| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹7.8 L (7.15%)Admitted-Finance | ₹1.2 Cr+₹7.8 L (7.15%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹18.0 L (16.4%)Admitted-Finance | ₹1.3 Cr+₹18.0 L (16.4%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Work Experience not sufficient. |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L2 | M/S VINAYAK ASSOCIATE L1 | D N S ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 0.00Installation of additional 250 kVA distribution transformers and augmentation of existing 11/0.4 kV transformers at multiple substations under Electricity Urban Distribution Circle-I (EUDC-I), Prayagraj, as part of the Business Plan 2025–26. Scope includes loading, unloading, and safe carriage of all associated materials and equipment from the Central Store at Naini to designated dump sites and back, as required. (Centralize material as PCC/ST Pole, LT/HT Cable, ABC, T/F, Conductor, earthing Rod and Stay Rod will be provided by the department) | ||||||
| 1.00 | Supply, erection, and vertical installation of double pole structure using 11-meter long Steel Tubular Poles (STPs) for 11/0.4 kV, 250 kVA transformer mounting. Work includes excavation of pits, grouting with cement concrete mix (1:4:8), and firm erection of poles in line with UPPCL standard construction drawings. The scope further includes installation of all requisite components such as top channel (100x50 mm MS), transformer base channel (MS fabricated), pin insulators with GI pins, MS bracing angles, GI clamps, and base clamps. All associated hardware like GI nuts & bolts, washers, and welding where necessary will be arranged and installed by the contractor. The work shall comply with REC construction practices, UPPCL technical standards, and all site-specific requirements ensuring complete structural and electrical safety. | 47 | No. | 35,000 ₹16,45,000 | 30,000 ₹14,10,000 | 15,000 ₹7,05,000 Lowest |
| 2.00 | Supply and erection of 9 or 11 Meter long single support pole made of either Steel Tubular Pole (STP) or Pre-stressed Cement Concrete (PCC), including excavation of pit to standard depth, grouting with cement concrete mix (1:4:8), and proper vertical alignment of the pole as per UPPCL construction standards. The scope includes provision and fixing of all required GI bolts, nuts, and washers, as well as execution of necessary welding work to ensure structural integrity. All materials, labor, tools, and safety equipment shall be arranged by the contractor. The work shall conform to REC construction manual and UPPCL's technical and safety norms. | 184 | No. | 2,500 ₹4,60,000 | 1,800 ₹3,31,200 Lowest | 10,000 ₹18,40,000 |
| 3.00 | Grouting and plinth construction for 9/11 Meter long Steel Tubular Pole (STP) or Pre-stressed Cement Concrete (PCC) pole as per UPPCL standards. Grouting to be carried out using a 1:4:8 mix ratio (cement : stone grit : coarse sand), with pit depth and volume conforming to standard pole profiles. Construction of pedestal plinth of dimensions 0.4 x 0.45 x 0.3 Meter using cement, coarse sand, and brick ballast in 1:4:8 mix. Around the plinth, 12 mm thick plastering is to be done in cement mortar mix 1:2:4 (cement : coarse sand : brick dust) ensuring smooth finish and weather resistance. Proper curing for a minimum of 7 days must be ensured for durability under 11 kV line stress conditions. All required materials including cement, grit, sand, and brick ballast shall be arranged by the contractor. Work to be executed as per REC construction manual and UPPCL guidelines. | 278 | No. | 500 ₹1,39,000 Lowest | 1,500 ₹4,17,000 | 3,000 ₹8,34,000 |
| 4.00 | Earthing of 9/11 Meter long Steel Tubular Pole (STP) or Pre-stressed Cement Concrete (PCC) pole using mild steel (MS) earthing rod of minimum 16 mm diameter and 2.5 Meter length. The rod shall be driven vertically into the ground to the required depth, and connected to the pole using 8 SWG GI wire. Only the earthing rod and GI wire will be supplied by the department; all other materials such as excavation tools, clamps, bolts, concrete (if required), and backfilling materials (charcoal, salt, soil) shall be arranged by the contractor. The work must be executed as per REC construction norms and UPPCL's approved earthing layout, ensuring a safe and low-resistance path to ground for operational safety. | 278 | No. | 50 ₹13,900 Lowest | 1,500 ₹4,17,000 | 1,500 ₹4,17,000 |
| 5.00 | Surface preparation and painting of 9/11 Meter long Steel Tubular (ST) pole, including thorough cleaning to remove rust, dust, and grease followed by application of one coat of red oxide zinc chromate primer and one coat of high-grade aluminum paint. The painting shall be carried out using brushes or spraying method as per IS:1477 standards for corrosion protection. The contractor shall arrange all required materials including red oxide primer, aluminum paint, thinners, brushes, scaffolding, and safety equipment. The work must ensure uniform coating and adherence to UPPCL's prescribed specifications for aesthetic finish and weather resistance. | 278 | No. | 75 ₹20,850 Lowest | 500 ₹1,39,000 | 800 ₹2,22,400 |
| 6.00 | Construction of transformer plinth of size 1.5 Meter x 1.5 Meter x 1.25 Meter for installation of 11/0.4 kV distribution transformers, including a 0.25 Meter deep plain cement concrete (PCC) foundation using a cement:sand:brick ballast mix in 1:5:10 ratio. Brickwork shall be done with first-class bricks, comprising a 0.95 Meter high wall of 0.35 Meter thickness on all sides, and the remaining height with 0.23 Meter thick wall. Masonry shall be executed in cement-sand mortar of 1:4 ratio. The hollow core shall be backfilled with clean, dry sand up to 15 cm below the top level, followed by cement concrete filling in 1:2:4 mix. Two Mild Steel Channels of size 50x100x1500 mm (ISMC – Indian Standard Medium Channel) shall be placed and grouted in concrete to serve as transformer base supports. The entire structure shall be plastered on all sides with 12 mm thick cement mortar in 1:6 ratio. All materials including bricks, cement, sand, stone ballast, and ISMCs shall be supplied and arranged by the contractor at his own cost. Work execution shall conform strictly to UPPCL technical norms and REC construction manual. | 1 | Job | 35,000 ₹35,000 | 27,000 ₹27,000 Lowest | 70,000 ₹70,000 |
| 7.00 | Construction of retaining wall, fabrication and erection of wiremesh fencing 5' height with locking arrangement including grouting of fabricated MS Angle 40x40x5 mm, Painting of fencing and support with all material around 11/0.4 kV Substation with D.P. Box of size 2x (5+3x2) Sq.mm.. The fencing shall be made of 50x25 mm 10 SWG rectangular type of wiremesh. Wiremesh shall be fixed on panel made of 40x40x5 mm MS Angle Iron. The wiremesh on panel will be supported by 25x3 mm MS Flat on all the bracings diagonally and 40x5 mm MS Angle iron horizontally at the centre of the panel. The panel will be jointed by bolts and nuts of appropriate size with each other and on the main support of the corner. (All materials will be arranged by the contractor at his own cost.) | 16 | RMT | 1,900 ₹30,400 Lowest | 3,000 ₹48,000 | 5,500 ₹88,000 |
| 8.00 | Installation and commissioning of 250 kVA and 400 kVA, 11/0.4 kV outdoor distribution transformers, including complete HT and LT connections using double-decker (DD) insulated bunched conductor or XLPE cable as per site load requirements. The 250 kVA transformer shall be installed on a double pole (DP) structure with proper MS channel supports, bracing, and clamping, while the 400 kVA transformer shall be mounted on a brick masonry plinth constructed to UPPCL specifications. Work includes fitting and alignment of HT fuse set unit and Gang Operating (GO) switch set with all associated accessories and fasteners (GI nuts, bolts, and washers) to be supplied and installed by the contractor. All terminations must be securely crimped using appropriate lugs and insulated using heat-shrink sleeves. Body and neutral earthing shall be completed using chemical or MS pipe earthing as per REC/UPPCL standards.** All pre-commissioning checks—such as continuity testing, insulation resistance (IR) testing, torque verification of terminations, polarity checks, and no-load testing—shall be carried out entirely by the contractor.** The scope of work shall strictly adhere to UPPCL technical specifications and REC construction norms, ensuring safe, durable, and complete energization of both transformers. | 51 | Job | 34,999 ₹17,84,949 | 32,000 ₹16,32,000 | 25,000 ₹12,75,000 Lowest |
| 9.00 | Chemical earthing of transformer body by lowering 1.5-inch (approximately 40 mm) diameter, 3 Meter (10 feet) long hot-dip galvanized GI pipe vertically into the ground to serve as an earth electrode. The pipe shall be backfilled with a chemical compound consisting of bentonite, salt, and charcoal to ensure low earth resistance. The earthing electrode shall be connected to the transformer body at two separate points using 50 mm x 6 mm GI strip with bolted clamps, ensuring proper mechanical and electrical contact. The entire arrangement shall conform to REC and UPPCL earthing standards for 11/0.4 kV transformer installations. All materials including GI pipe, GI strip, clamps, and chemical backfill shall be arranged by the contractor at his own cost | 51 | Job | 7,500 ₹3,82,500 | 6,000 ₹3,06,000 Lowest | 15,000 ₹7,65,000 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
