| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-Finance | L1 | Accepted-Finance as per L1 basis | |
| 2 | L2₹13.6 L+₹2.4 L (21.2%)Rejected-Finance | L2 | Rejected-Finance as per L1 basis |
| Sl No | Description | Qty | Unit | SHABNAM CONSTRUCTIONS L1 | PRASHANT TALAWADEKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of temporary bund along the bank of river with earth filled cement bags stacked in two rows of size 0.90m in width and 1.50 m high placed at 1.20 m apart including filling the gap between the rows with earth from borrow pit including neatly compacting the earth to minimize the seepage of water including cost of empty cement bags ,rope, earth, labour, transportation etc complete as directed by the Engineer in charge. | 28 | RM | 250 ₹7,000 Lowest | 8,702 ₹2,43,656 |
| 2.00 | Earth work in excavation in all types of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorum of all varieties shingles. pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling , wedging etc excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of Side and bottoms and disposing the excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc. complete. | 245 | Cum | 150 ₹36,750 Lowest | 334 ₹81,830 |
| 3.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 11.5 | Cum | 1,100 ₹12,650 Lowest | 1,252 ₹14,398 |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for :Foundations, footings, bases for columns and mass concrete. | 37.3 | Sqm | 600 ₹22,380 | 382 ₹14,248.6 Lowest |
| 5.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 179 | Sqm | 600 ₹1,07,400 | 453 ₹81,087 Lowest |
| 6.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level | 34.5 | Cum | 5,800 ₹2,00,100 Lowest | 6,108 ₹2,10,726 |
| 7.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 102.5 | Cum | 5,800 ₹5,94,500 Lowest | 6,557 ₹6,72,092.5 |
| 8.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge.
A) 110 mm dia | 42 | RM | 180 ₹7,560 Lowest | 351 ₹14,742 |
| 9.00 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 98 | Sqm | 1,300 ₹1,27,400 | 185 ₹18,130 Lowest |
| 10.00 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 53 | Cum | 119 ₹6,307 Lowest | 177 ₹9,381 |
Tender Value
₹15.7 L
EMD Value
₹31,418
Closing Date
12 Jan 2022, 5:30 pmClosed
Executive Engineer
Executive Engineer, WRD, WDVI, Bicholim
Construction of protection wall to the property bearing survey No. 508/56 at Nanora in Latambarcem village of Bicholim Taluka.
2021_WRD_2707_1
No.WRD/WDVI/Accts/F.17/TN-e- 47/2021-22/901 LINE 1
Open Tender
Civil Works - Water Works
Item Rate
45 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹31,418
7 Jan 2026
30 Dec 2021
13 Jan 2022
30 Dec 2021
12 Jan 2022
30 Dec 2021
Amount
Construction of temporary bund along the bank of river with earth filled cement bags stacked in two rows of size 0.90m in width and 1.50 m high placed at 1.20 m apart including filling the gap between the rows with earth from borrow pit including neatly compacting the earth to minimize the seepage of water including cost of empty cement bags ,rope, earth, labour, transportation etc complete as directed by the Engineer in charge.
Earth work in excavation in all types of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorum of all varieties shingles. pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling , wedging etc excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of Side and bottoms and disposing the excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for :Foundations, footings, bases for columns and mass concrete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge. A) 110 mm dia
12mm cement plaster 1:4 (1 cement : 4 fine sand)
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
PRASHANT TALAWADEKAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .