Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAdmitted-Finance | ₹4.9 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical NO 2 13 1ST PHASE PEENYA INDUSTRIAL AREA PEENYA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | - | - | Rejected-Technical Techno-Commercial Not-Acceptable |
| Sl No | Description | Qty | Unit | NonFerrous Materials Technology Development Centre (NFTDC) L1 |
|---|---|---|---|---|
| 1.00Design, Drawings, Manufacturing, Fabrications, Testing & Inspections, Factory Acceptance Tests, Supply and Site Acceptance Tests of Second Calorimeter alongwith Mandatory Spares at IPR as per the detailed specifications mentioned in the tender document. | ||||
| 1.01 | Design, Drawings, Manufacturing, fabrication, testing and supply including unloading of Second Calorimeter (alongwith mandatory spares) as mentioned in technical specification | 1 | System | 4,79,75,000 ₹4,79,75,000 Lowest |
| 1.02 | Site Acceptance test of Second Calorimeter assembly at IPR site | 1 | Job | 9,75,000 ₹9,75,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹9.6 L
Closing Date
10 May 2022, 1:00 pmClosed
Head - Purchase Secton
Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar-382428
Design, Drawings, Manufacturing, Fabrication, Testing, Inspection, Factory Acceptance Tests, Supply and Site Acceptance Tests of Second Calorimeter alongwith Mandatory Spares at IPR as per the detailed specifications mentioned in the tender document
2022_IPR_671927_1
IPR/TN/PUR/TPT/ET/21-22/041
Open Tender
Mechanical Tools and Equipment
Supply
730 days
IPR - Bhat, Gandhinagar
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹9.6 L
Yes
Through Video Conferencing
27 Jul 2022
4 Feb 2022
11 May 2022
4 Feb 2022
10 May 2022
20 Apr 2022
4 Feb 2022 - 24 Feb 2022
4 Mar 2022
Amount
Design, Drawings, Manufacturing, Fabrications, Testing & Inspections, Factory Acceptance Tests, Supply and Site Acceptance Tests of Second Calorimeter alongwith Mandatory Spares at IPR as per the detailed specifications mentioned in the tender document.
Design, Drawings, Manufacturing, fabrication, testing and supply including unloading of Second Calorimeter (alongwith mandatory spares) as mentioned in technical specification
Site Acceptance test of Second Calorimeter assembly at IPR site
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .