Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -30.99% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹16.7 L (11.7%)Admitted-Finance | -22.89% | ₹1.6 Cr+₹16.7 L (11.7%) | L2 | Admitted-Finance |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
7 Aug 2026, 5:00 pmClosed
CHIEF CONSTRUCTION ENGINEER
Chief Construction Engineer Jeypore R and B circle Jeypore
Civil works
2026_EICCL_136987_1
C.C.E.J.C (R and B) - 08/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
210 days
Nabarangapur
3 documents required · 3 mandatory
₹10,000
₹2.1 L
Yes
17 Sept 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
24 Jul 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Works | 0.02 | cum | 0.02 | ₹0 |
| 2 | Dismantling and removing old R.C.C columns beams, slab, staircase, landing, lintels and cleaning the surface and lowering and removing the debries with all leads and lifts from the work site including cost of all labour with T&P required for the work etc. complete as directed by the Engineer-In-Charge. | 61.53 | cum | 1,731.8 | ₹1,06,557.65 |
| 3 | Dismantling and removing lime concrete flooring from 7.5 cm to 10 cm thick including stacking the useful materials for re-use and removing the debries away from the work site with all leads and lifts and all labour with T&P required for the work etc complete in all respect. | 66.25 | sqm | 147.37 | ₹9,763.26 |
| 4 | Earth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods maximum 5cm to 7cm & laying in layers not exceeding 0.3m depth for the work complete including shoring, shuttering & dewatering (if required) with cost of all Labour, Labour cess ,Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. (Ground Floor) | 236.79 | cum | 282.88 | ₹66,983.16 |
| 5 | (Paver Block) | 34.65 | cum | 282.88 | ₹9,801.79 |
| 6 | (Drain) | 28 | cum | 282.88 | ₹7,920.64 |
| 7 | (Boundary Wall) | 23.11 | cum | 282.88 | ₹6,537.36 |
| 8 | Supplying filling in F&P with sand including watering, ramming, poking & compacting including Cost, Conveyance, Royalties and Taxes of all materials and cost of all labour with T&P required for the work etc. complete as directed by Engineer-in-charge. (Ground Floor) | 51.1 | cum | 583.14 | ₹29,798.45 |
| 9 | (Paver Block) | 18.48 | cum | 583.14 | ₹10,776.43 |
| 10 | (Drain) | 4 | cum | 583.14 | ₹2,332.56 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 4.43 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_603184.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .