Tender Value
₹12.0 L
EMD Value
₹12,000
Closing Date
7 Sept 2026, 6:00 pm
PRAVINBHAI HADIYAL
Fixing /Maintenance of Paver Block/ Stone Paving Work at Excavated area of laying Water pipe line/ Drainage Line at Arbudanagar Area, Ram Rajynagar Area of Different Main and Internal T.P. Road and Chali/ Slum area in Indrapuri Ward. (ARC Tender)
339944
E Tender Notice No.5/2026-27 T No.218
Open
Civil - All
Works
Ahmedabad
₹900
MUNICIPAL COMMISSIONER, AHMEDABAD
₹12,000
29 Aug 2026
29 Aug 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
Name of work: - Fixing /Maintenance of Paver Block/ Stone Paving Work at Excavated area of
laying Water pipe line/ Drainage Line at Arbudanagar Area, Ram Rajynagar Area of Different
Main and Internal T.P. Road and Chali/ Slum area in Indrapuri Ward. (ARC Tender)
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting e-Tender
Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from interested
contractors for the following work within the limit of A.M.C.
1 Name of work Fixing /Maintenance of Paver Block/ Stone Paving Work at Excavated
area of laying Water pipe line/ Drainage Line at Arbudanagar Area,
Ram Rajynagar Area of Different Main and Internal T.P. Road and
Chali/ Slum area in Indrapuri Ward. (ARC Tender)
2 Tender Amount Rs.11,99,461.35 (excluding of GST). GST will be paid extra by
(Estimate put to Tender) AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.900.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
Tender Fee shall be submitted physically along with the Physical
4 Time Limit 12 Months.
5 Download of Tender Complete bid documents can be downloaded with effect from
Documents Dt.11/08/2026 up to 18:00 Hrs. from the website
www.tender.nprocure.com.
6 Required registration Register “E-2” class having “Building Or Road category" in PWD in
Govt. R&B/CPWD/AMC or equivalent register with any other state
Govt. or institutions.
7 Earnest Money Deposit (Bid 1 % EMD of Estimate put to tender (Demand Draft / pay order / Bank
security) Guarantee in favour of Municipal Commissioner, Ahmedabad is to be
(1 % of Estimate put to submitted as prescribed in 10.0 below. Demand Draft/Bank Guarantee
tender) shall be from approved list of AMC of banks and the issuing branch of
bank guarantee shall be of Ahmedabad city only and it should be valid
for 180 days from the last date of tender submission. E.M.D. shall be
submitted physically along with the Physical Submission.
8 Submission of EMD and Tender Fee & EMD should Submitted physically on Date.08/09/2026
Tender Fees up to 16.00 hrs. along with tender documents as described in the
invitation of tender should be submitted to to Assistant Manager/
Dy.C.E.(S/Z) office, 2nd Floor, South Zone Office, Opp. Fire Station,
Maninagar, Ahmedabad-380008
9 Mode of sending the The whole tender shall be submitted by two mode.
Tender • Whole tender shall be submitted only on
Documents www.tender.nprocure.com website before Date:-07/09/2026 up
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope on or before
Date.08/09/2026 up to 16.00 hrs. (by hand
Delivery/Courier/Speed Post/Registered)
10 Last date of online Date.07/09/2026 up to 18.00 hrs.
submission of tender
11 Submission of Price Bid The Price bid shall be submitted online only. It shall not be submitted
12 Opening of Technical bid To be intimated after technical bid evalution to Assistant Manager/
Dy.C.E.(S/Z) office, 2nd Floor, South Zone Office, Opp. Fire Station,
Maninagar, Ahmedabad-380008
13 Tender validity period 120 days from the last date of submission of Tender.
Ahmedabad Municipal Corporation
14 Security Deposit 5 % of Contract Value to be submitted in the form of Bank Guarantee.
Bank Guarantee shall be from approved list of AMC of banks and the
issuing branch of bank guarantee shall be of Ahmedabad City only.
The validity of the Security Deposit shall be up to valid till 90 days
beyond Date of completion of work. The Security Deposit shall be
payable in 15 days from date of receipt of LOI failing which interest
@4% per annum will be charged by AMC.
15 Defect liability period The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed before
the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case of
failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the
whole or any part of the amount of security deposit towards the
expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under
(a) for all works costing upto Rs. 50,000 ( amount put to tender), the
period shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified
date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
12 months from the certified date of completion which should include
(d) For building works, the period specified in (a), (b) or (c) above OR
elapse of monsoon period following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon period,
the 30th September may be treated as the last date.
16 GST Rates Quoted by the contractor to be inclusive of all applicable taxes
(Excluding GST). Prevailing GST will be paid extra.
17 During execution of works and in defect liability period, in any case if any fatal accident (major or
minor) occurs due to poor work and poor safety precautions, then it will be completely contractor’s
responsibility and compensation for the same has to be paid by contractor. During execution of
works if any news is published in print/Electronic/Social media regarding inferior quality of work and
poor safety precautions, and due to inferior quality work any fatal injuries occurs, all the losses due to
such accidents and expenses of legal matters shall be borne by contractor.
Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case
authorized signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be
considered non-responsive.
In the event of the specified date of bid submission/opening being declared a holiday for the Employer, the bids shall be
received /opened on the next working day at the same place and the same time.
Seal and Signature of the Bidder Add.City Engineer
Date: Ahmedabad Municipal Corporation
Ahmedabad Municipal Corporation
As per account department(A.M.C.) circular no. 03 Dt.28/04/2023 Bank
guarantee of said work must be of Ahmedabad city branch, which mentioned as
C. Guarantees issued by following banks will be accepted as SD/EMD on
permanent basis.
All nationalized Banks
D. Guarantees issued by following banks will be accepted as SD/EMD for
theperiod up to March-31, 2024. The validity cut-off date in the GR is with
respect to the date of issue of Bank Guarantee irrespective of the date of
termination of Bank Guarantee.
1Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance Bank
7. Federal Bank
10.IndusInd Bank
11.Kotak Mahindra Bank
12.Standard Chartered Bank
13.Tamilnadu Mercantile Bank
14.Bandhan Bank
18.Karnataka Bank
19.Krur Vysya Bank
20.South Indian Bank
21.Utkarsh Small Finance Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10.The Surat Peoples Co-operative Bank
11.SVC Co-operative Bank LTD.
Ahmedabad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
œrûtK Ítul Ítulj ytuVem,
~gtbt«mtœ bwFSo CJl bKeldh Vtgh MxuNlle mtbu,htbctd, brKldh, ybœtJtœ.
œrûtK Ítul xuLzh ltuxem lk-SZ- E Tender Notice No.05/2026-2027 /2022-23
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg
vwhtJt mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^
fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc< yJ~g
œNtoJJtlt hnuNu. su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf
fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch
yJ~g jFJtltu hnuNu.
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe
<vtm fhelu s xuLzh btufjJw.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe
zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc
GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc
dK<he fhe xuLzhtu ChJtlt hnuN.u
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the latest correction slips may be referred for quality of
construction & standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall
be taken to mean as reference to the latest edition of the same of force on the date
4. In "Mode of measurement" in the specifications wherever a dispute arises in the
absence of specific mention for a particulars point / aspect, the same in the relevant
Indian Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth)
or thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or
elucidate in its specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or
AMC's Consultant shall not absolve the contractor from the responsibility of
replacing defective materials brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the
Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant
shall be removed from the site of work within 24 hours.
Ahmedabad Municipal Corporation
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as
well as for checking lines, levels, alignment of the works & all precautionary
measures during execution shall have to be kept in sufficient numbers and in good
working condition at the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and
completion of work to the required strength and quality. Acceptance of the same by
the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the
course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed
under the "Minor Mineral Act", and such other laws and rules prescribed by the
Government from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease
looking to the quantum of actual work for which no any claim shall be entertained
17. Contractor shall have to execute extra item if required only after necessary
permission from AMC.
18. The work in general shall be carried out as per standard specifications of the
relevant items to be executed & as per the instruction of Engineer in charge & as
per the guidance of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be
binding on the contractor. The contract agreement shall have to be executed
between AMC & the agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written
work order to the contractor after fullfillng the formality life SD & Agreement. No
time extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the
interpretation given by Additional City Engineer /Dy.M.C of A.M.C. will be final
and binding to the Contractor.
22. The contractor shall take no advantage of any apparent error or omission in
drawing or specification and the Engineer -in-charge shall make such corrections
and interpretations as necessary to fulfill the intent of the plants and specifications.
Ahmedabad Municipal Corporation
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the
Municipal Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or
labour shall be paid.
26. Contractor is requested to see the site physically before tendering. He is also
requested to quote the rates keeping in view of all the points mentioned in relevant
pages of tender documents.
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of
piped water for the construction of the works and provide a satisfactory supply of
potable water for drinking, washing, sanitation and cleaning down. The contractor
will be responsible for all the costs where applicable of connection, meter
installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system
around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and
the contractor must make his own arrangements with the Corporation and
Electricity Supply Authorities and with other contractors to connect and to take a
supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the
site for purpose of the work and shall pay such charges as is fixed by the
appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff,
machineries and for use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also
to submit the income tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized
Government approved licensed electrical person or firm in appropriate category in
accordance to contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives
issued by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work
changes & thereby total amount of work increases/ decreases.
changes & thereby total amount of work increases/ decreases.
Ahmedabad Municipal Corporation
(ii) If the work gets delayed/ postponed for some administrative/ technical
decision what so ever.
34. In case of any dispute, decision of Municipal Commissioner shall be final and
binding on the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in
any respect will be rejected. Municipal Commissioner reserves the right to
increase/decrease the scope of work. No any claim to that effect shall be
entertained. The Municipal Commissioner also reserves the right to reject any or all
the tenders without assigning any reason thereof.
36. The contractors are requested to quote their rates considering above tender
37. The contractor shall have to paid balance Security Deposit within 10 days from the
date if issue of Letter of Interest (LOI). And after paying the balance S.D. the time
limit will be started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the
rate of 0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, if work is not started because of monsoon or
any other special reason (like site is not available), after evaluation of situation the
actual date of starting of work will be consider after approval of Dy.M.C. (South
38. The Contractor shall not claim for increase or decrease in the quantity of the item
or the scope of work.
39. The payment shall be made as per the A.M.C policy for the work done by the
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per
guidelines published by WHO/ Center government/State government /Ahmadabad
municipal Corporation.
Ahmedabad Municipal Corporation
SLA Breach and Penalty Clause for Road & Footpath Complaints
1. Complaint Resolution within SLA:
The Contractor/ Agency shall attend to and completely resolve all complaints related to Road and
Footpath works within the prescribed Service Level Agreement (SLA) time limit mentioned in the
tender. The SLA period shall be calculated from the date and time of registration/allotment of the
2. SLA for Road & Footpath Complaints:
િનભાવના કાયની આવતી સી.સી.આર.એસ, ફ રયાદો ની કામગીર SLA (Service Level Agreement) િપર યડમાં
િનકાલ ફર યાત કરવાનો થાય છે જો આવેલ ઓનલાઈન સી.સી.આર.એસ. ફ રયાદનો તેના SLA (Service Level
Agreement) િપર યડમાં િનકાલ કરવામાં ન હ આવેતો નીચે જ
BUILDING CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Public Building No Water Supply in Public Building 24 Hours
2 Public Building Public toiles and urinals-repairing of doors, 360 Hours
windows, tiles, ceiling, plaster and others
3 Public Building Muni. school repairing and other maintenance 168 Hours
Ahmedabad Municipal Corporation
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Water>>Engineering Inadequate water or low inflow pressure-Eng 240 Hours
2 Water>>Engineering Leakage In pipe Line-Eng 48 Hours
3 Water>>Engineering Water quality-polluted water-Eng 24 Hours
4 Water>>Engineering No Water Supply-Eng 240 Hours
5 Water>>Engineering Water-other 72 Hours
DRAINAGE CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Drainage Engineering No Drainage Machine hole Cover-Eng 24 Hours
2 Drainage Engineering Frequent Breakdown & Blockage Of Drain- 96 Hours
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Road Pot holes on the road 24 Hours
2 Road Patch work Relaying of a portion of road 72 Hours
3 Road Deep pit-large Settlement of road 48 Hours
4 Road Removing of waste-Dust laying on both side of 72 hours
the road after resurfacing
5 Road Road Other 48 Hours
6 Footpath Road-Footpath Repairing 168 Hours
3. Penalty for Breach of SLA:
If any complaint is not completely resolved within the prescribed SLA period, the same shall be treated
as SLA Breach and the applicable penalty mentioned above shall be imposed on the Contractor/Agency.
4. Additional Penalty for Continued Delay:
If the complaint remains unresolved even after expiry of the SLA period, the applicable penalty shall be
recovered for every additional 24 hours or part thereof until the complaint is completely rectified and
verified by the concerned Engineer/authorized officer.
5. Actual Resolution and Verification:
Temporary barricading, placing of material, or initiation of work shall not be considered as resolution of
the complaint. The complaint shall be considered closed only after the required work is completed and
the same is verified by the concerned Engineer/authorized officer.
6. No Exemption on Account of Delay:
The Contractor/Agency shall not claim exemption from penalty merely on the ground that the work has
been started. In case the complaint continues to remain unresolved beyond the prescribed SLA, penalty
shall continue to accrue until satisfactory completion of the work.
7. Recovery of Penalty:
The penalty amount shall be recovered from the Contractor's running bill/final bill/security deposit or
any other amount payable to the Contractor by the Municipal Corporation, without prejudice to any
other action permissible under the tender/contract conditions.
Ahmedabad Municipal Corporation
8. Reopened/Unsatisfactory Complaints:
If a complaint is closed without satisfactory rectification and is subsequently reopened by the
complainant, the same shall be treated as an unresolved complaint and the applicable SLA/penalty
provisions shall continue to apply.
9. Repeated Delay:
In case of repeated failure to resolve complaints within the prescribed SLA, the Municipal Corporation
shall have the right to issue a warning/show-cause notice and take further contractual action, including
withholding of payment, recovery of additional expenditure, or other action as per the terms and
conditions of the tender.
10. Exceptional Circumstances:
Any extension of SLA shall be considered only in genuine circumstances beyond the control of the
Contractor and shall require prior approval Engineer In-charge. No extension shall be considered merely
due to shortage of labour, machinery, materials, traffic arrangements or other resources under the
Contractor's responsibility.
Signature of contractor with seal Add City Engineer(S.Z)
Date Ahmedabad Municipal Corporation
Ahmedabad Municipal Corporation
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One
Hundred Twenty Calendar days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful
tender shall furnish to the Corporation Security Deposit of 5% (five percent) of the
contract price cheque or Bank Guarantee, pay order, or demand draft of Nationalized
Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE Add.City.ENGINEER
& STAMP (South Zone)
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month after the order to start the works. Progress of work should
be in proportion to time limit.
responsible for Workmen’s compensation if any accident. The contractor shall arrange for barricading
at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any damage to
public, If any incident happen, during the execution of work. In case of dispute for unseen or overlooked
items the decision of the Dy.City Engineer shall be final. The contractor shall have to give site clean of all
rubbish during the work and at the time of completion of work and hand over the site with final finishing of
the work as directed. All the rejected materials shall be removed from site within 24 hours by contractor at
this risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and
he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg.
shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for extra
rate for subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders
for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during
the period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of
his tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice
to any right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the
penalty of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable
to the contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form
B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat
booklets of Building Works & and Road Works Specifications published by Gujarat Book Depot,
Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (South Zone)
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmrvj ftuvtuohuNl
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE
ytExbltu CtJ J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu.
<uJe >huf ytExbbtk J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle
J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu
bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e
fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t
l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t rlgb bwscle vulÕxe ftb ck^
hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
ftuLx[tfxhle mne yuzeu.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
Ahmedabad Municipal Corporation
Ahmedabad Municipal Corporation
GENERAL TECHNICAL SPECIFICATION SECTION
Following technical specifications shall be applicable to the relevant items of BOQ
Dismantling the following including loading, unloading and disposal of unserviceable material for
all lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling
the resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material and disposal of unserviceable material with all lead and lifts.
c. Demolition & disposal of unserviceable material with all lead and lift for unreinforced
d. Demolition of brick work & stone masonry including stacking of serviceable materials
and disposal of unserviceable materials with all lead and lift (1) In cement mortar.
e. Demolition including stacking of serviceable materials and disposal of unserviceable
materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or shown
in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in
which the structure was constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work
or property, which is to be left intact, before dismantling and demolishing is taken up and the work
shall be carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled
first. The dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall
be kept in safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits,
unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b)
Ahmedabad Municipal Corporation
Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out to
the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling
including scaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materials properly and disposing the unserviceable materials with all lead and lift. The
rate also includes for temporary storing for the safety of the portion not required to be pulled down
or of adjoining property and providing temporary enclosures or partitions where considered
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on
mortars shall be done Dismantling implies carefully taking up or down or these are fixed by nail
screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall
include stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
(A) Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work
and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
removing manhole cover and debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Relevant specification shall be followed as per item description : Repairing damaged M.H. and rasing
M.H. up to road level incl. removing damaged brick work and repairing by brick masonry in C.M. 1:5
and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from
MH and carting the same as directed.
The measurement shall be in Nos. basis Manhole.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and removing existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
Relevant specification shall be followed as per item description : Repairing damaged I.C./ Raising
removing damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing chamber sheet cover, removing the debris from chamber and carting the
same as directed.
The measurement shall be in Nos. basis of I.C.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated
rock, fly ash, aggregates of any kind Including spreading & levelling etc. complete.
• (a)Lead Upto 1 Km.
• (b)Lead From 1 Km to 2 Km.
• (c)Lead From 2 Km to 3 Km
• (d)Lead From 3 Km to 4 Km
Ahmedabad Municipal Corporation
• (e)Lead From 4 Km to 5 Km
• (f)Lead From 5 Km to 10 Km
• (g)Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of
200 meters or as per instruction given by Engineer in charge. Useful materials obtained from clearing
site and excavation shall be stacked and used within the work site. Internal conveyance above 200 mt
within the work site i.e. From starting chainage to End chainage of a given road WILL NOT BE PAYABLE.
Materials suitable for construction of Embankment, earthen shoulder and subgrade shall be stacked at
convenient places within a work site for reuse. No extra payment will be paid to the contractor for
stacking of earth within the work site and reused for the construction of Embankment layer, sub grade
and earthen shoulder purpose. Only surplus earth shall be disposed off outside the work site as per
instruction given by Engineer-In-charge. Useful stones from rock excavation shall be stacked nearly
within a lead of 50 M. and will be allowed to be used by the contractor on payment at rates laid down
in the contract or if not so aid down, at schedule of rates of the Division or at a mutually agreed rates if
there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a
particular stretch of given road will be paid in this item as per instruction of Engineer in charge. No
bulkage of disposed earth will be considered for the payment.
The rate shall be for a unit of one cubic meter.
Barricading the entire break down or excavated area on rental basis sing wooden ballies / M.S.
angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside to avoid
accident & for smooth traffic diversion & movement including cautionary board etc. Item also
includes for making temporary sufficient Nos. of lighting arrangement throughout the work with
necessary required arrangement. The same shall be removed after completion of work. OR as per
the instructions of Engineer in charge.
1. The relevant specifications as given in items shall apply to this item.
2. The measurement shall be in Rmt. area of barricading for barricading sheet with proper
numbering, structural steel, with necessary excavation, concrete base etc including painting.
Retro reflective work and blinkers shall be paid in relevant item.
3. The rate includes labour, material, equipment, shifting of barricading as per requirement of
progress of work and removal the same after completion of work. (All material will be the
property of the contractor after completion of the project).
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
a. F.R.C. Extra Heavy Duty (EHD-35) Machine hole Covers. Cover : 728mm ø & 100 mm thick circular
cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar for lifting the
cover & should be fitted with plastic cups.
Cover shall be well casted and having good finishing. It shall be made from M300 grade.Concrete
with more than 0.5% fiber by weight of concrete as mention in IS:12592:2002. Three coats of Black
bituminous / anticorrosive paint must be applied on back side of covers. Each cover and frame shall
be marked with manufactures trade mark / loading grade, month and year of manufacturing
(marking shown in IS:12592:2002). The cover should be embossed with chequered design.
Ahmedabad Municipal Corporation
Transportation expenses will be borne by the contractor. IS:12592:2002 shall be followed for
Production and Testing of Frame and cover. The sectional weight of concrete of each item should be
The rate shall be for a unit of per Nos.
Carting and Fixing M.H., Chamber or Catchpit Seat and Cover in line and level to match existing
road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as
directed. M.H. seat cover will be supplied by A.M.C. (from any store) .
The rate shall be for a unit of per Nos.
Providing and fixing cast iron machine hole frame of weight 80 to 85 kg suitable for existing EHD-35
FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and level to match
existing road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
The Item shall be carried as per Item mentioned in tender document and as per instruction of
Engineer-in-Charge and/or his authorized representative.
The mode of payment for this item shall be on Kgs. Basis based on actual weight of Machine hole
Catch Pit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As
directed by Engineer-in-Charge and/or his authorized representative.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral Technical
Specification for building works.
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shall also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Box cutting the road surface to proper slope and camber for making a base for road work including
removing the excavated stuff and depositing on the road side slope as directed upto 200Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such
ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so
obtained shall be property of the Government and be conveyed and stacked as directed. within 200 M.
lead. The roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be
Ahmedabad Municipal Corporation
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall
assume full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the reference marks and bench
marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and
depth as shown in the drawings or as directed. The contractor shall do the necessary shoring and
shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paid separately if not specified. The bottom of the excavated area
shall be 1 evened both longitudinally and transversely. as directed by removing and watering as
required. No earth filling will be allowed for bringing it to level, if mistake or any other reason
excavation is made. deeper or wider that shown on the plan or directed. The extra depth or width shall
be made up with concrete of same proportion as specified for the foundation concrete at the cost of
the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the
ground in layer including ramming and watering etc. The balance of the excavated quantity shall be
removed by the contractor from the site of work to a place as directed with lead upto 200 M. and all
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of
trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall
be made for surplus excavation made in excess of above requirements or due to slopping and sloping
back as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Filling available excavated earth (excludingrock) intrenches. plinth,sides of foundations etc. Inlayers
not exceeding 20cm. Indepth consolidating each disposited layer by ramming and watering.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative. refer R & B Department booklet for General Technical Specification for
building works.
The mode of payment for this item shall be on CMT. Basis.
Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat
aggregates 40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 5 parts of coarse sand, 10 parts of hand broken stone
aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the
site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
Ahmedabad Municipal Corporation
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and
finished within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall
be laid in layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and
rapidly to get the required compaction and to allow all the gaps to be filled with mortar. After the final
set, the concrete shall be kept continuously wet, if required by pounding for a period of not less than
days from the date of placement The concrete shall be measured for its length breadth and depth,
limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Hand broken stone
aggregates 40mm nominal size) and curing complete
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 3 parts of coarse sand, 6 parts of hand broken stone
aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the
site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and
finished within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall
be laid in layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and
rapidly to get the required compaction and to allow all the gaps to be filled with mortar. After the final
set, the concrete shall be kept continuously wet, if required by pounding for a period of not less than
days from the date of placement The concrete shall be measured for its length breadth and depth,
limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to achieve the desired density etc complete.
Production & Supply of WMM to site of works
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material, premixed with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing
pavement as the case may be in accordance with the requirements of these Specifications. The
material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on
the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When
vibrating or other approved types of compacting equipment are used, the compacted depth of a
single layer of the sub-base course may be upto 200 mm with the approval of the Engineer.
Ahmedabad Municipal Corporation
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements
set forth in Table 19-1. Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test
shall be carried out on the material delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and Elongation IS:2386(Part-1) 35 percent (Max.)*
indices (Total)
* To determine this combined proportion, the flaky stone from a representative sample should
first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone
sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal.
Elongation index is weight of elongated particles divided by total non-flaky particles. The values of
flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary
from the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be
prepared to the specified grade and camber and cleaned of dust, dirt and other extraneous material.
Ahmedabad Municipal Corporation
Any ruts or soft yielding places shall be corrected in an approved manner and rolled until firm surface
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including
depressions and potholes shall be repaired and made good with the suitable material. The existing
surface shall be scarified and re-shaped to the required grade and camber before spreading the
coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having
provision for controlled addition of water and forced/positive mixing arrangement like pugmill or pan
type mixer of concrete batching plant. For small quantity of wet mix work, the Engineer may permit
the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than
agreed limit. The mixed material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared
subgrade/sub-base/base in required quantities. In no case should these be dumped in heaps directly
on the area where these are to be laid nor shall their hauling over a partly completed stretch be
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-
Charge and/or his authorized representative. For portions where mechanical means cannot be used,
manual means as approved by the Engineer shall be used. The motor grader shall be capable of
spreading the material uniformly all over the surface. Its blade shall have hydraulic control suitable
for initial adjustments and maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it
is spread without rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished
surface is free from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports
remedied by removing or adding aggregate as may be required. The layer may be tested by depth
blocks during construction. No segregation of layer and fine particles should be allowed. The
aggregates as spread should be of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be
uniformly compacted, to the full depth with suitable roller. If the thickness of single compacted layer
does not exceed 100 mm, smooth wheel roller of 80 to 100 kN weight may be used. For a compacted
single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of minimum
static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower
edge and progress gradually towards the upper edge. Thereafter, roller should progress parallel to
the centre line of the road, uniformly over-lapping each preceding track by at least one third width
Ahmedabad Municipal Corporation
until the entire surface has been rolled. Alternate trips of the roller shall be terminated in stops at
least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward
until the edges have been firmly compacted. The roller shall then progress gradually towards the
centre parallel to the centre line of the road uniformly overlapping each of the preceding track by at
least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other
cause shall be corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanical tampers or a plate compactor. Skin patching of an area without scarifying
the surface to permit proper bonding of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like
motion in the sub-base/base course or subgrade. If irregularities develop during rolling which exceed
12 mm when tested with a 3 metre straight edge, the surface should be loosened and premixed
material added or removed as required before rolling again so as to achieve a uniform surface
conforming to the desired grade and crossfall. In no case should the use of unmixed material be
permitted to make up the depressions. Rolling shall be continued till the density achieved is at least
98 per cent of the maximum dry density for the material as determined by the method outlined in IS :
After completion, the surface of any finished layer shall be well-closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks and loose material. All loose,
segregated or otherwise defective areas shall be made good to the full thickness of the layer and
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam
surface till it has dried and the wearing course laid.
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of One test per 200 Cu.m. IS:2720, Part-V
portion of aggregates
of compacted One set of three tests per IS:2720, Part-VIII
layer 1000 sq.m
Ahmedabad Municipal Corporation
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or
where the course is otherwise defective due to subgrade soil getting mixed with the aggregates, the
full thickness of the layer shall be scarified over the affected area, reshaped with added premixed
material or removed and replaced with fresh premixed material as applicable and recompacted. The
area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall
depressions be filled up with unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall
take all necessary measures for the safety of traffic during construction and provide, erect and
maintain such barricades, including signs, marking, flags, lights and flagmen as per instruction of the
Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing TMT Bar FE500D reinforcement for R.C.C. Work including bending,binding and placing
in position complete upto floor two level.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative.
Mode of measurements shall be on Kg basis.
Providing, fabricating, assembling, hoisting / erecting and fixing in position structural steel work at
all heights/ all levels/ all shapes & sizes with all leads & lifts using any type of section like MS Rolled
Steel Sections, Hollow sections, Tubular Sections, MS Plates, Chequered Plates etc. all confirming to
latest relevant IS codes for the work of steel structures railings, signage pole, jali, gates, Bus shelter,
screen wall, smart pole, commercial pole, gantry structure, grills, bracings, bollards, foundation
plate and bolt, platforms, brackets, cattle trap, framing for advertise box on lighting pole, electrical
elements etc. including straightening, cutting, bending, bolting and welding the members all as per
structural drawings and as per detailed specifications (for materials & workmanship) including
necessary scaffolding/ staging, anchor fasteners etc. complete in the situations described
hereinafter and comprising of :
) Profile Cutting of components to required lengths/ widths and shapes/ profiles;
ii) Smooth grinding / machining of edges / faces / all welding joints;
iii) Necessary welding (electric arc welding) for required weld lengths and sizes shall be carried
out by qualified welders.
iv) The fabrication work shall start only after approval of the fabrication drawings. Any change
required in the fabrication drawings shall be carried out at no extra cost. Fabrication shall be in
a perfect Architectural workmanship manner and as provided in Section V & VI of IS 800 & IS
v) Electrodes for welding, the procedure, selection, test and inspection shall confirm to
provisions in IS816, IS818, IS822 & IS823.
vi) Erection / hoisting shall commence only after approval of fabricated parts by the Engineer in
vii) Necessary arrangements of templates to keep the foundation bolts in position, shall be made
by contractor without any extra cost.
Ahmedabad Municipal Corporation
viii) The rate shall include for applying two or more coats of approved make and shade PU paint
over two coat of anti corrosive epoxy base primer, as per instructions. In case of CNC work, extra
cost of CNC work shall be paid in relevant tender item.
Materials & Workmanship :
1.1 Prior to fabrication, all tubular/ rolled sections/ plates shall be cold straightened and freed from
twists, wraps etc. Hot working shall be done only after prior permission of the Engineer-incharge. The
surface of the members to be welded shall even so that temporary fastening alignment should not
allow passage of a 0.2 mm thick filler gauge more than 20mm. deep from the member's edge. All
members shall be cut mechanically by saw or shear or by oxyacetylene flame.
1.2 Welding shall generally be done by electric process. Gas welding shall be restored to using
oxyacetylene flame with specific approval. Gas welding shall not be permitted for structural steel
1.3 The work shall be done as shown in the shop drawings which should clearly indicate various
details of the joints to be welded; shop and site welded as well as type of electrodes to be used.
Symbol for welding on plans and shop drawing shall be according to I.S. 813-1961. As far as possible
every effort shall be made to limit the welding that must be done after improper welding that is likely
to be done due to heights and difficult position on scaffolding etc. The welding work shall conform to
1.4 Preparation of surface :
Surfaces, which are to be welded together, shall be free from loose mill scale, rust, paint, grease or
other foreign matter. A coating of boiled linseed oil shall be permitted.
1.5 Assembly for welding :
Before welding is commenced, the plates shall be first be brought together and firmly clamped or
spot welded at specified distance. The temporary connection in form of tack welding has to be strong
enough to hold the plates accurately in place without displacement and shall be done keeping in view
the finished dimensions of the structure.
1.6 Precautions :
The operations connected with welding and cutting equipment shall conform to safety requirement
given in I.S. 818-1968.
The following points shall be borne in mind during the process of welding:
(a) Welds shall be made in flat position wherever practicable.
(b) Arc length, voltage and amperage shall be suited to the thickness of material, type of groove and
other circumstances of the work.
(c) The segments of welding shall be such that where possible, the members which offer the greatest
resistance to compression are welded first.
(d) Proper care shall be taken while welding, for shrinkage and distortions, as the drawing dimensions
are the finished dimensions of the structure.
1.7 The defective welds which shall be considered harmful to the strength shall cut out and rewelded.
1.8 Finished welds and adjacent part shall be protected with clean boiled linseed oil and after all stag
has been removed welds and adjacent parts shall be painted after the same are approved.
1.9 All the members shall be thoroughly cleaned of rust, cakes, dust etc. and given a priming coat
with epoxy primer before fixing them in position. All fabricated members shall be suitably packed to
be protected from any damage while transportation, if any.
1.10 Grinding to the finished level is to be done, if directed by the Architects and Engineer in charge.
All exposed weld shall be ground smooth. Welds which have not been ground shall be scrubbed with
a 10% solution of Hydrochloric acid which shall be washed off with water before painting unless alkali
resistant paint is used.
1.11 Erection in general, of the entire/part structure shall be carried out as per the requirement and
approval of the Engineer-in-charge. Positioning and leveling of the structure, alignment and plumbing
and fixing every member of the structure shall be in accordance with the relevant drawings and to the
complete satisfaction of the Engineer-in-charge. The following checking and inspection shall be
carried out before, during and after erection: - Damages during transportation
- Accuracy of alignment of structures
- Erection according to drawings and relevant specifications
Ahmedabad Municipal Corporation
- Progress and workmanship
1.12 After total erection, second coat of expoxy primer and teo to three coat of PU paint of approved
make and shade shall be apply as per manufacturer’s specification.
2.0 Mode of Measurements and Payment:
2.1 (a) All work shall be measured on the basis of finished dimensions, as fixed on site and measured
net unless specified otherwise.
(b) The weight of steel sections, steel strips in finished works shall be calculated from standard weight
on the same basis on which steel is supplied to the Contractor by the Client or those given in relevant
IS Codes, if steel is arranged by the contractor.
(c) The weight of steel plates and strips shall be taken from relevant IS Codes, based on 7.85 kg/m² for
every mm. sheet thickness, if steel is supplied by the Contractor, otherwise, the weight shall be
calculated on the basis on which steel is supplied to the Contractor by the Client.
(d) Unless otherwise specified weight of cleats, brackets, packing pieces, bolts, nuts, washers,
distance pieces, separators, diaphragm gusset (taking over all square dimension) fish plates etc. shall
be added to the weight of respective items.
(e) In riveted work, allowance shall be made for weight of rivet heads. No deductions shall be made
for rivet or bolt holes excluding holes for anchor or holding down bolts.
(f) For forged steel and steel castings, weight shall be calculated on the basis of 7850 kg/m3.
(g) Unless otherwise specified an addition of 2.5% of the weight of structure shall be made for shop
and site rivet heads in riveted steel structure.
(h) Dimensions other than cross sections and thickness of plates shall be measured to nearest
(i) Mill tolerance shall be ignored when weight is determined by calculation.
2.2 The rate includes cost of all material, labour, erection, hoisting, scaffolding, safety measures and
sundry required for proper completion of the item of work, at all heights. This shall also include
conveyance and delivery, handling, loading, unloading and storing etc. required for completion the
item described above including necessary wastage involved. In case of CNC work, extra cost of CNC
work shall be paid in relevant tender item.
2.3 Only standard sectional weight will be considered and welding will not be considered in weight.
The Measurement of the item shall be in Kg basis.
Removing and refixing existing railing (upto 0.60 mt height) as a barricadding or diversion lane as
per requirement of project execution stage and as directed by engineer in charge. Rate shall be
inclusive of required foundation and steel member for fixing of railing. After completion of work,
contractor shall dispose all material related to railing/ barricading i.e. disposal of unserviceable
material with all lifts and up to any lead at non objectional place and stacking the serviceable
material (structural elements) upto AMC store including loading, unloading as directed by Engineer-
Item shall be executed as per item description and as directed by engineer in charge.
The mode of payment shall be in per Rmt basis.
Providing & laying in position Ready Mixed M-200 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10kms
having continuous agitated mixer, manufactured as per mixed design of specified grade for
reinforced cement concrete work including pumping of R.M.C from transitmixer to site of
laying,excluding the cost of centering, shuttering, finishing and reinforcement including the cost
of admixtures in recommended proportions as per I.S:9103 to accelarate/retard setting of
concrete, improve workability without impairing strength and durability as per direction of the
Engineer-in-charge Without Fly Ash(Minimium cement level as per latest I.S:456shall be
Ahmedabad Municipal Corporation
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative.
Mode of measurements shall be on CMT basis.
Providing & Applying Tri mix with Machine floater machine on constructed RCC work including
Machine & Labour etc Comp as directed.
The workmanship and the finishing qualities along with the quality of the materials shall be as
finalized by Engineer-In-Charge.
The Measurement of the item shall be in Smt. basis.
Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering,
ramming etc comp. as dir. For pavement aI) Laying on Sand bedding as per requirement to fix the
C.C.Block / Nibhada Stone in Line & Level
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on Smt. basis.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for Central Verge in M-20
grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya or equivalent
quality for pre-cast blocks, reasonably exposed finish/ formwork, mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.
The rate shall also include the flush pointing in CM (1:3) for all joints of the kerb stones. Filling of
zari alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production.
The specifiction of following materials shall be conforming with specification mentioned for relavent
material / items in General technical specification for building work of R&B Department of Gujarat.
Water shall conform to M-1
Graded stone aggregate 20 mm. nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the precast blocks. These machineries should be
compatible to produce blocks of required strength and dimensions. The machine shall contain
hydraulic Press or advanced equipment to generate required compaction & Grade and finish.
Moulds/ Steel Plates/ Dies of the machine shall be dimensionally checked & to be got approved
before commencing the production. Contractor shall prepare proper Drying Yard for keeping the
blocks before curing. The drying yard shall be levelled and covered so that no shrinkage cracks are
Ahmedabad Municipal Corporation
formed. Contractor shall prepare adequate size curing pond to cure the blocks for not less than
Days. No other means of curing shall be allowed. The technical specification of concrete shall confirm
to IS 456-2000. The concrete mix is not required to be designed and only nominal mix as per IS: 456-
2000 shall be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement: 1.5 coarse
sand: 3 graded stone aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly
exposed concrete surface or as specified in the item. The designation ordinary M-10, M-15, M-20, M-
25 specified as per I.S. corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of
ordinary concrete, by volume respectively. The ingredients required for ordinary concrete containing
one bag of cement of 50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS
456-2000. The proportion of the aggregate for the kerb stone shall be modified as per the approval of
the engineer-in-charge. The water cement ratios shall not be more than those specified as per IS. The
cement of the mix shall be increased, if the quantity of water in a mix has to be increased to
overcome the difficulties of placement and compaction so that the water cement ratio specified in
the table is not exceeded. The maximum size of coarse aggregate shall be as large as possible within
the limits specified but in no case greater than 1/4th of the minimum thickness of the member,
provided that the concrete can be placed without difficulty so as to surround all reinforcement
thoroughly and to fill the corners of the form. For reinforced concrete work, coarse aggregates having
a nominal size of 20 mm. are generally considered satisfactory. Admixture shall be used in concrete
only with approval of the Engineer-in-charge based upon the evidence that with the passage of time,
neither the compressive strength of concrete is reduced nor are other requisite qualities of concrete
impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
50 kg weight. The volume of one such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be
used for measuring sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and
38 cm. deep. While measuring the aggregate and sand, the box shall be filled without shaking
ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case
of damp sand; allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall
be kept in first class working condition and maintained throughout the construction. Measured
quantity of aggregate, sand, and cement required for each batch shall be poured into the drum of
the mechanical mixer while it is continuously running. After about half a minute of dry-mixing,
measured quantity of water required for each batch of concrete mix shall be added gradually and
mixing continued for another one and a half minute. Mixing shall be continued till materials are
uniformly distributed and uniform colour of the entire mass is obtained and each individual particle of
the coarse aggregate shows complete coating of mortar containing its proportionate amount of
cement. In no case shall the mixing be done for less than 2 minutes after all ingredients have been
put into the mixer. Mixers which have been out of use for more than 30 minutes shall be thoroughly
cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first
batch of concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate.
Mixing plant shall be thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration
of concrete shall be determined by regular slump tests in accordance with IS: 1199-1959. The slump
of 10 mm. to 25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately
before placing of concrete.
Ahmedabad Municipal Corporation
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the
precast blocks shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall
be checked accordingly. Moulds shall be regularly checked for correctness of dimensions of Blocks,
twists, bends due to handling, etc. Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as
specified) and plumb. Form work/Mould propping shall be strong, rigid, and sturdy. The form
work/Mould shall be as per pattern & design shown in drawings. Form work/Mould shall be done
accurately and precisely so as to achieve neat, clean and smooth concrete surface, in line, level and
plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before
placing concrete, forms shall be thoroughly cleaned off of all rust, dust, and loose materials.
Colourless oil or grease of approved quality shall be applied before placing steel. Also the form work
material will be of wood/plywood/steel or any sort of such material, as approved by the Engineer-in-
Charge and/or his authorized representative; so that all exposed concrete surfaces have uniform
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of
cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks
shall gain strength to withstand the stresses generated due to self weight and handling to drying
yards without any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from
the block before it is actually sent to the site. Time should be provided for proper draining of water
which may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading
to breaking of block. Care should be taken to prevent the block from breaking during transporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level.
The relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled
with a layer of 50mm. thick sand bedding. The curbs then shall be placed in position of which 50mm.
shall be below road. Care should be taken to maintain proper line and level. The joints between the
kerbs shall be pointed with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling
Ahmedabad Municipal Corporation
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested i.e. the sampling should be spread over the entire period of concreting and cover all
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample,
5 for testing at 7 days, and the remaining 5 at 28 days. The samples of concrete shall be taken on
each day of the concreting as per above frequency. The number of specimens may be suitably
increased as deemed necessary by the Engineer-in-charge when procedure of tests given above
reveals a poor quality of concrete and in other special cases. The average strength of the group of
cubes cast for each day shall not be less than the specified cube strength of 200 Kg/cm2 at 28 days.
20% of the cubes cast for each day may have value less than the specified strength provided the
lowest value is not less than 85% of the specified strength. If the concrete made in accordance with
the proportions given for a particular grade, does not yield the specified strength, such concrete shall
be classified as belonging to the appropriate lower grade. Concrete made in accordance with the
proportions given for a particular grade shall not, however, be placed in a higher grade on the ground
that the test strength are higher than the minimum specified. If rock pockets/honeycombs in the
opinion of Engineer-in-charge are of such an extent or character so as to affect the strength of the
structure, materially or to endanger the life of the steel reinforcement, he may declare the concrete
defective and require the removal and replacement of the portion of the structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall
be carried out for precast concrete kerb stones as specified in the item. All Precast members shall be
cast at workshop. Sufficient curing shall be done before placement of the same the method of
transporting and placing the precast members shall be as approved by the Engineer-in-charge.
Members shall be so transported that no breakage or undue stresses are induced in them. If required,
all members shall have a key provided on both the faces i.e top and bottom surfaces, of adequate size
so as to fill the same with concrete while laying. The function of this key is to avoid the leakage
through the joint between the precast member and the member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
The rate shall be for a unit of Rmt.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade
using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya or equivalent quality
for pre-cast blocks, reasonably exposed finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.
The rate shall also include the flush pointing in CM (1:3) for all joints of the kerbstones. Filling of
zari alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production.
Specification as per Item No. 40 only size of kerb as mentioned in Abstract.
Ahmedabad Municipal Corporation
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of
any size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm
nominal size for footpath, parking areas, service lanes and other areas as mentioned in the drawing
/ instruction of Engineer-in-Charge and/or his authorized representative. Cost includes formworks
using rubber mould, Rate providing and laying paver blocks as per required grading and
specification. The paver block shall be mechanically compacted. The work of paving blocks shall be
executed in line and level by skill mason of flooring work only. It should be laid in such a way that
the no cutting of the paver block to be necessary. if cutting of paver block necessary then it should
be cut by machine only and carting. The finished surface of the paver block shall have resonably
good, plain finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel or
such type of materials shall not be allowed for production. Laying on 50 mm thick sand bedding.
• Laying on 50 mm thick sand bedding.
48.1 Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum
including sorting outs and stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various
Retail outlets. The work includes: Verification of the existing site condition and advising our project in
charge to lay suitable base course if required. Contractors are required to satisfy themselves with
quality of sub grade, sub-base course before the paver blocks are laid and suggest strengthening if
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand
bedding, within shortest possible time the site is public place hence care should be taken to ensure
that the routine activities should not be disturbed. The job of laying may required to be carried out
during night also.
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of
test results as per requirements in Technical Specifications. AMC reserves the right to carryout test at
random. Cost for such tests to be borne by party. The contractor shall guarantee that all material and
components designed, fabricated, supplied, and laid by him shall be free from any type of defect due
to faulty material and/or workmanship/erection for a period of One year from the date of completion
of work. However, the contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
48.2 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
48.2.1 Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level
of compaction by application of hydraulic compaction and also by high intensity vibration to
the moulds. The machine should have automatic control panel
for uniformity in strength.
48.2.2 Concrete Batching & Mixing Plant: (Not essential)
Ahmedabad Municipal Corporation
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water
cement ratio from batch to batch to obtain concrete of uniform quality and strength. The
plant should be equipped with adequate mechanism for mechanized loading of raw materials
into mixer and conveyor belt for transportation of concrete from mixer to concrete block
making machine to maintain quality of wet cement.
48.2.3 The factory should have well designed curing area to ensure adequate curing of paver blocks.
48.2.4 Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following:
A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory.
Concrete Mix Design for various grade of concrete used for making of paver blocks.
48.3 Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or
equivalent approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS”
with minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as
selected by AMC before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of
months from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured
pavers will be as per attachment.
48.4 Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the
same should be retained until the laying. The surface should be reasonably smooth and of
anti skid and anti glare type. The paver should have uniform chamfers to facilitate easy
drainage surface run off. The pavers should have uniform interlocking space of 2mm to 3mm
to ensure compacted sand filling after vibration on the paver Surface. The concrete mix
design should be followed for each batch of materials separately and automatic batching
plant is to be used to achieve uniformity in strength and quality. The pavers shall be
manufactured in single layer only. Skilled labour should be employed for laying blocks to
ensure line and level of laying, desired shape of the surface and adequate compaction of the
sand in the joints. The pavers shall be of cement gray colour without any pigment & for
coloured pavers refer “specifications for coloured pave`” The pavers are to be skirted all
round with kerbing using solid concrete blocks of size 150mm X 250mm X 380mm. The
kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
48.5 Paver Block Dimensions:
Ahmedabad Municipal Corporation
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
48.6 Testing of Paver Blocks :
* TEST Average Values Frequency
1. Compressive Strength Min. 35 N/Sq mm for 250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
48.7 Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
48.7.1 Sampling for Testing
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks,
shall be divided into ten approximately equal groups. Three blocks shall be drawn from each
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated
section of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until
they have been tested. The testing shall be carried as soon as possible, after the sample has
been taken. As soon as practicable after sampling. The samples shall be stored in water at
degree C 5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-
Charge and/or his authorized representative using Rubber mould and Table vibrator for Kerb
instead of mechanical press system.
Extra rate for excavation of asphalt payment of any thickness including demolishing the
asphalt carpet, metal, soling etc. complete with stacking the materials as directed. The road
surface of asphalt shall carefully be opened to full width as directed by the Engineer-in-
Charge and/or his authorized representative.
Ahmedabad Municipal Corporation
Excavation area shall be properly identified and marked in rectangular shape. The road crust
shall be opened up to entire depth i.e. including soling. All the materials shall be separately
deposited in such a way and in places as may be determined by the Engineer-in-Charge
and/or his authorized representative. In case rubble not being so deposited or being mixed
up with the excavated materials will not be allowed for refilling. The cost of materials shall be
charged from the contractor. The decision of the C.E. shall be final and binding to the contract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department
booklet for General Technical Specification for building works.
The rate shall be for a unit of SMT
Supplying and fixing Nimbhada ladi 37 to 50 mm thick for walk-way, covering the
activity of excavation, ramming, Laying on sand bedding as per requirement to fix the
Nibhada Stone in Line & Level with cement pointing in cement mortar 1:2 etc complete
1.Nimbhada stone : The material shall conform to M-48 Page No.-16 except that the
stone shall be of ordinary nimbhada stone instead of rough kota stone .
2. Sand : As per buiding booklet M-6 Page No.4.
3.Cement : As per buiding booklet M-3 Page No.3.
The work man ship shall conform to buiding booklet section no. 14,-14.46 (A),
Mode of measurment shall be on smt basis
Labour work of fixing kurb any design of central verge, (both side) footpath kurb, items includes
necessary excavation, asphalt cutting of any thickness, erecting in line and position and pointing
with cement mortar (1:3), watering, etc complete, filling with zari along the side of the kurb, the
kurb stone fix prepared with bitumnious top surface, as directed by engineer in charge.
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on RMT basis.
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm thick sand
bedding, leveling, watering and fixing in line & level as well cleaning the site etc. comp. as directed
Specification as per Item No. 51 only work as mentioned in Abstract.
Bitumen Cutting
Labour charge of cutting in bituminous pavement. Cutting to be done with heavy duty tandom
cutting machine consist of diamond blade. Minimum cutting depth shall be 75 mm from the
finished level. Cutting shall be perfeclty in line. The width and depth of the removal of asphalt
towards kerb stone shall be as per the drawing. Bitumen shall be carefully removed so that the the
cutting edge towards the road should not be disturbed. The work of removal of the asphalt will be
considered in this item as running meter of the cutting done by machine. One cutting line will be
considered per length of the kerb stone. Bitumen and other debris shall be disposed within
Ahmedabad Municipal Corporation
km. as per the instruction of the engineer in charge. Surroundings shall be cleaned to the
satisfaction of the engineer in charge.
Cutting of Bituminous pavement for fixing of Kerb stone.
Marking shall be carried out to demarcate the exact location of the kerb stone to be fixed.
Cutting of the bituminous pavement shall be carried out by mechanical cutter only. The cutter
engaged shall be having a diamond blade.
The minimum cutting depth is of 75 mm..
All the debris generated shall be cleared and transported to a safe place as directed by Engineer-In-
Bitumen shall be removed without damaging the road edge. If damaged then the edge has to be cut
and removed and redone.
Surrounding shall be cleared and cleaned to the satisfaction of Engineer-In-Charge.
Mode of Measurement & Payment:
Rate shall be for per running mt of pavement cut.
Filling of Zari along the sides of the kerb stone fixed, prepared with Bituminous Concrete mixed in
proper proportion as directed by Engineer- In -Charge to form a pourable mixture.
The gaps left out after the fixing of kerbstone shall be filled and levelled.
The filling in Zari shall be done by Bituminous Concrete in proper proportion as directed by Engineer-
Care should be taken while pouring as to do the filling only upto the finished level of the road and
match the surface to the existing surface.
The workmanship and the finishing qualities along with he quality of the materials shall be as finalized
by Engineer-In-Charge.
The measurement shall be done as per the actual work done and the rate shall be for per Rmt.
Providing and applying Synthetic Enamel Paint on existing MS structural steel work with minimum
two coat of paint of approved make and shade including cleaning all dust, durt and other foreign
matters, sand papering, scaffolding etc with all material labour equipments for all height as
directed by engineer in charge.
Enamel Paint shall conform to M-44B.
The relevant specifications of CPWD specification Vol – II clause – 13.32 shall be followed. Paint
shall be applied on existing MS structural steel elements railing, fencing etc for all height all level.
Compound girders, stanchions, lattices, girder and similar work, actual area shall be measured in m
and no extra shall be paid for painting on bolts, heads, nuts, washers etc. No addition shall be made
to the weight calculated for the purpose of measurements of steel and iron works for paint applied at
Mode of Measurement and payment
Ahmedabad Municipal Corporation
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc.
required for the above specified operation, at all floors, at any height, in any position. Scrapping of
surface, washing etc. of surfaces spoiled by smoke, soot, removal of oil and grease spots, treatment
for infection with efflorescence, moulds, moss, fungi, algae and lichen shall not be paid extra. This
shall also include conveyance, delivery, handling, unloading, storing work etc. complete as per
engineer-in-charge.
The Measurement of the item shall be in Sqm basis.
Painting Two Coats on divider and footpath curb surface / New Concrete Surface (Painting two
coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete
Relevant specifications shall be followed as per item no – 70 except for application on concrete
surface i.e. kerb, divider instead of MS structure.
The Measurement of the item shall be in Sqm basis.
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm. In foundation and plinth in Cement Mortar 1:5. (1-Cement: 5 -fine sand)(B)
As per item decription and R&B book let or as decided by engineer in charge.
The Measurement of the item shall be in cmt.
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or half brick
walls for interior plastering upto floor two level and finished even and smooth in (i) Cement mortar
1:3 (1-cement:3-sand)
As per item decription and R&B book let or as decided by engineer in charge.
The Measurement of the item shall be in smt.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non
working condition of machinery and for pipe line excavation and M.H. work.Allowed only for break
down work) ( Based on Previously approved rate by C E sir)
Seal and Signature of the Bidder Add.City Engineer
Date: Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SZ E Tender Notice No 05 2026 2027 Tender No 218 Vol 1.pdf
SZ E Tender Notice No 05 2026 2027 Tender No 218 Vol 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].