Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.6 L+₹16.9 L (217.9%)Admitted-Finance 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MEPF INFRA L1 | IRCLASS Systems and Solutions Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | The details of work of Project Management Consultancy is as follows:
i) To prepare Technical feasibility report.
ii) To prepare detailed project report.
iii) To preparing BOQ for Civil works (Construction of Pump house, Pump set beds etc.,) and for Mechanical and Electrical works.
iv) To supervise Installation of Fire Fighting pumps of capacity 75 HP Electrical motor driven pump - 1 no., 80 HP Diesel engine driven pump - 1 no., and 1 no 7.5 HP jockey pump will be supplied by ChPA.
v) To prepare detailed layout drawings for pumps and pipelines, Electrical and for construction of pump room.
vi) To prepare and submit the estimate with basis for preparation of the Estimate
vii) To assist ChPA in inviting Tenders, scrutiny and finalization of tender and award of work.
viii) To assist ChPA in supervision of subject execution work and installation of Fire fighting pumps supplied by ChPA till completion of work and issue of completion certificate. | 1 | LS | 7,75,000 ₹7,75,000 Lowest | 22,63,630 ₹22,63,630 |
| 2.00 | To get necessary statutory clearance from the state fire services. | 1 | LS | - | 2,00,000 ₹2,00,000 Lowest |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
11 Aug 2025, 2:30 pmClosed
Chief Mechanical Engineer
7th floor, Centenary building, No.1, Rajaji salai, Chennai- 600001
Engaging project management consultancy for shifting of fire fighting pump house to new location adjacent to the present location by about 25 mtrs for reducing distance of suction head at WQ IV Chennai Port Authority under two cover system
2025_ChPT_869618_1
MEE/15/2025/DyCME(W)
Open Tender
Consultancy
Works
153 days
Chennai Port Authority
As per tender
11 documents required · 11 mandatory
₹0
₹10,000
Yes
DyCME s Chamber
28 Aug 2025
18 Jul 2025
12 Aug 2025
19 Jul 2025
11 Aug 2025
26 Jul 2025
21 Jul 2025 - 1 Aug 2025
25 Jul 2025
The details of work of Project Management Consultancy is as follows: i) To prepare Technical feasibility report. ii) To prepare detailed project report. iii) To preparing BOQ for Civil works (Construction of Pump house, Pump set beds etc.,) and for Mechanical and Electrical works. iv) To supervise Installation of Fire Fighting pumps of capacity 75 HP Electrical motor driven pump - 1 no., 80 HP Diesel engine driven pump - 1 no., and 1 no 7.5 HP jockey pump will be supplied by ChPA. v) To prepare detailed layout drawings for pumps and pipelines, Electrical and for construction of pump room. vi) To prepare and submit the estimate with basis for preparation of the Estimate vii) To assist ChPA in inviting Tenders, scrutiny and finalization of tender and award of work. viii) To assist ChPA in supervision of subject execution work and installation of Fire fighting pumps supplied by ChPA till completion of work and issue of completion certificate.
To get necessary statutory clearance from the state fire services.
IRCLASS Systems and Solutions Private Limited (BID ID -3264309)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .