The work for Separate Delta Earthing of LA existing at 33/11 KV Substation under UETD-II, Sigra, Varanasi
Incresing Capacity of Semradh Bhadohi
Incresing Capacity Devri Uttar Mirzapur
For Attending 33/11 KV and LT, underground Cable/Outdoor/Indoor in area of UEDD-Bhelupur, Varanasi
Increasing Capacity of 33/11 KV S/S Sukhpura, Thekha Lokdham and Reoti Dist- Ballia
Increasing Capacity of 33/11 KV S/S Rasara, Karsar and Maldah Dist- Ballia
Increasingh Capacity of 33/11 KV S/S Mohabbatpur, Gopalganj and Kandharapur Dist-Azamgarh
Increasing Capacity of 33/11 KV S/S Bardah, Mehnagar Tahsil and Lalganj (jirikpur) Distt-Azamgarh
Work for Replacement of damaged PCC/ST Pole in EDD Khaga Fatehpur
Work for Shifting of Mughal Road Maharishi School to Korai during Road widening in EDD Fatehpur
Work for erection of pole in long span and replacement of jarjar wire in EDC Fatehpur
Extension of Control Room building at 33/11 Kv Substation-Katra Gulab Singh, District- Pratapgarh.
Extension of Control Room building at 33/11 Kv Substation-Jethawara, District-Pratapgarh.
Construction of Boundary Wall At 33/11 Kv S/S-Gaura, District-Pratapgarh
Civil Rectification and Strengthening work of Control Room Building At 33/11 Kv Substation-Dewari Uttar and Lalganj, District-Mirzapur
Rectification and strengthening work of office building and repair of toilet at Office of Electricity Distribution Division Chunar, District- Mirzapur
CONSTRUCTION OF PARKING SHED, REPLACING OF DOOR AND WINDOW AND PROVIDING SAFETY OF BOUNDARYWALL AT AWAS NO-06, HYDEL, DISTT-VARANASI.
REPAIR OF STORE ROOM AND RAISING OF EXISTING BOUNDARYWALL AT ELECTRICITY STORE CENTER RAJATALAB, VARANASI.
EXTENSION OF SGR AT 3311 KV SS ITWA GRAMIN DISTRICT SIDDHARTHNAGAR
Civil Work for Capacity increased at 3311 KV SS Padaribazar DIST Gorakhpur
EXTENSION OF SGR AT 3311 KV SS Barhaj OldDISTRICT Deoria
For the work of Earthing for 33 kV Lightning Arrester sanctioned under AdditionalBusiness Plan 2026-27 in areas under Electricity Urban Distribution Circle-Gorakhpur
T039/EDCK/2026-27
T038/EDCK/2026-27
Construction of 33 KV Independent Feeder from 220 KV Cant Substation to Dr. Rajendra Prasad National Law University Near IIIT Jhawla, Prayagraj Under EUDD-Bamrauli on Semi Turn Key Basis
Refer to Tender Description
Refer to Tender Description
11 METER STEEL TUBULAR POLE 410-SP-55 (HOT DIP GALVANIZED)
Work of applications received through Nivesh Mitra Portal, Jhatpat Portal, Rajkiya Nalkoop, Jal Nigam and Government Connection, Line Shifiting and Deposit Plan in the area of Executive Engineer, EDD- Chiraigaon.
FOR THE WORK Details of Separate Delta earthing LA structure of 33/11 KV Switchyard installed at various 33/11 Substations under Electricity Distribution Circle-I Gorakhpur
Work of separate earthing for lightning arresters installed on power transformers operational under 33/11 kV electrical substations under Electricity Distribution Circle, Sant Kabir Nagar.
Work of New Connection, (Jhatpat Portal, Nivesh Mitra) related to supply affording for the year 2026-27 and Deposit Plan in the area of Pindra, Harhua, Badagaon, and Nevada sub-divisions under the EE, EDD- Harahua, Varanasi
Work of shifting poles and transformers falling within the scope of the road widening and beautification of the Patpara and Chahaniya roads undertaken by the E.E., PWD, Chandauli under the Deposit Scheme in the EDD-Sakaldiha.
Work regarding separate earthing for Lightning Arresters installed on power transformers at 3311KV electrical substations under the EDD-Chandauli, Mughalsarai, Sakaldiha under ABP 2026-27.
Work of Electrification at Sri Arpit Todi, Urvija Beverages ALP, Novel Pack Industries LLP and Indian Oil Corporation Ltd.-Chandauli in the Deposite Scheme under EDD-Ist, Chandauli.
Work of replacement of 10/16KVA, 25KVA, 63KVA and 100KVA damaged transformer by new/repaired transformer with loading, unloading, reconnection, disconnection and carriage and dismantling of damaged T/F loading, unloading in EDD-IInd, Mughalsarai.
Work for laying of underground cable of 11 kv for giving connection to M/s Juneja Agro, in EDD- Bindki, Fatehpur
Work for Erection of 11 Kv Lines on semi turn key basisi under EDD Fatehpur
Work for Erection of 33 KV Bay in EDD Fatehpur
Work regarding the electricity connections at new locations (settlements) for families displaced due to land acquisition for the expansion of Lal Bahadur Shastri Airport, Babatpur, under the Deposit Plan by the EE, EDD- Harahua, Varanasi
Work of Electrification in Vill.-Tiyari near Ramakrishna Inter College, Construction of an independent feeder for Ms Maitri Engineering, 15 KW New Commercial Connection to Ms Radha Rani Fuel, Chandauli in the Deposite Scheme under EDD-Ist, Chandauli.
Separate Delta Earthing of LA.
Supply of Materials and Erection for Increasing Capacity of T/F installed at 33/11 KV S/s Handiya Gramin Distt. Prayagraj in MD Discretion Fund on Semi Turnkey Basis Under Prayagraj-II
Replacemet of defective Oil seal and Packing of the 5 MVA power transformer and Testing of Power transformer at 33/11 KV S/Ss Rupapur and Kadipur Pratapgarh
Supply of various types of stationery and repairing work of computers, printers, cartridges, UPS under EDD Pratapgarh
Supply of various types of stationery and repairing work of computers, printers, cartridges, UPS under EDC Pratapgarh
Supply of various types of stationery and repairing work of computers, printers, cartridges, UPS under EDD Kunda Pratapgarh
For Attending 33/11 KV and LT, underground Cable/Outdoor/Indoor in area of UEDD-Chaukaghat, Varanasi
For Guarding of 11 KV Line from 33/11 KV Substation in the area of UEDD-Marauli, Varanasi under Business Plan 2025-26.
11 KV AND 33 KV CABLE JOINTING KIT (DIFFERENT RATIO)