9 Sept 2025, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2025_PVVNV_1067414_1
09/SE/EUDC-I-Pra/2025-26
Open Tender
Electrical Works
Lump-sum
180 days
EUDC-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Account Number-0012002100504911
₹1.4 L
25 Sept 2025
25 Aug 2025
9 Sept 2025
25 Aug 2025
9 Sept 2025
25 Aug 2025
Amount
Installation of additional 250 kVA distribution transformers and augmentation of existing 11/0.4 kV transformers at multiple substations under Electricity Urban Distribution Circle-I (EUDC-I), Prayagraj, as part of the Business Plan 2025–26. Scope includes loading, unloading, and safe carriage of all associated materials and equipment from the Central Store at Naini to designated dump sites and back, as required. (Centralize material as PCC/ST Pole, LT/HT Cable, ABC, T/F, Conductor, earthing Rod and Stay Rod will be provided by the department)
Supply, erection, and vertical installation of double pole structure using 11-meter long Steel Tubular Poles (STPs) for 11/0.4 kV, 250 kVA transformer mounting. Work includes excavation of pits, grouting with cement concrete mix (1:4:8), and firm erection of poles in line with UPPCL standard construction drawings. The scope further includes installation of all requisite components such as top channel (100x50 mm MS), transformer base channel (MS fabricated), pin insulators with GI pins, MS bracing angles, GI clamps, and base clamps. All associated hardware like GI nuts & bolts, washers, and welding where necessary will be arranged and installed by the contractor. The work shall comply with REC construction practices, UPPCL technical standards, and all site-specific requirements ensuring complete structural and electrical safety.
Supply and erection of 9 or 11 Meter long single support pole made of either Steel Tubular Pole (STP) or Pre-stressed Cement Concrete (PCC), including excavation of pit to standard depth, grouting with cement concrete mix (1:4:8), and proper vertical alignment of the pole as per UPPCL construction standards. The scope includes provision and fixing of all required GI bolts, nuts, and washers, as well as execution of necessary welding work to ensure structural integrity. All materials, labor, tools, and safety equipment shall be arranged by the contractor. The work shall conform to REC construction manual and UPPCL's technical and safety norms.
Grouting and plinth construction for 9/11 Meter long Steel Tubular Pole (STP) or Pre-stressed Cement Concrete (PCC) pole as per UPPCL standards. Grouting to be carried out using a 1:4:8 mix ratio (cement : stone grit : coarse sand), with pit depth and volume conforming to standard pole profiles. Construction of pedestal plinth of dimensions 0.4 x 0.45 x 0.3 Meter using cement, coarse sand, and brick ballast in 1:4:8 mix. Around the plinth, 12 mm thick plastering is to be done in cement mortar mix 1:2:4 (cement : coarse sand : brick dust) ensuring smooth finish and weather resistance. Proper curing for a minimum of 7 days must be ensured for durability under 11 kV line stress conditions. All required materials including cement, grit, sand, and brick ballast shall be arranged by the contractor. Work to be executed as per REC construction manual and UPPCL guidelines.
Earthing of 9/11 Meter long Steel Tubular Pole (STP) or Pre-stressed Cement Concrete (PCC) pole using mild steel (MS) earthing rod of minimum 16 mm diameter and 2.5 Meter length. The rod shall be driven vertically into the ground to the required depth, and connected to the pole using 8 SWG GI wire. Only the earthing rod and GI wire will be supplied by the department; all other materials such as excavation tools, clamps, bolts, concrete (if required), and backfilling materials (charcoal, salt, soil) shall be arranged by the contractor. The work must be executed as per REC construction norms and UPPCL's approved earthing layout, ensuring a safe and low-resistance path to ground for operational safety.
Surface preparation and painting of 9/11 Meter long Steel Tubular (ST) pole, including thorough cleaning to remove rust, dust, and grease followed by application of one coat of red oxide zinc chromate primer and one coat of high-grade aluminum paint. The painting shall be carried out using brushes or spraying method as per IS:1477 standards for corrosion protection. The contractor shall arrange all required materials including red oxide primer, aluminum paint, thinners, brushes, scaffolding, and safety equipment. The work must ensure uniform coating and adherence to UPPCL's prescribed specifications for aesthetic finish and weather resistance.
Construction of transformer plinth of size 1.5 Meter x 1.5 Meter x 1.25 Meter for installation of 11/0.4 kV distribution transformers, including a 0.25 Meter deep plain cement concrete (PCC) foundation using a cement:sand:brick ballast mix in 1:5:10 ratio. Brickwork shall be done with first-class bricks, comprising a 0.95 Meter high wall of 0.35 Meter thickness on all sides, and the remaining height with 0.23 Meter thick wall. Masonry shall be executed in cement-sand mortar of 1:4 ratio. The hollow core shall be backfilled with clean, dry sand up to 15 cm below the top level, followed by cement concrete filling in 1:2:4 mix. Two Mild Steel Channels of size 50x100x1500 mm (ISMC – Indian Standard Medium Channel) shall be placed and grouted in concrete to serve as transformer base supports. The entire structure shall be plastered on all sides with 12 mm thick cement mortar in 1:6 ratio. All materials including bricks, cement, sand, stone ballast, and ISMCs shall be supplied and arranged by the contractor at his own cost. Work execution shall conform strictly to UPPCL technical norms and REC construction manual.
Construction of retaining wall, fabrication and erection of wiremesh fencing 5' height with locking arrangement including grouting of fabricated MS Angle 40x40x5 mm, Painting of fencing and support with all material around 11/0.4 kV Substation with D.P. Box of size 2x (5+3x2) Sq.mm.. The fencing shall be made of 50x25 mm 10 SWG rectangular type of wiremesh. Wiremesh shall be fixed on panel made of 40x40x5 mm MS Angle Iron. The wiremesh on panel will be supported by 25x3 mm MS Flat on all the bracings diagonally and 40x5 mm MS Angle iron horizontally at the centre of the panel. The panel will be jointed by bolts and nuts of appropriate size with each other and on the main support of the corner. (All materials will be arranged by the contractor at his own cost.)
Installation and commissioning of 250 kVA and 400 kVA, 11/0.4 kV outdoor distribution transformers, including complete HT and LT connections using double-decker (DD) insulated bunched conductor or XLPE cable as per site load requirements. The 250 kVA transformer shall be installed on a double pole (DP) structure with proper MS channel supports, bracing, and clamping, while the 400 kVA transformer shall be mounted on a brick masonry plinth constructed to UPPCL specifications. Work includes fitting and alignment of HT fuse set unit and Gang Operating (GO) switch set with all associated accessories and fasteners (GI nuts, bolts, and washers) to be supplied and installed by the contractor. All terminations must be securely crimped using appropriate lugs and insulated using heat-shrink sleeves. Body and neutral earthing shall be completed using chemical or MS pipe earthing as per REC/UPPCL standards.** All pre-commissioning checks—such as continuity testing, insulation resistance (IR) testing, torque verification of terminations, polarity checks, and no-load testing—shall be carried out entirely by the contractor.** The scope of work shall strictly adhere to UPPCL technical specifications and REC construction norms, ensuring safe, durable, and complete energization of both transformers.
Chemical earthing of transformer body by lowering 1.5-inch (approximately 40 mm) diameter, 3 Meter (10 feet) long hot-dip galvanized GI pipe vertically into the ground to serve as an earth electrode. The pipe shall be backfilled with a chemical compound consisting of bentonite, salt, and charcoal to ensure low earth resistance. The earthing electrode shall be connected to the transformer body at two separate points using 50 mm x 6 mm GI strip with bolted clamps, ensuring proper mechanical and electrical contact. The entire arrangement shall conform to REC and UPPCL earthing standards for 11/0.4 kV transformer installations. All materials including GI pipe, GI strip, clamps, and chemical backfill shall be arranged by the contractor at his own cost
Chemical earthing of transformer neutral by lowering a 1.5-inch (approximately 40 mm) diameter, 3 Meter (10 feet) long hot-dip galvanized GI pipe vertically into the ground to act as the earth electrode. The pipe shall be backfilled with chemical compound including bentonite, salt, and charcoal to achieve low earth resistance values. A 50 mm x 6 mm GI strip shall be used to connect the electrode to the neutral terminal of the transformer at one designated point using appropriate earthing clamps. All materials including GI pipe, GI strip, clamps, and chemical backfill shall be arranged by the contractor. The entire earthing setup must conform to UPPCL technical guidelines and REC construction norms applicable for 11/0.4 kV transformer neutral earthing.
Installation of 3 Nos. 11 kV polymeric Lightning Arrestors (LA) at transformer double pole (DP) structure, including proper mounting on GI brackets/LA base channel with required spacing and alignment as per UPPCL standards. Each LA shall be connected with earth via two separate earth pits. Earthing shall be carried out using 1.5-inch (approximately 40 mm) diameter, 3 Meter (10 feet) long hot-dip galvanized GI pipe electrodes, installed vertically and backfilled with chemical mixture (salt, charcoal, bentonite). Each electrode shall be connected to the LA base using 50 mm x 6 mm GI strip with clamps to ensure a low-resistance path. The entire installation shall conform to IS: 3070 (Part-3) and REC construction practices. All materials including LAs, GI pipes, GI strips, clamps, and chemical compound shall be arranged by the contractor at his own cost.
Installation and commissioning of LT (Low Tension) cubical distribution box comprising 1 No. 500A and 3 Nos. 300A tailless fuse units for outgoing feeders, mounted within a weatherproof MS cubical enclosure conforming to IS:8623 standards. The assembly shall include internal copper busbar interconnection using 50 mm x 6 mm electrolytic grade copper strip, duly insulated and supported with porcelain or epoxy insulators to ensure mechanical stability and electrical clearance. The copper strip shall be terminated with crimped lugs, and phase separation shall be ensured with heat-shrink sleeves. All materials including LT box, fuse units, copper busbar, insulators, clamps, fasteners, and consumables shall be arranged and installed by the contractor. The work shall conform to UPPCL technical guidelines and safety regulations for LT distribution systems.
Earthing of LT cubical distribution box using Mild Steel (MS) earthing rod as earth electrode. The LT panel body and neutral shall be earthed separately using 25 mm x 6 mm GI strips, clamped securely to the respective terminals. The MS rod (to be provided by the department) shall be driven vertically into the ground and connected to the GI strip using bolted earth clamps to ensure low-resistance grounding. All connections must be mechanically tight and electrically sound, with proper insulation and corrosion protection. All materials including GI strip, clamps, bolts, nuts, and accessories shall be arranged by the contractor, except for the MS earthing rod. Work shall comply with UPPCL earthing specifications and REC construction norms.
Laying or hanging of 3.5 core, 400/240/150/70 sq.mm XLPE insulated LT cable from the secondary terminals of the transformer to the LT cubical box, and further from the LT cubical box to the LT overhead line or service entry point. The cable shall be securely fixed using insulated copper Z/L clamps and tagged at each termination point. All terminations shall be carried out using properly crimped aluminum/copper lugs and covered with high-grade LT PVC insulation tape for phase identification and safety. Cable dressing shall be neat, avoiding sharp bends and ensuring mechanical protection. Only the LT cable shall be provided by the department; all other materials including lugs, clamps, PVC tape, hardware, and tools shall be arranged by the contractor. The installation shall conform to UPPCL technical specifications and IS:1255 for cable laying and termination.
Laying or hanging of 1-core LT XLPE insulated aluminum conductor cable of sizes 1x400/1000/630/240/70 sq.mm from transformer secondary terminals to LT cubical box and from the LT distribution box to LT overhead line or connection point. The work shall include proper termination with crimped aluminum lugs, dressing, tagging, and clamping using copper or GI Z/L clamps to prevent sagging or mechanical damage. Each termination shall be covered with LT-grade PVC insulation tape to ensure phase identification, weather protection, and safety. Only the LT cable shall be supplied by the department. All other materials such as aluminum lugs, Z/L clamps, PVC tape, nuts, bolts, and fixing hardware shall be provided and installed by the contractor as per site requirements. The entire work shall conform to IS:1255 and UPPCL-approved construction norms for LT cable systems.
Hanging and securing of 3x120/95 + 1x95 + 1x16 sqmm LT Aerial Bunched Cable (ABC) on already existing/erected pole, complete in all respects. The work includes provision and installation of all necessary accessories such as dead-end clamps, piercing connectors, suspension clamps with I-hooks, and three-phase LT distribution box (DB) with provision for neutral and earth. Proper mechanical anchoring and sag control shall be maintained. Terminations to be done using 1x25/35 sq.mm single core cable for connections between AB cable and LT DB, using crimped lugs, and insulated with heat-shrink sleeves or LT-grade PVC tape. The entire cable route shall be dressed properly, ensuring mechanical protection and electrical safety. Only LT AB cable shall be supplied by the department; all other materials including clamps, connectors, LT DB, lugs, and fixing accessories shall be arranged by the contractor as per site requirements. Work shall be executed in accordance with UPPCL standards and REC construction practices for LT overhead ABC systems.
Erection and grouting of stay rod for overhead line support using cement concrete mix in the ratio 1:4:8 (cement: sand: brick ballast), including excavation of pit, placement of stay rod at the specified angle, and thorough compaction of grouting. The work includes proper alignment and fastening of stay wire between the stay rod and the pole with secure nuzzling, ensuring mechanical stability of the line structure. Only the stay set (stay rod, thimble, stay insulator, and turnbuckle) shall be provided by the department. All other materials such as cement, sand, brick ballast, binding wire, clamps, and tools shall be arranged and utilized by the contractor. Execution shall follow UPPCL standard line erection diagrams and REC construction norms.
Stringing and tensioning of ACSR Dog/Weasel conductor to be used as neutral wire for Low Tension (LT) Aerial Bunched Cable (ABC) system, including installation or replacement as required. The work involves fixing of the conductor on poles using LT clamps, shackle insulators, and associated hardware such as GI bolts, nuts, and washers to ensure proper alignment, insulation, and mechanical stability. Sag and tension shall be maintained in accordance with REC and UPPCL standards. Only the ACSR conductor will be supplied by the department; all other materials such as insulators, clamps, binding wire, fasteners, and tools shall be arranged and used by the contractor as per site requirements.
Dismantling of existing 250/400/630 kVA, 11/0.4 kV outdoor distribution transformer from plinth or double pole (DP) structure, including complete disconnection of all HT and LT connections, earthing leads, and associated accessories such as GO switch, fuse set, busbars, clamps, and other fittings. The transformer shall be safely lowered to ground using chain pulley block or crane as per site condition, ensuring no damage during handling. After dismantling, the transformer shall be handed over to the Electricity Store Centre, Naini, Prayagraj, as directed by the Executive Engineer (site-in-charge). All tools, lifting arrangements, labor, transportation, and safety equipment shall be arranged by the contractor. The work must be executed strictly in accordance with UPPCL electrical safety regulations and standard dismantling procedures.
Hanging of 11 KV XLPE cable of size 3x70/120/185 sq.mm (as per site condition) on existing or newly constructed 9/11 Meter long PCC, STP, or Rail pole for LT distribution network. The cable shall be fixed using stay wire and MS stay clamps suitable for the respective pole type, ensuring secure anchoring and maintaining standard clearance. Stay clamps with GI bolts, nuts, and washers shall be arranged and installed by the contractor. Cable alignment shall be straight and sag-free, and all bends shall follow minimum bending radius norms as per IS:1255. The contractor shall ensure mechanical protection, tagging, and safety precautions throughout the execution. Work shall be carried out in accordance with UPPCL specifications and REC construction guidelines.
Laying of 11 kV, 3-core XLPE insulated, armored cable of size 70/120/185 sqmm through Horizontal Directional Drilling (HDD) method, including necessary jointing, terminations, protective coverings, and associated civil works as per specifications."
Supply and fixing of 11 Kv 3X70/3X120/3X185 sqmm outdoor box Heat Shrinkable (H.S.) type 11 kV termination and jointing kits for 1-core and 3-core XLPE insulated aluminum conductor cables of sizes 1x70, 3x70, 3x120, and 3x185 sqmm, including outdoor, indoor, and straight-through (S/T) configurations. The work shall include preparation of cable ends, stripping, crimping of suitable aluminum lugs, positioning and shrinking of heat shrink sleeves, application of sealing mastic, insulation and stress control tubing, earthing connection, and final sealing. All joints and terminations must ensure moisture resistance, electrical integrity, and mechanical strength, tested prior to energization. Termination boxes shall be mounted properly at designated locations (outdoor, indoor panel boards, or mid-run S/T joints). All materials including jointing kits, lugs, insulation sleeves, hardware, and tools shall be arranged by the contractor. The work shall conform to IS:13573 and UPPCL technical guidelines for 11 kV HT cable termination systems.
10 SWG Copper
12 SWG Copper
14 SWG Copper
18 SWG Copper
22 SWG Copper
26 SWG Copper
28 SWG Copper
GANGA ELECTRICALS (BID ID -5517480)
D N S ENTERPRISES (BID ID -5522385)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .