taking out accumulated Silt, Sand , Mud etc.,from Jack well of diameter 6.10 Metre and 12.20 Metre deep ( installed at Jalkendra & old pump house) through Manhole , removing the same to a distance not exc. 50 Metre, complete all as specified and as directed. Note : The contractor to monitor day to day and avoid damage of VT pumpset due to intake of sand/mud (accumulated into bowl assembly . If any damage occured, the contractor is fully responsible for repair the same without any extra payment.
Desliting / Taking out accumulated Silt, Sand ,Mud etc from Sand Trap of diameter 2.30 Metre and 3.00 Metre deep (installed at Jalkendra & Old Pump House) through Manhole, removing the same to a distance not exc. 50 Metre and depositing, complete all as specified and as directed.
Desliting / Taking out accumulated Silt, Sand ,Mud etc from Sand Catchment near River Bed Collection Chamber of Size 18.25 Metre x 4.57 Metre and 2.45 Metre deep , removing the same to a distance not exc. 50 Metre complete all as specified and as directed.
Desliting / Taking out accumulated sludge , Silt , Mud etc., from Flocculation Chamber, Flush mixing chamber , Clarifier Chamber , connected channels including scrapping down and cleaning internal surface of walls , Floors, Roofs, Mechanical Parts and cleaning blockage of wash out channels , pipes Drainage system etc. and removing the same to a distance not exc. 50 Metre complete all as specified and as directed.
Desliting / Taking out accumulated sludge , Silt , Mud etc., from Aeration Chamber installed at Jalkendra including scrapping down and cleaning internal surface of walls , Floors, Roofs, Mechanical Parts and cleaning blockage of wash out channels , pipes Drainage system etc. and removing the same to a distance not exc. 50 Metre and depositing complete all as specified and as directed. ,
Scrapping down , cleaning Internal Surfaces of Walls, Floors, Roofs, Drainage system etc of Under Ground Clear water sump ( installed at Jalkendra, IMPH ) of size 30.00x 30.00x 2.60 Metre including removing the accumulated sand/ silt from the chambers, depositing where directed at distance not exc. 50 Metre complete all as specified and as directed.
Scrapping down , cleaning Internal Surfaces of Walls, Floors, Roofs, Drainage system etc of Under Ground Clear water sump of size 15.00x 7.00x2.60 Metre ( installed at Old Pump House) including removing the accumulated sand/ silt from the chambers, depositing where directed at distance not exc. 50 Metre complete all as specified and as directed.
Scrapping down , cleaning Internal Surfaces of Walls, Floors, Roofs, Drainage system etc of Under Ground Clear water sump of size 9.25 x 5.60x 3.60 Metre ( installed at Lama Camp, Rekhamari Pump House ) including removing the accumulated sand/ silt from the Chambers, depositing where directed at distance not exc. 50 Metre complete all as specified and as directed.
Scrapping down , cleaning Internal Surfaces of Walls, Floors, Roofs, Drainage system etc of Raw Water Sedimentation Tank of Size 7.00 x 6.20 x 3.80 Metre ( installed at Lama Camp and Rekhamari Pump House ) including removing the accumulated sand/ silt from the Chambers, depositing where directed at a distance not exc. 50 Metre complete all as specified and as directed.
Scrapping down, cleaning all Internal Surfaces of Walls, Floors, Roof, Incoming & Outgoing Pipe Lines , etc of RCC Over Head Reservoir (located at Pratap Nagar OH Reservoir) of size 17.00 Metre dia and 4.60 Metre deep outer Chamber and height of staging 16 Metre including removing accumulated sand/ silt from the Chambers, depositing where directed at a distance not exc.100 Metreincl draining out of entire water from OH reservoir by opening of wash out valve after blocking the delivery mains of each of the two compartments with gunny bags or other suitable arrangements and washing the same completely, after washing disinfecting the whole reservoir with solution of potassium permaganate and applying one coat of cement wash to inner sides of the both of the compartments and removing blockage of the delievery mains & marking the date of cleaning with paints on reservoirs complete all as specified and as directed.
Scrapping down, cleaning all Internal Surfaces of Walls, Floors, Roof, Incoming & Outgoing Pipe Lines , etc of RCC Over Head Reservoir (located at Shivaji Nagar, ) of size 14.40 Metre dia and 3.95 Metre deep inner and 20.6 Metre dia and 3.5 Metre deep outer Chamber including removing the accumulated sand/ silt from the Chambers, depositing where directed at a distance not exc. .100 Metre incl draining out of entire water from OH reservoir by opening of wash out valve after blocking the delivery mains of each of the two compartments with gunny bags or other suitable arrangements and washing the same completly, after washing disinfecting the whole reservoir with solution of potasium permagnete and applying on ecoat of cement was to inner sides of the both of the compartments and removing blockage of the delievery mains & marking the date of cleaning with paints on reservoirs complete all as specified and as directed.
Scrapping down, cleaning all Internal Surfaces of Walls, Floors, Roof, Incoming & Outgoing Pipe Lines , etc of RCC Over Head Reservoir of capacity 50000 Gallons , 16.00 Metre staging height installed at AF Pump House , Army Avn Tech area , including removing the accumulated sand / silt from the Chambers, depositing where directed at a distance not exc. 100 Metreincl draining out of entire water from OH reservoir by opening of wash out valve after blocking the delivery mains of each of the two compartments with gunny bags or other suitable arrangements and washing the same completly, after washing disinfecting the whole reservoir with solution of potasium permagnete and applying on ecoat of cement was to inner sides of the both of the compartments and removing blockage of the delievery mains & marking the date of cleaning with paints on reservoirs complete all as specified and as directed.
Scrapping down, cleaning all Internal Surfaces of Walls, Floors, Roof, Incoming & Outgoing Pipe Lines , etc of Prestressed Steel Tank Over Head Reservoir 9600 Gallons to 12000 Gallon capacity , 16.00 Metre staging height installed at Lama Camp , Rekhamari Pump House and AF Pump House , including removing the accumulated sand / silt from the Chambers, depositing where directed at a distance not exc..100 Metreincl draining out of entire water from OH reservoir by opening of wash out valve after blocking the delivery mains of each of the two compartments with gunny bags or other suitable arrangements and washing the same completly, after washing disinfecting the whole reservoir with solution of potasium permagnete and removing blockage of the delievery mains & marking the date of cleaning with paints on reservoirs complete all as specified and as directed.
Desilting / taking out accumulated Silt ,Mud etc from Temporary open channels of size 1.50 Metre wide and 1.50 Metre deep , connecting from main stream of River Gabhru to Sand Trap near Jack Well at Jalkendra including removing the accumulated sand / silt from the Chambers, depositing where directed at a distance not exc. 50 Metre complete all as specified and as directed.
M & L preparation of previously treated/ old painted internal surface of under ground sump, Raw water sumps 'Flocculation Chamber Flush Mixture and clarifier chamber and applying one coat of black bituminous paint suitable for drinking water, complete all as specified and as directed.
M & L for make channel/ route for flow/ bring water from each river to collection chamber/ Jackwell at jalkendra by using T & p/manpower regularly or alternate day or as requirement to maintain uninterrupted supply of raw water to jackwell completed all as directed by Engr-in Charge
M & L for cutting / cleaning and removing of growing vegetation/ unwanted bushes inside installation area by using T & P or manpower when required all as directed by Engr-in-Charge
M L for preparation to CI/DI MS rising, distribution, overflow, wash out and suction pipe line of any size in vertical/ horizondal position and painting two coat of super enameled black or sky blue paint over a coat of red oxcide duly marked inlet/outlet direction, overflow/ washout at various water supply installation/ OHT at any height/ staging under GE Missamari all as directed by Engr-in Charge. Note: The contractor to be quoted the rate incl for making arrangement for stage/ ladder for painting work.
M & L for preparation of valve pit chamber cover for and angle iron of any size two coat of super enameled black paint over one coat of red oxcide all as directed.
M & L for preparation to sluice/release/NRV Valves of size 300/250 mm dia for two coat of super enameled black paint over one coat of red oxcide all as directed.
Supply only grease for lubrication of bearings AP 3 moving parts of motors/pumpsets/chain pulleys etc make- Castrol/HP/SKF/BOSCH complete all as specified and directed by EIC.
Supply only Copper lugs of size 6/10/16/25/35/50 sqmm for connection of starters Copper cables at various water supply installations complete all as specified and directed by EIC.
Supply only aluminium lugs of size 50/70/95/120/150/185/240/300 sqmm for connection of starters at various water supply installations complete all as specified and directed by EIC.
Supply only PVC hose pipe of size 80 mm for sludge/ dewatering pump at jalkendra water supply installation complete all as specified and directed by EIC.
M&L Cast Iron Sluice Valve 250 mm bore (dia), comply with IS:14846-2000, Class PN-1.6, both Ends Flanged, having Gun Metal Working Parts, Stainless Steel Spindle with Cast Iron Hand Wheel with all necessary fixing Arrangements such as Gaskets, Mild Steel Nuts, Bolts, Washers, etc. and testing including taking down unserviceable Sluice Valve,complete all as specified and as directed by Engr-in charge.
Supply and fabrication of MS chesis/ base frame of motor pump set 150 HP ( as per existing size and shape) including dismentaling of old existing installed at old pump house, lama camp, rekhamari,AROP and jalkendra pump house.
Supply only Brass bar/ block for making of brass bushing as per existing size for existing housing of various pump sets, induction motor and submersible pump complete all as specified and directed by EIC
Supply of JCB/Fork land for removal of silt in the open drain from Ghabharu River to sand catcher at Jalkendra all as specified and directed by EIC Note:- (a) No seprate payment for driver included in the quoted rate of item (b) No additional charges will be paid for the T&P required. (c) No additional charges will be paid for Fuel, coolant or fan belt, lubrication or other accessaries.
Supply and fixing LED aviation abstruction light double headed 100W including fixing arrangement using minimum 2 mtr Height of medium grade GI pipe 50 mm complete all as specified and directed by EIC Make- Bajaj model no. BJAOL2BC or equivalant Make of PHILIPS/CG/HAVELLS
Supply and fixing Plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachment complete all as specified and directed by EIC
Supply and fixing of Air termination, single pointed aluminium rod 12mm dia and 300 mm longcomplete all as specified and directed by EIC
Supply and fixing of Test point terminal block made of gun metal or phosphorus bronze size 75x75x25mm drilled and screwed including 3 nos. 8mm dia 25mm long hex. head screw all as specified and directed by EIC
Supply and fixing of Aluminium strip 25 x 3.15mm with saddles and fixing screws etc by using porcelain insulator at a distanc of min 1 mtr . for roof conductors and down conductors above ground longcomplete all as specified and directed by EIC
Supply & Laying LT UG XLPE cable of size 2 core x 6 sq mm laid in trenches/ floors/ on wall/ service connections PVC insulated, sheathing and armoured 1100 volts grade with aluminium conductor with necessary end terminal/ cable gland as per site requirement including connecting to the main switches/ cut outs MCB/ MCCB with necessary lugs after cutting to required length of cable all as specified and directed.
Excavation in trenches n exc 1.50 m wide and n exc 1.50 m depth in soft /loose soil and getting out for lying of cable and errection pipe etc complete all as directed.
Returning, filling in, trenches in soft /loose soil including spreading, leveling, watering and well ramming in layers not exc 25 cm complete all as directed.
Removal of excavated soil to a distance n. exc 50 m and depositing where directed at a level n.exc 1.5 m above the starting point complete all as directed.
M & L sand cushioning in trenches for cable protection with coarse sand laid dry in trenches with uniform thickness including consolidation complete all as directed.
Supply & Laying well burnt brick , locally available best quality (sub class "B" bricks ) laid in trenches perpendicular to UG Cable protection complete all as specified
Material and Labour for Earthing complete with Galvanised Steel Earth Plate Electrode 600 x 600 x 6mm, thick buried directly in ground ( earth pit not less than 2.25 Metre deep below the Ground Level ) with Top Edge of Earth Plate not less than 1.50 Metre deep below normal ground level , connected to Galvanised steel iron strip earth lead 32x6 mm by means of Bolts, Nuts, Check Nuts and Washers made of Galvanised Iron 20 mm dia GI Pipe (Med grade) for watering, 40 mm dia GI Pipe light grade for protection of earth strip,including necessary earth work in any type of soil , PCC (1:3:6) Type C1 Concrrete pit RCC (1:1.5:3) Type A1 Precast cover (54x54x5Cm) duly reinforced with including 8mm Dia TMT Bar @ 150 mm c/c both ways lifting handle made of 8mm dia TMT Bar embeded in precast cover slab complete as shown in electrical Plate No 3 of SSR Part-I including testing on completion complete all as specified and as directed.
M&L for Cement Concrete 1:2:4 type B2 (40mm graded coarse aggregate) as in Foundation for 150 HP IRP pump motor, Filling, Mass Concrete and using 10 mm TMT bar having centre distance between bars not more than 100 mm etc including dismantling of old foundation, complete all as specified and as directed.
Testing of raw and treate water sample collected from different pump houses (10 samples out of which 05 Nos for Raw water and 05 Nos for treated water sample) ( i.e. AF PH, Lama camp PH, Rekhamari PH, old pump house, Jalkendra) for all parameters covering complete chemical and bacterilogical test fromr any Govt approved/recognised lab as approved by the GE and the test report of samples should be submmite to GE office with in 15 days of sample submitted to lab. complete all as specified and as directed. Note:- (i) The Water test should be carried out at quarterly basis. (ii) The testing parameters will be as per norms decided by Eng - in- Charge Notes:- (i) A Non functional/daysfunctional/defective pumpset or motor/ clarifloculator and associated parts/electrical accessories are to be repaired within 5 days of intimataion of defect by "Engr-in-Charge" to the contractor. In case of failure to comply to this condition, the contractor shall be lible to pay fine of Rs 15000.00 per delayed days. (ii) In case of deviation of coarse of river/excessive silting/flooding, corrective action including chage of coarse of river/de-silting etc in order to supply water to Central Pumping Station (Jalkendra) is to be accomplished within 6hrs of intimation of such occurrence by Engr-in-Charge to the contractor. In case of failure to comply to this conditon, the contractor shall be liable to pay fine of Rs 2500.00 per delayed hrs.
Maa Mira Enterprise
M/S S.S.Corporation
Sunrise Enterprise
United Traders
M/S Mahabir Traders
Markson
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .